PA/06625/26: excavate vacant site and proposed construction of in Zabbar
Infill Plot, Triq ic-Cimiterju, Zabbar
To excavate vacant site and proposed construction of basement private car garages, 1 maisonette at ground floor level, 3 apartments at first, second, third and 1 penthouse at receded floor.
- Status
- Pending (The case is currently at vetting stage awaiting submission of additional information from the perit of the case)
- Location
- Infill Plot, Triq ic-Cimiterju, Zabbar
- Locality
- Zabbar
- Applicant
- Daniel Zahra
- Perit
- Perit James Bonnici Camilleri
- Application type
- Full development permission
- Zone
- Within Development Zone
- Type of works
- New Construction (Residential)
- Height
- 4 floors plus a receded floor
- Residential units
- 5
- Received
- 1 June 2026
- Published
- 23 September 2026
- Comments close
- 8 October 2026
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around Infill Plot, Triq ic-Cimiterju, Zabbar
121 other applications within 300 m: 81 granted, 2 refused, 11 pending. 98% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/04812/25).
On Triq ic-Cimiterju: 13 other applications, 10 granted and 0 refused; granted buildings are typically 4 floors, the tallest 4. Periti active on this street: Patrick Refalo.
Approval estimate for new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 13 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/01069/24 Zabbar: Proposed restoration of the facade.
- PA/00216/24 Zabbar: Proposed clearing of site, excavation of two floors and construction of aquamation centre and cemeterial facilities. Consisting of basement parking at lower…
- PA/07307/26 Zabbar: Proposed site clearance, excavation of the site, and construction of tombs at ground floor level together with columbariums.
- PA/04506/26 Zabbar: Proposed change of use from pre-1968 domestic car garage to public service garage.
- PA/06218/26 Zabbar: To excavate existing vacant site, and proposed construction of 1 private car garage and 2 parking spaces at basement level, 1 maisonette at ground floor…
- PA/03668/23 Zabbar: Internal alterations to existing first floor maisonette covered by RG/01834/20 including creation of common parts with lift and changes in internal walls…
- PA/01410/21 Zabbar: To carry out minor alteration in the front facade, installation of air conditioning unit, aluminium railing and perforated steel mesh balcony.
- PA/06326/26 Zabbar: Change of use from Class 4B to Class 4A, changes to facade sign and proposed minor internal alterations.
- PA/05126/24 Zabbar: Proposed change of use from private car garage to Class 4B shop including internal alterations and installation of sign.
- PA/02427/25 Zabbar: To demolish the existing washroom at second floor. To erect a new dwelling at second floor and washrooms at third floor level. Proposal also to include…
- PA/00407/23 Zabbar: To sanction variations from approved permit PA3741/15 including sanctioning of apertures.
- PA/06990/24 Zabbar: Excavation of existing site and construction of basement garages, five overlying apartments and pool at roof level.
- PA/00175/23 Zabbar: Proposed development of vacant plot: proposal consists of excavation and construction of underground water reservoir, construction of ground floor maisonette,…
- PA/06242/23 Zabbar: Proposed construction of basement car spaces, ground floor garage and first, second, third floor apartments and fourth floor receded floor.
- PA/05847/26 Zabbar: Proposed sanctioning of variation in internal heights of apartment in lieu of PA6897/17.
More by James Bonnici Camilleri
- PA/07716/26 St Julians: To propose minor internal and external alterations to pre-1967 townhouse, and convert into a ground floor maisonette, 3 overlying apartments and a penthouse…
- PA/07633/26 San Pawl il-Bahar: To demolish existing dwelling, excavate site to necessary levels and propose construction of 3 levels of basement garages, 2 Class 4B shops including signage,…
- PA/07483/26 Zurrieq: To carry out changes to PA7127/25 including modification to internal layout and facade.
- PA/07384/26 Santa Venera: To sanction as built first floor plan.
- PA/07375/26 Marsaskala: To demolish terraced house, propose excavation for reservoir, street level garage, maisonette, 3 overlying units and a penthouse at receded level.
- PA/07367/26 Hamrun: To propose minor internal alteration to approved PA/4200/25 including projections in backyard and shifting of walls.
All applications by James Bonnici Camilleri
More from Daniel Zahra
- PA/07716/26 St Julians: To propose minor internal and external alterations to pre-1967 townhouse, and convert into a ground floor maisonette, 3 overlying apartments and a penthouse…
- PA/07633/26 San Pawl il-Bahar: To demolish existing dwelling, excavate site to necessary levels and propose construction of 3 levels of basement garages, 2 Class 4B shops including signage,…
- PA/07483/26 Zurrieq: To carry out changes to PA7127/25 including modification to internal layout and facade.
- PA/07384/26 Santa Venera: To sanction as built first floor plan.
- PA/07375/26 Marsaskala: To demolish terraced house, propose excavation for reservoir, street level garage, maisonette, 3 overlying units and a penthouse at receded level.
- PA/07367/26 Hamrun: To propose minor internal alteration to approved PA/4200/25 including projections in backyard and shifting of walls.