> Granted planning application in Zebbug (Gozo): To propose alterations to the existing storage rooms and build changing rooms and showers. Perit Annamaria…

Planning applications › Zebbug (Gozo) › PA0647023

# PA/06470/23: propose alterations to the existing storage rooms in Zebbug (Gozo)

Storage rooms 1, 2 & 3, under, Triq Santa Marija, Marsalforn, Zebbug (Gozo)

To propose alterations to the existing storage rooms and build changing rooms and showers.

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** Storage rooms 1, 2 & 3, under, Triq Santa Marija, Marsalforn, Zebbug (Gozo)
- **Locality:** [Zebbug (Gozo)](https://propertylist.mt/planning-applications/zebbug-gozo)
- **Applicant:** [Daniel Calleja](https://propertylist.mt/applicant/daniel-calleja)
- **Perit:** [Perit Annamaria Attard Montalto](https://propertylist.mt/perit/annamaria-attard-montalto)
- **Application type:** Full development permission
- **Zone:** Outside Development Zone
- **Type of works:** New Construction
- **Received:** 23 August 2023
- **Validated:** 1 November 2023
- **Published:** 1 November 2023
- **Comments close:** 1 December 2023
- **Recommendation:** Grant Permission
- **Decision:** Grant Permission
- **Decision date:** 2 July 2024
- **Permit expires:** 17 July 2029

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/06470/23)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=06470&caseYear=23)

## Planning activity around Storage rooms 1, 2 & 3, under, Triq Santa Marija, Marsalforn, Zebbug (Gozo)

62 other applications within 300 m: 45 granted, 2 refused, 4 pending. 96% of decided applications nearby were granted. Tallest granted nearby: 6 floors (PA/02160/24).

On Triq Santa Marija: 31 other applications, 24 granted and 1 refused; granted buildings are typically 6 floors, the tallest 6. Periti active on this street: [Saviour Micallef](https://propertylist.mt/perit/saviour-micallef), [Edward Scerri](https://propertylist.mt/perit/edward-scerri), [Emanuel Vella](https://propertylist.mt/perit/emanuel-vella), [Leonard Spiteri](https://propertylist.mt/perit/leonard-spiteri), [Alexander Bigeni](https://propertylist.mt/perit/alexander-bigeni).

Approval estimate for new construction applications like this here: about 89% (likely range 59–100%, low reliability, from 15 comparable decisions nearby). Outside the development zone, where approvals are harder. Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/07258/25** Zebbug (Gozo)](https://propertylist.mt/permit/PA-07258-25/zebbug-gozo-reconstruct-rubble-wall-along-street-and-to): To reconstruct rubble wall along street and to construct rubble wall on the west side and to include access gate. Refused, validated 12 November 2025, 14 m away
- [**PA/03419/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-03419-26/zebbug-gozo-restore-existing-rubble-walls-including-small-access): To restore existing rubble walls including small access. Granted, validated 3 June 2026, 17 m away
- [**PA/05442/25** Zebbug (Gozo)](https://propertylist.mt/permit/PA-05442-25/zebbug-gozo-extend-over-existing-airspace-by-creating-five): To extend over existing airspace by creating five (5) new units, including common parts. Granted, validated 4 November 2025, 114 m away
- [**PA/05441/25** Zebbug (Gozo)](https://propertylist.mt/permit/PA-05441-25/zebbug-gozo-extend-over-existing-airspace-by-creating-four): To extend over existing airspace by creating four (4) new units, including the common parts. Granted, validated 19 November 2025, 119 m away
- [**PA/03038/24** Zebbug (Gozo)](https://propertylist.mt/permit/PA-03038-24/zebbug-gozo-extend-over-existing-airspace): To extend over existing airspace (Block D) by creating 4 new apartments and 1 new penthouse, including also installation of lift. Granted, validated 25 June 2024, 123 m away
- [**PA/04914/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-04914-26/zebbug-gozo-erect-kiosk): To erect kiosk. Pending, validated 15 July 2026, 1 floor, 125 m away
- [**PA/05947/24** Zebbug (Gozo)](https://propertylist.mt/permit/PA-05947-24/zebbug-gozo-extend-over-existing-airspace): To extend over existing airspace (Block I) by creating 2 new apartments and 1 new penthouse, including the installation of lift. Granted, validated 24 October 2024, 131 m away
- [**PA/05237/25** Zebbug (Gozo)](https://propertylist.mt/permit/PA-05237-25/zebbug-gozo-construct-seven-residential-units-in-the-existing): To construct seven residential units in the existing airspace and to propose internal additions to the common areas on all levels to construct a lift shaft to… Withdrawn, 132 m away
- [**PA/05945/24** Zebbug (Gozo)](https://propertylist.mt/permit/PA-05945-24/zebbug-gozo-extend-over-existing-airspace): To extend over existing airspace (Block H) by creating 2 new apartments and 1 new penthouse, including the installation of lift. Granted, validated 21 January 2025, 133 m away
- [**PA/05123/24** Zebbug (Gozo)](https://propertylist.mt/permit/PA-05123-24/zebbug-gozo-extend-existing-penthouse-to-form-two-apartments): To extend existing penthouse to form two apartments and to construct penthouse above. Granted, validated 7 August 2024, 148 m away
- [**PA/01249/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-01249-26/zebbug-gozo-extension-to-unit-at-the-receded-floor): Proposed extension to unit at the receded floor level, subdividing it into two separate units and the construction of an additional two units at the existing… Granted, validated 29 April 2026, 155 m away
- [**PA/03857/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-03857-26/zebbug-gozo-extension-to-existing-unit-located-at-the): Proposed extension to existing unit located at the receded floor; sub-dividing it into two units and the construction of an additional unit at the existing… Pending, validated 26 August 2026, 3 floors plus a receded floor, 156 m away
- [**PA/02120/22** Zebbug (Gozo)](https://propertylist.mt/permit/PA-02120-22/zebbug-gozo-extend-penthouse-approved-in-pa00432-21-and-to): To extend penthouse approved in PA00432/21 and to construct washrooms at roof level. Status being checked, 170 m away
- [**PA/00432/21** Zebbug (Gozo)](https://propertylist.mt/permit/PA-00432-21/zebbug-gozo-carry-out-alterations-to-apartment-and-to): To carry out alterations to apartment and to construct a penthouse on top. Status being checked, 172 m away
- [**PA/04192/23** Zebbug (Gozo)](https://propertylist.mt/permit/PA-04192-23/zebbug-gozo-sanction-tiles-on-facade-and-proposed-minor): To sanction tiles on facade and proposed minor internal alteration to existing private car garage. Granted, validated 22 August 2023, 178 m away

## More by Annamaria Attard Montalto

- [**PA/07535/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-07535-26/rabat-gozo-propose-minimal-internal-layout-changes-at-all): To propose minimal internal layout changes at all levels, with the provision of a bathroom at a mezzanine level and to amend facade design incorporating two… Pending, validated 28 October 2026
- [**PA/07453/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-07453-26/rabat-gozo-renewal-of-permission-pa4674-15-to-amend-and): Renewal of permission PA4674/15: To amend and renew permit PA2609/10, amendments consist of minor internal changes, proposed sign and change in design of… Pending
- [**PA/07279/26** Gharb](https://propertylist.mt/permit/PA-07279-26/gharb-dismantle-and-reinstate-structurally-unsafe-roof-using): To dismantle and reinstate structurally unsafe roof using same materials and to raise same roof by 80cm. Pending, validated 21 October 2026
- [**PA/06984/26** Munxar](https://propertylist.mt/permit/PA-06984-26/munxar-sanction-alterations-from-pa5310-03-and-propose-change): To sanction alterations from PA5310/03 and propose change of use from garage to 1 bed apartment. Pending, validated 14 October 2026
- [**PA/06825/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-06825-26/zebbug-gozo-carry-out-additions-to-an-existing-apartment): To carry out additions to an existing apartment. Pending, validated 14 October 2026
- [**PA/06306/26** Gharb](https://propertylist.mt/permit/PA-06306-26/gharb-sanction-room-at-ground-floor-level): To sanction room at ground floor level, to refurbish and restore an existing dis-used cattle farm, retaining the original architectural features. Proposal… Pending, validated 16 September 2026, 2 floors plus a receded floor

[All applications by Annamaria Attard Montalto](https://propertylist.mt/perit/annamaria-attard-montalto)

## More from Daniel Calleja

- [**PA/06170/24** Zebbug (Gozo)](https://propertylist.mt/permit/PA-06170-24/zebbug-gozo-sanction-increase-in-height-of-rubble-wall): To sanction increase in height of rubble wall, construct agricultural store with basement store, reservoir and install gate, including excavation for… Granted, validated 18 September 2024
- [**PA/01941/22** Rabat (Gozo)](https://propertylist.mt/permit/PA-01941-22/rabat-gozo-internal-alterations-at-ground-and-1st-floor): Internal alterations at ground and 1st floor, add 2nd floor and washroom. Status being checked, 3 floors

[All planning applications in Zebbug (Gozo)](https://propertylist.mt/planning-applications/zebbug-gozo)