propertylist

PA/06378/24: demolish existing roof structure in Rabat

95, Triq Mons. G. Depiro, Rabat

To demolish existing roof structure, carry out alterations at levels 1 and 2, erect additional flat at level 3 and a receded floor at level 4 and lift (separate from third party).

Status
Granted (This application has been approved by Planning Board / Commission.)
Location
95, Triq Mons. G. Depiro, Rabat
Locality
Rabat
Applicant
Abdulhamid Abdulattef
Perit
Perit Anthony Fenech Vella
Application type
Full development permission
Zone
Within Development Zone
Type of works
Demolition & New Construction (Residential)
Height
4 floors plus a receded floor
Received
2 August 2024
Validated
25 September 2024
Published
25 September 2024
Comments close
25 October 2024
Recommendation
Refuse Permission
Decision
Grant Permission
Decision date
14 May 2025
Permit expires
25 June 2030

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around 95, Triq Mons. G. Depiro, Rabat

10 other applications on the same street: 7 granted, 0 refused, 1 pending. 100% of decided applications nearby were granted. Tallest granted nearby: 4 floors (PA/04296/24).

On Triq Mons. G. Depiro: 10 other applications, 7 granted and 0 refused; granted buildings are typically 4 floors, the tallest 4. Periti active on this street: Benny Cortis.

Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 1 comparable decision nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Anthony Fenech Vella

All applications by Anthony Fenech Vella

All planning applications in Rabat