---
title: "PA/05610/25: extend the site area approved in PA in Qala | PropertyList"
url: https://propertylist.mt/permit/PA-05610-25/qala-extend-the-site-area-approved-in-pa
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-02
---

> Granted planning application in Qala: To extend the site area approved in PA 7982/24 by demolishing an existing dwelling, to excavate this part of site…

Planning applications › Qala › PA0561025

# PA/05610/25: extend the site area approved in PA in Qala

Ta' Tina & Vacant Plot, Triq ta' Cini, Qala

To extend the site area approved in PA 7982/24 by demolishing an existing dwelling, to excavate this part of site (under the dwelling) and to construct the following: A substation and garages for private cars at basement level; three maisonettes and garages for private cars at ground floor level; five flats at first floor level; four flats and lower part of duplex at second floor level; four two bedroom flats and upper part of duplex at setback floor level and proposed pools."

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** Ta' Tina & Vacant Plot, Triq ta' Cini, Qala
- **Locality:** [Qala](https://propertylist.mt/planning-applications/qala)
- **Applicant:** [Julian Cefai](https://propertylist.mt/applicant/julian-cefai)
- **Perit:** [Vella + Grech Periti](https://propertylist.mt/perit/vella-grech-periti)
- **Application type:** Full development permission
- **Zone:** Within Development Zone
- **Type of works:** Demolition & New Construction (Residential)
- **Height:** 3 floors plus a receded floor
- **Received:** 30 July 2025
- **Validated:** 3 September 2025
- **Decision:** Grant Permission
- **Decision date:** 18 November 2025
- **Permit expires:** 10 December 2030

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/05610/25)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=05610&caseYear=25)

## Planning activity around Ta' Tina & Vacant Plot, Triq ta' Cini, Qala

16 other applications within 300 m: 8 granted, 0 refused, 2 pending. 100% of decided applications nearby were granted. Tallest granted nearby: 3 floors (PA/07935/24).

On Triq ta' Cini: 10 other applications, 6 granted and 0 refused; granted buildings are typically 3 floors, the tallest 3. Periti active on this street: [Ramona Cassar](https://propertylist.mt/perit/ramona-cassar), [Vella + Grech Periti](https://propertylist.mt/perit/vella-grech-periti), [Alexander Bigeni](https://propertylist.mt/perit/alexander-bigeni).

Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 2 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/00787/20** Qala](https://propertylist.mt/permit/PA-00787-20/qala-construct-residential-dwelling): To construct residential dwelling, reservoir and stairwell at roof level. Status being checked, 20 m away
- [**PA/07692/24** Qala](https://propertylist.mt/permit/PA-07692-24/qala-alterations-to-a-pre-1968-dwelling-including-the): Proposed alterations to a pre-1968 dwelling including the creation of new openings, roofing over the open staircase and an extension along the side and at… Granted, validated 13 November 2024, 26 m away
- [**PA/06519/26** Qala](https://propertylist.mt/permit/PA-06519-26/qala-raising-of-lift-shaft-to-third-floor): Proposed raising of lift shaft to third floor level. Pending, 44 m away
- [**PA/00275/26** Qala](https://propertylist.mt/permit/PA-00275-26/qala-demolish-a-small-low-structure): To demolish a small low structure; excavate and construct an underground reservoir and construct a ground floor garage with overlying dwelling. Granted, validated 21 January 2026, 2 floors, 48 m away
- [**PA/00041/21** Qala](https://propertylist.mt/permit/PA-00041-21/qala-demolish-existing-structure-and-to-construct-2): To demolish existing structure and to construct 2 apartments and domestic stores at roof level with underlying garages. Status being checked, 54 m away
- [**PA/00030/24** Qala](https://propertylist.mt/permit/PA-00030-24/qala-partial-demolition-of-the-existing-structure-and): Proposed partial demolition of the existing structure and the partial implementation of demolition works, alterations and enhancements to the residences as… Granted, validated 17 January 2024, 55 m away
- [**PA/07935/24** Qala](https://propertylist.mt/permit/PA-07935-24/qala-dismantle-existing-rubble-wall): To dismantle existing rubble wall, clear site and construct a basement level; ground floor domestic store and overlying dwelling spread over 2 floors. Granted, validated 20 November 2024, 3 floors, 56 m away
- [**PA/01541/25** Qala](https://propertylist.mt/permit/PA-01541-25/qala-demolish-existing-structures): To demolish existing structures, to excavate and to construct 8 residential units with underlying garages. Granted, validated 12 March 2025, 74 m away
- [**PA/07982/24** Qala](https://propertylist.mt/permit/PA-07982-24/qala-excavate-site-and-proposed-garages-for-private): To excavate site and proposed garages for private cars and Class 4B shop at ground floor level; two flats at first floor; two flats at second floor and two… Granted, validated 27 November 2024, 3 floors plus a receded floor, 114 m away
- [**PA/06111/26** Qala](https://propertylist.mt/permit/PA-06111-26/qala-demolish-an-existing-townhouse): To demolish an existing townhouse, excavate and construct a reservoir and a basement below street level and a 30-room Class 3A guesthouse from ground to third… Pending, validated 9 September 2026, 4 floors plus a receded floor, 121 m away
- [**PA/03168/24** Qala](https://propertylist.mt/permit/PA-03168-24/qala-excavation-and-construction-of-two-terraced-houses): Proposed excavation and construction of two terraced houses as per policy P6 ’Transition solutions between DZ edge and ODZ'. Withdrawn, validated 29 May 2024, 228 m away
- [**PA/00681/20** Qala](https://propertylist.mt/permit/PA-00681-20/qala-sanction-agricultural-soil-deposited-on-field): To sanction agricultural soil deposited on field. Status being checked, 270 m away
- [**PA/02004/21** Qala](https://propertylist.mt/permit/PA-02004-21/qala-sanction-surfacing-of-site-with-sand-like): To sanction surfacing of site with sand like concrete, to construct franka stone walls and to remove existing wide gate and install three new narrow front… Status being checked, 272 m away
- [**PA/00370/21** Qala](https://propertylist.mt/permit/PA-00370-21/qala-addition-of-basement-below-development-approved-in): Addition of basement below development approved in PA/5310/19 Status being checked, 277 m away
- [**PA/06978/24** Qala](https://propertylist.mt/permit/PA-06978-24/qala-remove-car-lift-approved-in-pa-00370-21-and): To remove car lift approved in PA/00370/21 and to carry out other alterations to layout. Granted, validated 20 November 2024, 287 m away

## More by Vella + Grech Periti

- [**PA/07745/26** Fontana](https://propertylist.mt/permit/PA-07745-26/fontana-excavation-of-site): Proposed excavation of site, garage at basement level; maisonette at ground floor; two flats at first and second floors and receded flat at setback floor… Pending, 3 floors plus a receded floor
- [**PA/07737/26** Xaghra](https://propertylist.mt/permit/PA-07737-26/xaghra-washroom-and-domestic-store-at-roof-level): Proposed washroom and domestic store at roof level to development approved in PA5486/25. Pending
- [**PA/07689/26** Ghajnsielem](https://propertylist.mt/permit/PA-07689-26/ghajnsielem-add-class-6a-at-ground-floor-level): To add Class 6A at ground floor level only, to existing development approved in PA4237/25. Pending, 1 floor
- [**PA/07684/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-07684-26/zebbug-gozo-changes-to-existing-facade-at-ground): Changes to existing facade at ground, first and second floor levels; internal alterations in common area and additional floors at third, fourth, fifth and… Pending, 6 floors plus a receded floor
- [**PA/07676/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-07676-26/zebbug-gozo-extension-to-pre-1968-dwelling-house-consisting-of): Proposed extension to pre-1968 dwelling house consisting of construction of second floor and washroom. Pending, 3 floors
- [**PA/07661/26** Ghajnsielem](https://propertylist.mt/permit/PA-07661-26/ghajnsielem-extension-to-pre-1968-dwelling): Proposed extension to pre-1968 dwelling, consisting of erection of room at first floor and external stairs. Pending, 2 floors

[All applications by Vella + Grech Periti](https://propertylist.mt/perit/vella-grech-periti)

## More from Julian Cefai

- [**PA/07245/26** Kercem](https://propertylist.mt/permit/PA-07245-26/kercem-demolish-existing-building): To demolish existing building, propose excavation and construction of reservoir, 9 garages at basement level, office Class 4A, signage, residential units at… Pending, validated 21 October 2026, 3 floors plus a receded floor
- [**PA/01400/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-01400-26/zebbug-gozo-excavation-of-basement-and-reservoirs-and-to): Excavation of basement and reservoirs and to construct two houses on two floors plus roof structures with pools incorporating existing rooms on site on which… Granted, validated 25 March 2026, 2 floors
- [**PA/07069/25** Rabat (Gozo)](https://propertylist.mt/permit/PA-07069-25/rabat-gozo-demolition-and-excavation-of-reservoir): Proposed demolition and excavation of reservoir. Proposed construction of street level garage, Class 4A office, 3 apartments and 1 apartment at receded level… Granted, validated 29 October 2025, 4 floors plus a receded floor
- [**PA/06514/25** Rabat (Gozo)](https://propertylist.mt/permit/PA-06514-25/rabat-gozo-internal-and-external-alterations-to-pre-68-building): Proposed internal and external alterations to pre-68 building, that includes subdivision of existing property into two residential units. Pending, validated 15 October 2025
- [**PA/05391/25** Xewkija](https://propertylist.mt/permit/PA-05391-25/xewkija-excavation-of-reservoirs): Proposed excavation of reservoirs, retention of pre-1968 structure and construction of two houses with pool. Granted, validated 27 August 2025
- [**PA/03695/25** Hamrun](https://propertylist.mt/permit/PA-03695-25/hamrun-demolish-existing-dwelling): To demolish existing dwelling, carry out excavation works, and construct a ground floor garage and four overlying apartments. The access to the proposed… Granted, validated 8 October 2025, 1 floor

[All planning applications in Qala](https://propertylist.mt/planning-applications/qala)
