PA/06341/26: project involves the demolition of the existing in San Pawl il-Bahar

60, 62, 64, Triq il-Parrocca, San Pawl il-Bahar

The project involves the demolition of the existing structure, excavation of one basement level, and construction of a Class 3B hotel. The proposal includes hotel amenities at basement level -1, the ground floor (level 0) will feature a reception area, a lounge and a staff room. Fifty-nine rooms will be located from the ground floor to level eight.

Status
Pending (Awaiting Recommendation)
Location
60, 62, 64, Triq il-Parrocca, San Pawl il-Bahar
Locality
San Pawl il-Bahar
Applicant
Nichol Chetcuti
Perit
Perit Adam Pace
Application type
Full development permission
Zone
Within Development Zone
Type of works
Demolition & New Construction
Height
9 floors
Residential units
59
Received
29 May 2026
Validated
16 September 2026
Published
16 September 2026
Comments close
16 October 2026

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around 60, 62, 64, Triq il-Parrocca, San Pawl il-Bahar

95 other applications within 300 m: 61 granted, 3 refused, 13 pending. 95% of decided applications nearby were granted. Tallest granted nearby: 7 floors (PA/05908/25).

On Triq il-Parrocca: 3 other applications, 3 granted and 0 refused; granted buildings are typically 6 floors, the tallest 6.

Approval estimate for demolition & new construction applications like this here: about 78% (likely range 48–100%, low reliability, from 12 comparable decisions nearby). It proposes 9 floors; the tallest granted nearby is 7. Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Adam Pace

All applications by Adam Pace

More from Nichol Chetcuti

All planning applications in San Pawl il-Bahar