PA/05604/25: construct elevator within stairwell and to construct in St Julians
Block G, Triq Jean Houel, Ta Giorni, San Giljan
To construct elevator within stairwell and to construct ground floor ramp.
- Status
- Granted (This application has been approved by Planning Board / Commission.)
- Location
- Block G, Triq Jean Houel, Ta Giorni, San Giljan
- Locality
- St Julians
- Applicant
- Housing Authority Attn: Ivan Pace
- Perit
- Perit Thomas Tanti
- Application type
- Full development permission
- Zone
- Within Development Zone
- Type of works
- New Construction
- Received
- 8 August 2025
- Validated
- 28 January 2026
- Decision
- Acceptable
- Permit expires
- 11 February 2031
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around Block G, Triq Jean Houel, Ta Giorni, San Giljan
3 other applications on the same street: 2 granted, 0 refused, 1 pending.
On Triq Jean Houel: 3 other applications, 2 granted and 0 refused. Periti active on this street: Thomas Tanti.
Approval estimate for new construction applications like this here: about 94% (likely range 64–100%, low reliability, from 2 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/05039/26 St Julians: Sanctioning of existing apertures.
- PA/05906/25 St Julians: To construct elevator within stairwell and construct new ramp at Ground floor level.
- PA/05605/25 St Julians: To construct elevator within stairwell.
More by Thomas Tanti
- PA/07538/26 Birzebbuga: To excavate and construct an underground reservoir, construct an overlying sheep farm with ancillary facilities and a manure clamp. To sanction parts of an…
- PA/06801/26 Rabat: To excavate existing vacant site and proposed construction of 3 private car garages at basement level, 1 maisonette at ground floor level, 3 apartments at…
- PA/06596/26 Marsaskala: To demolish and reconstruct a dilapidated part of the facade. To replace lintels and apertures.
- PA/06332/26 Ghaxaq: To propose a basement underneath the agriculture store.
- PA/06155/26 Munxar: To sanction internal layout from approved PA/6541/97.
- PA/05907/26 Pieta: Proposed extension to the recessed floor level as approved in PA/3104/17, for the creation of a new one-bedroom dwelling.
All applications by Thomas Tanti
More from Housing Authority
- PA/06222/26 San Gwann: Proposed accessible ramp to provide access to the common parts of the existing block.
- PA/05436/26 Zurrieq: Changes to development approved in PA4752/25, to replace the approved platform elevator with a wheelchair-accessible pathway.
- PA/01419/26 St Julians: Construction of a lift shaft and formation of an external ramp at an existing government block.
- PA/01163/26 San Gwann: To construct elevator within stairwell.
- PA/01147/26 Zejtun: Construction of lift shaft and alterations to facade.
- PA/00460/26 Paola: To convert planter within front garden into a series of ramps.