---
title: "PA/06493/24: Construction of a workshop warehouse over an in Naxxar | PropertyList"
url: https://propertylist.mt/permit/PA-06493-24/naxxar-construction-of-a-workshop-warehouse-over-an
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-03
---

> Granted planning application in Naxxar: Construction of a workshop warehouse over an existing underground water reservoir. Perit Daniel Micallef Grimaud.…

Planning applications › Naxxar › PA0649324

# PA/06493/24: Construction of a workshop warehouse over an in Naxxar

MN Workshop at ECOhive Complex, Tul il-Kosta, Naxxar

Construction of a workshop warehouse over an existing underground water reservoir.

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** MN Workshop at ECOhive Complex, Tul il-Kosta, Naxxar
- **Locality:** [Naxxar](https://propertylist.mt/planning-applications/naxxar)
- **Applicant:** [Wasteserv Malta Ltd. Attn: Richard Bilocca](https://propertylist.mt/applicant/wasteserv-malta-ltd)
- **Perit:** [Perit Daniel Micallef Grimaud](https://propertylist.mt/perit/daniel-micallef-grimaud)
- **Application type:** Full development permission
- **Zone:** Outside Development Zone
- **Type of works:** New Construction (Commercial)
- **Received:** 2 July 2024
- **Validated:** 2 October 2024
- **Published:** 2 October 2024
- **Comments close:** 1 November 2024
- **Recommendation:** Grant Permission
- **Decision:** Grant Permission
- **Decision date:** 1 August 2025
- **Permit expires:** 20 August 2030

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/06493/24)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=06493&caseYear=24)

## Planning activity around MN Workshop at ECOhive Complex, Tul il-Kosta, Naxxar

20 other applications on the same street: 10 granted, 0 refused, 5 pending. 100% of decided applications nearby were granted.

On Tul il-Kosta: 20 other applications, 10 granted and 0 refused. Periti active on this street: [Edric Micallef](https://propertylist.mt/perit/edric-micallef), [Daniel Micallef Grimaud](https://propertylist.mt/perit/daniel-micallef-grimaud), [Raphael Abdilla](https://propertylist.mt/perit/raphael-abdilla), [Anthony Fenech Vella](https://propertylist.mt/perit/anthony-fenech-vella).

Approval estimate for new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 3 comparable decisions nearby). Outside the development zone, where approvals are harder. Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/05805/26** Naxxar](https://propertylist.mt/permit/PA-05805-26/naxxar-construction-of-administration-building): Construction of administration building. Pending, validated 19 August 2026
- [**PA/05610/26** Naxxar](https://propertylist.mt/permit/PA-05610-26/naxxar-demolition-and-reconstruction-of-weighbridge-and-gatehouse): Demolition and reconstruction of weighbridge and gatehouse. Pending, validated 19 August 2026, 1 floor
- [**PA/05204/26** Naxxar](https://propertylist.mt/permit/PA-05204-26/naxxar-multi-lane-slide-as-part-of-the-slide): Proposed multi-lane slide as part of the slide group including splash pool and underlying relating facilities. Pending, validated 29 July 2026
- [**PA/04797/26** Naxxar](https://propertylist.mt/permit/PA-04797-26/naxxar-demolition-of-an-existing-gate-house-and): Demolition of an existing gate house and two weighbridges, excavation and construction of two gate houses, three weighbridges and cesspit. Granted, validated 15 July 2026
- [**PA/03149/26** Naxxar](https://propertylist.mt/permit/PA-03149-26/naxxar-installation-of-a-single-sided-solar-powered-externally): Proposed installation of a single-sided solar powered externally illuminated billboard - static billboard with external lighting (no LED display). Pending, validated 20 May 2026
- [**PA/05802/25** Naxxar](https://propertylist.mt/permit/PA-05802-25/naxxar-alterations-to-existing-ad-chemical-room-to): Alterations to existing AD chemical room to increase the existing sump capacity. Granted, validated 10 September 2025
- [**PA/02746/25** Naxxar](https://propertylist.mt/permit/PA-02746-25/naxxar-erect-multilane-slide-as-part-of-the): To erect multilane slide as part of the slide group. Granted, validated 30 April 2025
- [**PA/02018/25** Naxxar](https://propertylist.mt/permit/PA-02018-25/naxxar-sanction-change-of-use-to-fire-pump): To sanction change of use to fire pump room with fuel tank, capacity 206 litres. Granted, validated 2 April 2025
- [**PA/07315/24** Naxxar](https://propertylist.mt/permit/PA-07315-24/naxxar-formation-of-pool-and-erection-of-light-weight): Proposed formation of pool and erection of light-weight shading structure in front garden over site covered by PA/2413/21. Proposed removal of front garden… Granted, validated 30 January 2025
- [**PA/00454/25** Naxxar](https://propertylist.mt/permit/PA-00454-25/naxxar-sanction-change-of-use-to-pasteurisation-unit): To sanction change of use to pasteurisation unit with fuel tank, capacity 3000 litres. Granted, validated 29 January 2025
- [**PA/05583/24** Naxxar](https://propertylist.mt/permit/PA-05583-24/naxxar-the-conversion-of-a-manure-shed-into): Application for the conversion of a manure shed into workshop, stores and offices. Granted, validated 28 August 2024
- [**PA/00993/23** Naxxar](https://propertylist.mt/permit/PA-00993-23/naxxar-oversite-excavation-and-proposed-construction-of-organic): Oversite excavation and proposed construction of organic processing plant including an administration building, weighing room, energy building, boiler and… Granted, validated 22 May 2024
- [**PA/03521/23** Naxxar](https://propertylist.mt/permit/PA-03521-23/naxxar-place-a-billboard-within-the-boundaries-of): To place a billboard within the boundaries of the area forming part of the EcoHive complex administered by Wasteserv Malta Ltd. Billboard will be illuminated… Granted, validated 14 June 2023
- [**PA/01041/23** Naxxar](https://propertylist.mt/permit/PA-01041-23/naxxar-sanction-position-of-apertures-on-parts-of): To sanction position of apertures on parts of the façade and proposed extension to existing offices (Class 4A) and the construction of a new Class 4A office… Granted, validated 1 March 2023
- [**PA/00297/21** Naxxar](https://propertylist.mt/permit/PA-00297-21/naxxar-construction-of-a-workshop-warehouse-over-an): Construction of a workshop warehouse over an existing underground water reservoir. Status being checked

## More by Daniel Micallef Grimaud

- [**PA/02018/25** Naxxar](https://propertylist.mt/permit/PA-02018-25/naxxar-sanction-change-of-use-to-fire-pump): To sanction change of use to fire pump room with fuel tank, capacity 206 litres. Granted, validated 2 April 2025
- [**PA/00454/25** Naxxar](https://propertylist.mt/permit/PA-00454-25/naxxar-sanction-change-of-use-to-pasteurisation-unit): To sanction change of use to pasteurisation unit with fuel tank, capacity 3000 litres. Granted, validated 29 January 2025
- [**PA/07018/23** Naxxar](https://propertylist.mt/permit/PA-07018-23/naxxar-ghallis-non-hazardous-landfill-profile-volume-increase): Ghallis non-hazardous landfill profile volume increase. Granted, validated 11 December 2024
- [**PA/03422/22** Naxxar](https://propertylist.mt/permit/PA-03422-22/naxxar-upgrading-of-the-road-network-at-the): Upgrading of the road network at the Ecohive complex, Maghtab Status being checked

[All applications by Daniel Micallef Grimaud](https://propertylist.mt/perit/daniel-micallef-grimaud)

## More from Wasteserv Malta Ltd

- [**PA/07528/26** Birzebbuga](https://propertylist.mt/permit/PA-07528-26/birzebbuga-proposed-development-comprises-an-extension-to-the): The proposed development comprises an extension to the existing administration building to accommodate a new reception area, security office, kitchenette, and… Pending
- [**PA/05805/26** Naxxar](https://propertylist.mt/permit/PA-05805-26/naxxar-construction-of-administration-building): Construction of administration building. Pending, validated 19 August 2026
- [**PA/05610/26** Naxxar](https://propertylist.mt/permit/PA-05610-26/naxxar-demolition-and-reconstruction-of-weighbridge-and-gatehouse): Demolition and reconstruction of weighbridge and gatehouse. Pending, validated 19 August 2026, 1 floor
- [**PA/04797/26** Naxxar](https://propertylist.mt/permit/PA-04797-26/naxxar-demolition-of-an-existing-gate-house-and): Demolition of an existing gate house and two weighbridges, excavation and construction of two gate houses, three weighbridges and cesspit. Granted, validated 15 July 2026
- [**PA/04178/26** Xewkija](https://propertylist.mt/permit/PA-04178-26/xewkija-minor-internal-alterations-to-existing-facility-and): Proposed minor internal alterations to existing facility and sanctioning of internal variations from approved permit PA/02805/14. Suspended, validated 17 June 2026
- [**PA/03941/26** Naxxar](https://propertylist.mt/permit/PA-03941-26/naxxar-partial-demolition-of-a-retaining-wall-to): Proposed partial demolition of a retaining wall to make space for a substation. Proposal includes reconstruction of wall with a different layout, construction… Pending, validated 10 June 2026

[All planning applications in Naxxar](https://propertylist.mt/planning-applications/naxxar)
