PA/06180/23: Construction of a substation within the school in Rabat
St. Nicholas College, Rabat Primary B, Triq Kan. G. Gatt Said c/w, Triq Rudolph Saliba, Rabat
Construction of a substation within the school boundary.
- Status
- Granted (This application has been approved by Planning Board / Commission.)
- Location
- St. Nicholas College, Rabat Primary B, Triq Kan. G. Gatt Said c/w, Triq Rudolph Saliba, Rabat
- Locality
- Rabat
- Applicant
- Foundation for tomorrows schools Attn: Neville Young
- Perit
- Perit Lisa Bonello
- Application type
- Full development permission - Summary Process
- Zone
- Within Development Zone
- Type of works
- Educational
- Received
- 8 June 2023
- Validated
- 10 January 2024
- Published
- 25 October 2023
- Comments close
- 9 November 2023
- Decision
- Acceptable
- Permit expires
- 24 January 2029
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around St. Nicholas College, Rabat Primary B, Triq Kan. G. Gatt Said c/w, Triq Rudolph Saliba, Rabat
5 other applications on the same street: 3 granted, 1 refused, 0 pending. 75% of decided applications nearby were granted. Tallest granted nearby: 2 floors (PA/04309/25).
On Triq Kan. G. Gatt Said: 5 other applications, 3 granted and 1 refused; granted buildings are typically 2 floors, the tallest 2.
- PA/04309/25 Rabat: Proposed demolition of elevated ground and first floor terraced house, proposed extension to existing garage and proposed construction of four residential…
- PA/04204/24 Rabat: To sanction minor internal differences from approved in PA5390/18 this includes sanctioning at subdivision of penthouse into 2 separate units.
- PA/02712/23 Rabat: To sanction as built from original permit. Sanctioning includes internal alterations, closure of facade balcony and construction of washroom. Works include…
- PA/03686/23 Rabat: Construction of 2 apartments and underlying garage at ground floor in line with approved outline permit PA2643/05, (interconnected with existing garage). This…
- PA/00725/21 Rabat: To remove existing backfilling to form a ramp from ground floor to basement level instead of car lift approved in PA 6601/16.
More by Lisa Bonello
- PA/06394/24 Marsaskala: Proposed fixed canopy for the school main entrance and proposed retractable canopy for the school yard.
- PA/06393/24 Marsaskala: Proposed canopy at existing school, construction of ramp and staircase and installation of platform lift.
- PA/02059/23 Rabat: Construction of a substation.
All applications by Lisa Bonello
More from Foundation for tomorrows schools
- PA/06394/24 Marsaskala: Proposed fixed canopy for the school main entrance and proposed retractable canopy for the school yard.
- PA/06393/24 Marsaskala: Proposed canopy at existing school, construction of ramp and staircase and installation of platform lift.
- PA/03090/24 Mosta: Construction of new Mosta secondary school opposite the existing Maria Regina College, Zokrija school; including educational, recreational, sports &…
- PA/01327/24 Pembroke: Removal of existing soft landscaping and proposed construction of sports facilities, changing rooms and substation at National Sports School, Pembroke.
- PA/00317/24 Naxxar: Proposed redesign of Naxxar Primary School as approved by PA10373/17, consisting of full demolition of internal building envelope, excavation of site for…
- PA/07127/23 Pembroke: Project comprises of the sanctioning of building from permit PA/01695/00, together with a proposed extension to the existing San Miguel Resource centre in…