PA/06098/26: introduction of ramp to render building accessible in Zabbar
Level 2, Rosewall Building, Triq Villabate, Zabbar
Proposed introduction of ramp to render building accessible following CRPD/TORB request.
- Status
- Pending (Awaiting Recommendation)
- Location
- Level 2, Rosewall Building, Triq Villabate, Zabbar
- Locality
- Zabbar
- Applicant
- Wallace Falzon
- Perit
- JG Periti
- Application type
- Full development permission
- Zone
- Within Development Zone
- Type of works
- New Construction
- Received
- 18 August 2026
- Validated
- 2 September 2026
- Published
- 2 September 2026
- Comments close
- 2 October 2026
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around Level 2, Rosewall Building, Triq Villabate, Zabbar
36 other applications within 300 m: 17 granted, 2 refused, 7 pending. 89% of decided applications nearby were granted. Tallest granted nearby: 4 floors (PA/04372/24).
On Triq Villabate: 33 other applications, 16 granted and 2 refused; granted buildings are typically 3 floors, the tallest 4. Periti active on this street: Randolph Nicholas Bartoli, Charles Buhagiar, Patrick Refalo, Adriana Zammit, Dario Mangion.
Approval estimate for new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 2 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/03702/23 Zabbar: Proposed construction of water reservoir and rubble walls, installation of a windmill, sanctioning of rubble walls and soil deposition.
- PA/04635/25 Zabbar: To construct gated access, constructed an underground reservoir and pump room, to construct perimeter rubble walls.
- PA/07008/25 Zabbar: To propose a static 6 m x 3 m billboard.
- PA/03734/26 Zabbar: Proposed four stables including ancillary facilities, including planting of trees, boundary wall, and gate.
- PA/03295/26 Zabbar: To demolish and re-construct pre-1968 agricultural store on same footprint. Proposed roofing of an existing pre-1994 reservoir and construction of a research…
- PA/06922/25 Zabbar: To propose double sided 6 x 3 m canvas billboard with external lighting.
- PA/07546/26 Zabbar: Proposed change of internal uses and layout to farmhouse from that approved in permission PA4564/22, and proposed construction of ancillary garage for private…
- PA/01602/21 Zabbar: Changes in layout to agricultural store approved in PA/3711/19 which include extension to the store, basement and construction of demountable timber structure.
- PA/03725/26 Zabbar: Proposed construction of an agricultural store, pump room and underlying reservoir. Proposal includes the demolition and reconstruction of the front walls,…
- PA/04374/25 Zabbar: Proposed installation of external Illuminated billboard - static billboard with external lighting.
- PA/03277/22 Zabbar: To sanction slight shifting in layout, increase in internal height and changes to openings on facade of agricultural stores approved in PA7554/16.
- PA/02067/22 Zabbar: To sanction existing reservoir. To propose the construction of a greenhouse and roofing over existing reservoir.
- PA/04290/25 Zabbar: Change of use from disturbed land to boatyard (Class 6B), including sanctioning of gate, boundary walls and other additions and alterations.
- PA/04170/26 Zabbar: Proposed installation of billboard (solar powered external illumination).
- PA/02648/22 Zabbar: Internal alterations to an existing terraced house, including removal of wall at ground floor level to accommodate a larger street level garage, construction…
More by JG Periti
- PA/07460/26 San Pawl il-Bahar: Renewal of PA/977/14- Demolition of existing bank and erect same including basement parking and contingency building.
- PA/07376/26 Rabat: Proposed partial excavation of site, while retaining and preserving the rest of the site due to the presence of high value archeological features, and…
- PA/07328/26 San Pawl il-Bahar: Proposed construction of pump chamber.
- PA/07217/26 Swieqi: Relocation of public service garage space, addition of pool at roof level, reconfiguration of reservoirs and other changes.
- PA/06980/26 Tarxien: Proposed demolition of existing dwellings, removal of material, excavation, and construction of 6 basement garages, 2 maisonettes, 6 apartments and 1 penthouse.
- PA/06947/26 Iklin: Sanctioning of clearance of site and excavation. Proposed open storage and construction of 2 floors of warehousing Class 6A at lower basement, basement and…
More from Wallace Falzon
- PA/06450/25 Cospicua (Bormla): Internal alterations to existing pre-1967 unit; to construct new unit at second and third floor level.
- PA/03124/24 Swieqi: To subdivide the existing detached villa as approved in PA/01164/98 into two separate units - works shall include the required alterations, extension, new…