propertylist

PA/05955/26: raising of the bathroom ceiling at ground in Zejtun

53 / 55, Triq Santu Wistin, Zejtun

Proposed raising of the bathroom ceiling at ground floor level to allow the interconnection of the rear projection with the area above the existing bathroom ceiling; construction of a bathroom at first floor level; and minor alterations to the second-floor façade from that approved under PA/3013/24, consisting of the relocation of the door and window serving the front rooms.

Status
Pending (Awaiting Recommendation)
Location
53 / 55, Triq Santu Wistin, Zejtun
Locality
Zejtun
Applicant
Christian Bonnici
Perit
Perit Henry Attard
Application type
Full development permission
Zone
Within Development Zone
Type of works
New Construction
Received
6 July 2026
Validated
2 September 2026
Published
2 September 2026
Comments close
2 October 2026

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around 53 / 55, Triq Santu Wistin, Zejtun

198 other applications within 300 m: 128 granted, 3 refused, 12 pending. 98% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/00582/24).

On Triq Santu Wistin: 12 other applications, 7 granted and 0 refused; granted buildings are typically 3 floors, the tallest 3. Periti active on this street: Jason Zammit.

Approval estimate for new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 12 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.