PA/06043/25: internal and external alterations in Zejtun

106, Triq Santa Marija c/w, Triq il-Madonna tal-Hniena, Zejtun

Proposed internal and external alterations, including the demolition of the dilapidated ceiling slabs at ground floor and intermediate floor; demolition of internal wall at ground floor level, and external wall (overlooking roof terrace); construction of the first floor level and overlying washroom; construction of slab over ground floor level; construction of an internal staircase up to roof level; opening of proposed apertures along the facades; and restoration of facades.

Status
Granted (This application has been approved by Planning Board / Commission.)
Location
106, Triq Santa Marija c/w, Triq il-Madonna tal-Hniena, Zejtun
Locality
Zejtun
Applicant
Brandon Galea
Perit
Perit Claire Cauchi
Application type
Full development permission
Zone
Within Development Zone
Type of works
Demolition & New Construction
Height
2 floors
Residential units
1
Received
29 August 2025
Validated
17 September 2025
Published
17 September 2025
Comments close
17 October 2025
Recommendation
Grant Permission
Decision
Grant Permission
Decision date
23 April 2026
Permit expires
6 May 2031

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around 106, Triq Santa Marija c/w, Triq il-Madonna tal-Hniena, Zejtun

187 other applications within 300 m: 123 granted, 1 refused, 11 pending. 99% of decided applications nearby were granted. Tallest granted nearby: 4 floors (PA/00309/23).

On Triq Santa Marija: 21 other applications, 15 granted and 0 refused; granted buildings are typically 3 floors, the tallest 3. Periti active on this street: Jason Zammit, Jesmond Mugliett, Joseph Saliba, Andre Mallia, Melanie Spiteri.

Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 14 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Claire Cauchi

All applications by Claire Cauchi

All planning applications in Zejtun