---
title: "PA/05498/23: Minor internal and external alterations to existing in Zebbug (Gozo) |…"
url: https://propertylist.mt/permit/PA-05498-23/zebbug-gozo-minor-internal-and-external-alterations-to-existing
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-03
---

> Granted planning application in Zebbug (Gozo): Minor internal and external alterations to existing dwelling. Perit Joe Barbara. Validated 31 October 2023.

Planning applications › Zebbug (Gozo) › PA0549823

# PA/05498/23: Minor internal and external alterations to existing in Zebbug (Gozo)

Qbajjar, Green Hills 2, Triq is-Salini, Marsalforn, Zebbug (Gozo)

Minor internal and external alterations to existing dwelling.

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** Qbajjar, Green Hills 2, Triq is-Salini, Marsalforn, Zebbug (Gozo)
- **Locality:** [Zebbug (Gozo)](https://propertylist.mt/planning-applications/zebbug-gozo)
- **Applicant:** Gary Fiorini
- **Perit:** [Perit Joe Barbara](https://propertylist.mt/perit/joe-barbara)
- **Application type:** Full development permission - Summary Process
- **Zone:** Within Development Zone
- **Type of works:** Alterations & Extensions (Residential)
- **Received:** 22 June 2023
- **Validated:** 31 October 2023
- **Published:** 20 September 2023
- **Comments close:** 5 October 2023
- **Decision:** Acceptable
- **Permit expires:** 15 November 2028

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/05498/23)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=05498&caseYear=23)

## Planning activity around Qbajjar, Green Hills 2, Triq is-Salini, Marsalforn, Zebbug (Gozo)

38 other applications within 300 m: 30 granted, 1 refused, 2 pending. 97% of decided applications nearby were granted. Tallest granted nearby: 6 floors (PA/00803/26).

On Triq is-Salini: 12 other applications, 12 granted and 0 refused; granted buildings are typically 5 floors, the tallest 5. Periti active on this street: [Vella + Grech Periti](https://propertylist.mt/perit/vella-grech-periti), [Alexander Bigeni](https://propertylist.mt/perit/alexander-bigeni).

Approval estimate for alterations & extensions applications like this here: about 95% (likely range 65–100%, low reliability, from 8 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/05706/25** Zebbug (Gozo)](https://propertylist.mt/permit/PA-05706-25/zebbug-gozo-carry-out-extension-to-apartment-approved-in): To carry out extension to apartment approved in PA/04881/21. Alterations include changes to layout. Granted, validated 7 October 2025, 20 m away
- [**PA/04733/25** Zebbug (Gozo)](https://propertylist.mt/permit/PA-04733-25/zebbug-gozo-carry-out-alterations-to-apartments-approved-in): To carry out alterations to apartments approved in PA/03756/22. Granted, validated 22 August 2025, 20 m away
- [**PA/03205/25** Zebbug (Gozo)](https://propertylist.mt/permit/PA-03205-25/zebbug-gozo-renew-permission-pa5807-17-to-renew-permission): To renew permission PA5807/17 - To renew permission PA1531/12 - To renew permit PA6845/04 - To construct 3 storey basement garage and 3/4 storey apartment… Granted, validated 13 June 2025, 4 floors, 25 m away
- [**PA/03296/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-03296-26/zebbug-gozo-sanction-changes-consisting-of-site-configuration-and): To sanction changes consisting of site configuration and changes to two flats at fourth floor level and proposed changes to two flats at fifth floor level and… Granted, validated 1 July 2026, 5 floors plus a receded floor, 43 m away
- [**PA/08332/24** Zebbug (Gozo)](https://propertylist.mt/permit/PA-08332-24/zebbug-gozo-renew-permission-pa9788-19-to-extend-fifth): To renew permission PA9788/19 - To extend fifth floor to full floor; proposed flat at receded floor level approved in PA2488/16 and lowering of ceiling of… Granted, validated 21 January 2025, 5 floors plus a receded floor, 44 m away
- [**PA/04855/24** Zebbug (Gozo)](https://propertylist.mt/permit/PA-04855-24/zebbug-gozo-subdivide-two-flats-at-fourth-and-fifth): To subdivide two flats at fourth and fifth floor levels into four flats by the carrying out of internal alterations. Granted, validated 27 September 2024, 44 m away
- [**PA/01628/21** Zebbug (Gozo)](https://propertylist.mt/permit/PA-01628-21/zebbug-gozo-convert-existing-recessed-level-into-a-full): To convert existing recessed level into a full floor, and erect a new recessed floor above the existing. Status being checked, 44 m away
- [**PA/00072/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-00072-26/zebbug-gozo-carry-out-alterations-to-staircase-and-proposed): To carry out alterations to staircase and proposed lift. Granted, validated 10 March 2026, 49 m away
- [**PA/02747/24** Zebbug (Gozo)](https://propertylist.mt/permit/PA-02747-24/zebbug-gozo-extend-penthouse-approved-in-rg-02541-17-by-carrying): To extend penthouse approved in RG/02541/17 by carrying out alterations to layout and facade and to construct a penthouse on top. Granted, validated 20 August 2024, 67 m away
- [**PA/06671/23** Zebbug (Gozo)](https://propertylist.mt/permit/PA-06671-23/zebbug-gozo-sanction-shifting-of-internal-walls-and-reallocation): To sanction shifting of internal walls and reallocation of rooms. Granted, validated 5 January 2024, 71 m away
- [**PA/00803/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-00803-26/zebbug-gozo-alterations-and-additions-at-fifth-floor-level): Proposed alterations and additions at fifth floor level and to construct a penthouse at sixth floor level. Granted, validated 11 April 2026, 6 floors plus a receded floor, 75 m away
- [**PA/02160/24** Zebbug (Gozo)](https://propertylist.mt/permit/PA-02160-24/zebbug-gozo-alterations-and-additions-at-fifth-floor-level): Proposed alterations and additions at fifth floor level and to construct a penthouse at sixth floor level. Granted, validated 7 August 2024, 6 floors, 79 m away
- [**PA/03206/23** Zebbug (Gozo)](https://propertylist.mt/permit/PA-03206-23/zebbug-gozo-carry-out-alterations-and-extensions-to-residential): To carry out alterations and extensions to residential units approved in RG/01397/20 and to construct 2 additional penthouses on top. Granted, validated 6 June 2023, 79 m away
- [**PA/00832/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-00832-26/zebbug-gozo-excavate-the-site-for-the-construction-of): To excavate the site for the construction of a reservoir, two levels of basement garages, two maisonettes, fourteen apartments, and two recessed penthouses. Granted, validated 11 February 2026, 2 floors plus a receded floor, 85 m away
- [**PA/03575/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-03575-26/zebbug-gozo-partially-demolish-4th-floor-and-to-reconstruct): To partially demolish 4th floor and to reconstruct and extend 4th floor. Construction of flat including washroom and domestic store and duplex unit at 5th and… Granted, validated 17 August 2026, 6 floors, 90 m away

## More by Joe Barbara

- [**PA/07587/26** Qormi](https://propertylist.mt/permit/PA-07587-26/qormi-demolish-existing-dwellings): To demolish existing dwellings, excavate and construct 2 basement garages, 5 maisonette at ground floor level, 21 apartments from first till third floor (7… Pending, 4 floors
- [**PA/07169/26** Birkirkara](https://propertylist.mt/permit/PA-07169-26/birkirkara-demolition-of-existing-dwellings): Proposed demolition of existing dwellings, excavation of 2 levels basement, and construction of 15 private parking garages at basement levels, and 23… Pending, validated 14 October 2026
- [**PA/06814/26** Naxxar](https://propertylist.mt/permit/PA-06814-26/naxxar-make-internal-and-external-alteration-to-approved): To make internal and external alteration to approved penthouse PA1415/07 and to construct additional unit at penthouse level. Pending, validated 7 October 2026
- [**PA/06811/26** Swieqi](https://propertylist.mt/permit/PA-06811-26/swieqi-demolition-of-existing-dwelling): Proposed demolition of existing dwelling, excavation of 1 level semi-basement, and construction of 2 private parking spaces at basement level, and 5 dwellings… Pending, validated 7 October 2026, 3 floors plus a receded floor
- [**PA/06806/26** Mosta](https://propertylist.mt/permit/PA-06806-26/mosta-make-internal-and-external-changes-to-ground): To make internal and external changes to ground floor garage and store, demolish first floor and construct 3 units from first till third floor and a penthouse… Pending, validated 7 October 2026, 4 floors plus a receded floor
- [**PA/06793/26** Rabat](https://propertylist.mt/permit/PA-06793-26/rabat-demolition-of-existing-terraced-house): Proposed demolition of existing terraced house, and construction of a 12 room Class 3A guesthouse. Pending, validated 7 October 2026, 1 floor

[All applications by Joe Barbara](https://propertylist.mt/perit/joe-barbara)

[All planning applications in Zebbug (Gozo)](https://propertylist.mt/planning-applications/zebbug-gozo)
