> Granted planning application in Rabat (Gozo): To excavate a vacant plot and construct a basement garage and an overlying terraced house. Perit Ramona…

Planning applications › Rabat (Gozo) › PA0645324

# PA/06453/24: excavate a vacant plot and construct a in Rabat (Gozo)

Dar Triesti, Triq Gorg Tabone, Rabat (Gozo)

To excavate a vacant plot and construct a basement garage and an overlying terraced house.

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** Dar Triesti, Triq Gorg Tabone, Rabat (Gozo)
- **Locality:** [Rabat (Gozo)](https://propertylist.mt/planning-applications/rabat-gozo)
- **Applicant:** [Manuel Farrugia](https://propertylist.mt/applicant/manuel-farrugia)
- **Perit:** [Perit Ramona Cassar](https://propertylist.mt/perit/ramona-cassar)
- **Application type:** Full development permission - Summary Process
- **Zone:** Outside Development Zone
- **Type of works:** New Construction (Residential)
- **Residential units:** 1
- **Received:** 22 May 2024
- **Validated:** 23 January 2025
- **Published:** 25 September 2024
- **Comments close:** 10 October 2024
- **Decision:** Acceptable
- **Permit expires:** 5 February 2030

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/06453/24)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=06453&caseYear=24)

## Planning activity around Dar Triesti, Triq Gorg Tabone, Rabat (Gozo)

81 other applications within 300 m: 51 granted, 1 refused, 11 pending. 98% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/06279/25).

On Triq Gorg Tabone: 2 other applications, 1 granted and 0 refused; granted buildings are typically 5 floors, the tallest 5.

Approval estimate for new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 6 comparable decisions nearby). Outside the development zone, where approvals are harder. Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/06719/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-06719-26/rabat-gozo-excavate-remainder-of-site-and-construct-garages): To excavate remainder of site and construct garages at basement level and overlying 6 residential units. Pending, 1 floor, 28 m away
- [**PA/03116/21** Rabat (Gozo)](https://propertylist.mt/permit/PA-03116-21/rabat-gozo-erect-dwelling-with-underlying-private-garage): To erect dwelling with underlying private garage. Status being checked, 36 m away
- [**PA/06279/25** Rabat (Gozo)](https://propertylist.mt/permit/PA-06279-25/rabat-gozo-excavation-of-site-and-construction-to-create): Proposed excavation of site and construction to create an underground garage and an overlying Class 3A guesthouse spread over a total of 5 floors. Granted, validated 1 October 2025, 5 floors, 38 m away
- [**PA/01923/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-01923-23/rabat-gozo-demolish-existing-terraced-house): To demolish existing terraced house, to excavate and to construct 10 residential units with underlying garages. Granted, validated 17 July 2023, 41 m away
- [**PA/05553/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-05553-26/rabat-gozo-carry-out-changes-to-residential-units-approved): To carry out changes to residential units approved in PA/01923/23 which have not been built yet. Changes include different layouts and facades which in total… Granted, validated 28 September 2026, 42 m away
- [**PA/00797/20** Rabat (Gozo)](https://propertylist.mt/permit/PA-00797-20/rabat-gozo-construct-a-maisonette-on-existing-airspace): To construct a maisonette on existing airspace Status being checked, 45 m away
- [**PA/03020/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-03020-23/rabat-gozo-parapet-wall-and-spiral-staircase): Proposed parapet wall and spiral staircase. Granted, validated 31 May 2023, 47 m away
- [**PA/02798/22** Rabat (Gozo)](https://propertylist.mt/permit/PA-02798-22/rabat-gozo-propose-internal-additions-and-alterations-at-all): To propose internal additions and alterations at all levels to existing dwelling approved in RG1073/20, mainly to convert sitting room into garage for private… Status being checked, 57 m away
- [**PA/06533/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-06533-26/rabat-gozo-excavate-plot-and-construct-a-dwelling-on): To excavate plot and construct a dwelling on four floors and a pool. Pending, validated 23 September 2026, 4 floors, 64 m away
- [**PA/07801/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-07801-23/rabat-gozo-excavate-under-part-of-ground-floor-and): To excavate under part of ground floor and alterations in facade to create an underlying garage for private cars. Granted, validated 10 April 2024, 90 m away
- [**PA/03225/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-03225-23/rabat-gozo-demolish-an-existing-dwelling-house-and-construct): To demolish an existing dwelling house and construct a basement garage, an apartment at ground floor level and a duplex apartment at first and roof level. Granted, validated 6 June 2023, 2 floors plus a receded floor, 104 m away
- [**PA/02968/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-02968-23/rabat-gozo-renew-pa-899-18-to-renew-pa3005-12): To renew PA 899/18 - To renew PA3005/12 and PA6093/07 - Proposed additions and alterations. Granted, validated 20 June 2023, 107 m away
- [**PA/04937/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-04937-24/rabat-gozo-minor-alterations-and-extension-at-3rd-floor): Minor alterations and extension at 3rd floor to showroom approved in PA/9845/18. Granted, validated 28 August 2024, 133 m away
- [**PA/07097/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-07097-26/rabat-gozo-construct-a-pump-room-and-underground-water): To construct a pump room and underground water reservoir. Pending, validated 14 October 2026, 134 m away
- [**PA/07063/25** Rabat (Gozo)](https://propertylist.mt/permit/PA-07063-25/rabat-gozo-demolish-existing-building): To demolish existing building; excavation of site and proposed lower basement; upper basement garage for private cars, accessible from adjacent development in… Granted, validated 29 October 2025, 4 floors plus a receded floor, 135 m away

## More by Ramona Cassar

- [**PA/07756/26** Xewkija](https://propertylist.mt/permit/PA-07756-26/xewkija-extend-a-house-approved-by-pa-03538-20-by): To extend a house approved by PA/03538/20 by extending sideways and backwards at first floor level and construct a structure at second floor. Also minor… Pending, 2 floors
- [**PA/07471/26** Xaghra](https://propertylist.mt/permit/PA-07471-26/xaghra-restore-the-ceiling-slab-of-an-internal): To restore the ceiling slab of an internal room. Pending, validated 28 October 2026
- [**PA/07448/26** Fontana](https://propertylist.mt/permit/PA-07448-26/fontana-sanction-soil-deposit-to-restore-original-level): To sanction soil deposit to restore original level in an agricultural land. Also to sanction retaining wall to avoid soil erosion and proposed rubble wall… Pending, validated 28 October 2026
- [**PA/07352/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-07352-26/rabat-gozo-construction-of-a-room-and-jacuzzi-at): Proposed construction of a room and jacuzzi at second floor level. Also proposed dismantling of internal balcony floor to allow more light into the basement… Pending, validated 28 October 2026
- [**PA/07322/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-07322-26/rabat-gozo-replace-front-timber-door-and-restore-facade): To replace front timber door and restore facade wall. Pending, validated 21 October 2026
- [**PA/07207/26** Munxar](https://propertylist.mt/permit/PA-07207-26/munxar-excavate-and-construct-a-garage-underlying-an): To excavate and construct a garage underlying an existing maisonette. Pending, validated 21 October 2026

[All applications by Ramona Cassar](https://propertylist.mt/perit/ramona-cassar)

## More from Manuel Farrugia

- [**PA/07322/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-07322-26/rabat-gozo-replace-front-timber-door-and-restore-facade): To replace front timber door and restore facade wall. Pending, validated 21 October 2026
- [**PA/05980/26** Mosta](https://propertylist.mt/permit/PA-05980-26/mosta-change-of-use-from-a-street-level): Change of use from a street level garage to a Class 1 residential unit. Pending, validated 2 September 2026

[All planning applications in Rabat (Gozo)](https://propertylist.mt/planning-applications/rabat-gozo)