PA/05457/23: propose internal alterations at first floor level in San Pawl il-Bahar
18A, Bruno, Apt.1, Plajjet Bognor, San Pawl il-Bahar
To propose internal alterations at first floor level together with a new duplex level at third and fourth floor levels and extension of common parts to third floor level.
- Status
- Granted (This application has been approved by Planning Board / Commission.)
- Location
- 18A, Bruno, Apt.1, Plajjet Bognor, San Pawl il-Bahar
- Locality
- San Pawl il-Bahar
- Applicant
- Bernardette Borg
- Perit
- Perit Melanie Spiteri
- Application type
- Full development permission
- Zone
- Within Development Zone
- Type of works
- Alterations & Extensions (Residential)
- Height
- 4 floors
- Residential units
- 1
- Received
- 3 July 2023
- Validated
- 20 September 2023
- Published
- 20 September 2023
- Comments close
- 20 October 2023
- Recommendation
- Grant Permission
- Decision
- Grant Permission
- Decision date
- 16 February 2024
- Permit expires
- 28 February 2029
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around 18A, Bruno, Apt.1, Plajjet Bognor, San Pawl il-Bahar
9 other applications on the same street: 2 granted, 0 refused, 0 pending.
On Plajjet Bognor: 9 other applications, 2 granted and 0 refused. Periti active on this street: Mark Camilleri.
Approval estimate for alterations & extensions applications like this here: about 94% (likely range 64–100%, low reliability, from 0 comparable decisions nearby). No granted application nearby states a height to compare with. Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/05029/23 San Pawl il-Bahar: Proposed alterations and sanctioning of facade (close off of part of facade) and sanctioning of internal alterations to the internal shaft windows due to…
- PA/03212/23 San Pawl il-Bahar: Facade changes to include (a) the removal of temporary boards to be replaced with proposed laminated glass cement boards (closing off of part of façade (76cm)…
- PA/00227/20 San Pawl il-Bahar: Renewal of PA 02405/14 - To sanction changes to internal layout of approved plans, also in lieu with CTB619/12 and CTB 743/13 and carry out alterations at…
- PA/00348/21 San Pawl il-Bahar: Structural alterations to extend existing fifth floor apartment and construction of overlying receded penthouse.
- PA/01495/21 San Pawl il-Bahar: To sanction changes from approved permit PA/11040/17. Changes include internal alterations and the railing of the open balcony on facade.
- PA/01950/22 San Pawl il-Bahar: Extension of existing fourth floor and construction of fifth and receded sixth floor plus internal and external alterations to other levels.
- PA/02240/22 San Pawl il-Bahar: To construct an additional floor over an existing block of apartments to create a duplex unit at fifth floor level. The proposal also includes the extension…
- PA/02833/21 San Pawl il-Bahar: To demolish existing residences and construct one garage, seven apartments and a recessed floor level residence
- PA/00927/26 San Pawl il-Bahar: To sanction changes to apartment from PB/01871/92.
More by Melanie Spiteri
- PA/06924/26 Sliema: To sanction minor discrepancies from the approved permit to the as built.
- PA/06607/26 Siggiewi: Demolition of existing dwelling. The proposal includes the excavation for basement garages, with overlying Class 2C childcare and three floor and a receded…
- PA/06553/26 Nadur: To sanction minor discrepancies from permit PA6303/24 to as built receded dwelling unit.
- PA/06282/26 Xghajra: To make changes to property from approved permit PA/00203/16 by adding a garage and a lift, while extending the property by two floors and a receded floor.…
- PA/05957/26 Zabbar: To sanction internal layout changes which include shifting of bathroom and shower walls, wall between sitting and garage at ground floor. At first floor level…
- PA/05855/26 Marsaskala: To sanction internal alterations and configuration of the washroom and domestic store at third floor level.