propertylist

PA/05565/25: propose a surface in Paola

Pace Grasso Grounds, Triq is-Sorijiet c/w, Triq il-Knisja, Paola

To propose a surface, open-air parking to hold 219 cars (including 10 car spaces for electric cars and 9 car spaces accessible for all), a class 4C establishment, a public convenience area, installation of a structure for PV panels and 250cu.m. reservoir instead of the existing Pace Grasso grounds. Proposal is to include the restoration of the existing glacis, the stairs fronting Triq is-Sorijiet and the main entrance fronting Triq il-Knisja.

Status
Pending (Awaiting Recommendation)
Location
Pace Grasso Grounds, Triq is-Sorijiet c/w, Triq il-Knisja, Paola
Locality
Paola
Applicant
Steve Ellul
Perit
Perit Roberta Azzopardi
Application type
Full development permission
Zone
Within Development Zone
Type of works
Solar
Received
10 July 2025
Validated
24 December 2025
Published
24 December 2025
Comments close
2 February 2026

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around Pace Grasso Grounds, Triq is-Sorijiet c/w, Triq il-Knisja, Paola

155 other applications within 300 m: 116 granted, 3 refused, 10 pending. 97% of decided applications nearby were granted. Tallest granted nearby: 7 floors (PA/03641/24).

On Triq is-Sorijiet: 8 other applications, 8 granted and 0 refused; granted buildings are typically 3 floors, the tallest 3. Periti active on this street: John Demicoli, Mariello Spiteri.

Approval estimate for solar applications like this here: about 95% (likely range 65–100%, low reliability, from 4 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Roberta Azzopardi

All applications by Roberta Azzopardi

More from Steve Ellul

All planning applications in Paola