> Granted planning application in Rabat (Gozo): Proposed change of use of part of garage to include one public service car space. Perit Vella + Grech Periti.…

Planning applications › Rabat (Gozo) › PA0612024

# PA/06120/24: change of use of part of garage in Rabat (Gozo)

Garage at Carpe Diem, Triq it-Tlieta U Ghoxrin T'April, Rabat (Gozo)

Proposed change of use of part of garage to include one public service car space.

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** Garage at Carpe Diem, Triq it-Tlieta U Ghoxrin T'April, Rabat (Gozo)
- **Locality:** [Rabat (Gozo)](https://propertylist.mt/planning-applications/rabat-gozo)
- **Applicant:** David Said
- **Perit:** [Vella + Grech Periti](https://propertylist.mt/perit/vella-grech-periti)
- **Application type:** Full development permission
- **Zone:** Within Development Zone
- **Type of works:** Change of Use
- **Received:** 21 August 2024
- **Validated:** 18 September 2024
- **Published:** 18 September 2024
- **Comments close:** 18 October 2024
- **Recommendation:** Grant Permission
- **Decision:** Grant Permission
- **Decision date:** 2 April 2025
- **Permit expires:** 16 April 2030

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/06120/24)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=06120&caseYear=24)

## Planning activity around Garage at Carpe Diem, Triq it-Tlieta U Ghoxrin T'April, Rabat (Gozo)

104 other applications within 300 m: 72 granted, 1 refused, 8 pending. 99% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/05418/24).

On Triq it-Tlieta U Ghoxrin T'April: 3 other applications, 2 granted and 0 refused.

Approval estimate for change of use applications like this here: about 95% (likely range 65–100%, low reliability, from 6 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/01051/22** Rabat (Gozo)](https://propertylist.mt/permit/PA-01051-22/rabat-gozo-additions-and-alterations-consisting-of-extension-of): Proposed additions and alterations consisting of extension of terrace at the back, stairs to roof and raising of parapet wall at roof level to development… Status being checked, 32 m away
- [**PA/01566/21** Rabat (Gozo)](https://propertylist.mt/permit/PA-01566-21/rabat-gozo-door-opening-to-ground-floor-maisonette): Proposed door opening to ground floor maisonette Status being checked, 35 m away
- [**PA/08200/25** Rabat (Gozo)](https://propertylist.mt/permit/PA-08200-25/rabat-gozo-slight-shifting-of-entrance-stairs-and-sanctioning): Proposed slight shifting of entrance stairs and sanctioning of some internal differences from RG999/16 & PA/06120/24 Granted, validated 16 January 2026, 40 m away
- [**PA/02396/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-02396-24/rabat-gozo-excavation-within-vacant-site-and-construction-of): Excavation within vacant site and construction of apartment block consisting of basement garage, 1 maisonette, 3 apartments and 1 penthouse. Granted, validated 24 April 2024, 59 m away
- [**PA/04933/25** Rabat (Gozo)](https://propertylist.mt/permit/PA-04933-25/rabat-gozo-sanction-property-as-built-in-lieu-of): To sanction property as built in lieu of PA/02507/94 and to propose change of use from garage to Class 4B (retail outlet). Granted, validated 30 July 2025, 91 m away
- [**PA/00650/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-00650-26/rabat-gozo-construct-eleven-residential-units-with-underlying-garages): To construct eleven residential units with underlying garages at basement level. The proposal includes excavation of the basement level and construction of… Granted, validated 4 February 2026, 1 floor, 93 m away
- [**PA/00682/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-00682-24/rabat-gozo-change-of-use-of-part-of-garage): Change of use of part of garage for parking of heavy goods vehicles to Class 6A storage and distribution. Withdrawn, validated 7 February 2024, 94 m away
- [**PA/03167/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-03167-23/rabat-gozo-renewal-of-pa3234-15-to-renew-pa6920-06): Renewal of PA3234/15 - To renew PA6920/06: To sanction variations from previous permission, and to construct additional apartments and penthouse Granted, validated 18 August 2023, 100 m away
- [**PA/07639/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-07639-24/rabat-gozo-demolition-of-existing-dwelling-and-reconstruction-of): Proposed demolition of existing dwelling and reconstruction of a single dwelling and an underlying private car garage, design of elevation following that of… Granted, validated 16 April 2025, 1 floor, 109 m away
- [**PA/03439/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-03439-23/rabat-gozo-additions-and-alterations-to-penthouse-approved-in): Proposed additions and alterations to penthouse approved in PA3577/05. Granted, validated 4 August 2023, 116 m away
- [**PA/06756/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-06756-23/rabat-gozo-carry-out-alterations-to-apartments-approved-in): To carry out alterations to apartments approved in PA/04267/22. Alterations include changes to layout and facade. To also convert part of an apartment to a… Refused, validated 15 November 2023, 122 m away
- [**PA/01233/20** Rabat (Gozo)](https://propertylist.mt/permit/PA-01233-20/rabat-gozo-sanction-changes-from-previous-permit-pa-04998-08): To sanction changes from previous permit PA/04998/08, namely minor internal alterations and swimming pool at back, and to construct third and setback floor… Status being checked, 4 floors plus a receded floor, 128 m away
- [**PA/04700/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-04700-23/rabat-gozo-renewal-to-permission-pa4907-18-renewal-to-permission): Renewal to permission PA4907/18:- Renewal to permission PA1006/13:- Construction of maisonette at ground floor, two apartments, penthouse and underlying… Granted, validated 1 November 2023, 3 floors plus a receded floor, 129 m away
- [**PA/01948/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-01948-26/rabat-gozo-install-wrought-iron-railing-and-replace-existing): To install wrought iron railing and replace existing garage door with pvc as per PA4133/24 replacement of deteriorated roof at first floor level and minor… Granted, validated 12 May 2026, 131 m away
- [**PA/04133/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-04133-24/rabat-gozo-replacement-of-upper-floor-timber-apertures-approved): Proposed replacement of upper floor timber apertures approved in RG2893/19 to double glazed pvc apertures, no structural changes will take place. Granted, validated 26 August 2024, 131 m away

## More by Vella + Grech Periti

- [**PA/07745/26** Fontana](https://propertylist.mt/permit/PA-07745-26/fontana-excavation-of-site): Proposed excavation of site, garage at basement level; maisonette at ground floor; two flats at first and second floors and receded flat at setback floor… Pending, 3 floors plus a receded floor
- [**PA/07737/26** Xaghra](https://propertylist.mt/permit/PA-07737-26/xaghra-washroom-and-domestic-store-at-roof-level): Proposed washroom and domestic store at roof level to development approved in PA5486/25. Pending
- [**PA/07689/26** Ghajnsielem](https://propertylist.mt/permit/PA-07689-26/ghajnsielem-add-class-6a-at-ground-floor-level): To add Class 6A at ground floor level only, to existing development approved in PA4237/25. Pending, 1 floor
- [**PA/07684/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-07684-26/zebbug-gozo-changes-to-existing-facade-at-ground): Changes to existing facade at ground, first and second floor levels; internal alterations in common area and additional floors at third, fourth, fifth and… Pending, 6 floors plus a receded floor
- [**PA/07676/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-07676-26/zebbug-gozo-extension-to-pre-1968-dwelling-house-consisting-of): Proposed extension to pre-1968 dwelling house consisting of construction of second floor and washroom. Pending, 3 floors
- [**PA/07661/26** Ghajnsielem](https://propertylist.mt/permit/PA-07661-26/ghajnsielem-extension-to-pre-1968-dwelling): Proposed extension to pre-1968 dwelling, consisting of erection of room at first floor and external stairs. Pending, 2 floors

[All applications by Vella + Grech Periti](https://propertylist.mt/perit/vella-grech-periti)

[All planning applications in Rabat (Gozo)](https://propertylist.mt/planning-applications/rabat-gozo)