---
title: "PA/06637/25: sanction works carried out post-1968 to a in Zabbar | PropertyList"
url: https://propertylist.mt/permit/PA-06637-25/zabbar-sanction-works-carried-out-post-1968-to-a
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-02
---

> Granted planning application in Zabbar: To sanction works carried out post-1968 to a pre-1967 dwelling. Perit Clayton Zammit. Validated 15 October 2025.

Planning applications › Zabbar › PA0663725

# PA/06637/25: sanction works carried out post-1968 to a in Zabbar

15, Triq San Guzepp c/w, Triq Santa Marija, Zabbar

To sanction works carried out post-1968 to a pre-1967 dwelling.

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** 15, Triq San Guzepp c/w, Triq Santa Marija, Zabbar
- **Locality:** [Zabbar](https://propertylist.mt/planning-applications/zabbar)
- **Applicant:** [Stephen Borg](https://propertylist.mt/applicant/stephen-borg)
- **Perit:** [Perit Clayton Zammit](https://propertylist.mt/perit/clayton-zammit)
- **Application type:** Full development permission
- **Zone:** Within Development Zone
- **Type of works:** Sanctioning
- **Residential units:** 1
- **Received:** 16 September 2025
- **Validated:** 15 October 2025
- **Published:** 15 October 2025
- **Comments close:** 14 November 2025
- **Recommendation:** Grant Permission
- **Decision:** Grant Permission
- **Decision date:** 9 April 2026
- **Permit expires:** 6 May 2031

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/06637/25)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=06637&caseYear=25)

## Planning activity around 15, Triq San Guzepp c/w, Triq Santa Marija, Zabbar

122 other applications within 300 m: 71 granted, 3 refused, 11 pending. 96% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/00961/24).

On Triq San Guzepp: 21 other applications, 13 granted and 0 refused; granted buildings are typically 3 floors, the tallest 3. Periti active on this street: [Karys Schembri](https://propertylist.mt/perit/karys-schembri), [Randolph Nicholas Bartoli](https://propertylist.mt/perit/randolph-nicholas-bartoli), [Mark Abela](https://propertylist.mt/perit/mark-abela).

Approval estimate for sanctioning applications like this here: about 95% (likely range 65–100%, low reliability, from 25 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/00736/22** Zabbar](https://propertylist.mt/permit/PA-00736-22/zabbar-demolish-existing-dwelling-and-construction-of-ground): To demolish existing dwelling and construction of ground floor garage, 3 overlying apartments and a penthouse. Status being checked, 4 floors plus a receded floor, 23 m away
- [**PA/01030/21** Zabbar](https://propertylist.mt/permit/PA-01030-21/zabbar-demolish-existing-building-and-construct-2-garages): To demolish existing building and construct 2 garages and a Class 4B shop at ground floor level including 3 apartments and a penthouse. Status being checked, 2 floors plus a receded floor, 47 m away
- [**PA/06650/25** Zabbar](https://propertylist.mt/permit/PA-06650-25/zabbar-sanction-variations-from-pa-08354-20): To sanction variations from PA/08354/20 (MA) incl. changes in height levels. Granted, validated 15 October 2025, 58 m away
- [**PA/02010/24** Zabbar](https://propertylist.mt/permit/PA-02010-24/zabbar-demolish-existing-terraced-house-and-construction-of): To demolish existing terraced house and construction of groundfloor garage, and four apartments. A lift is also proposed Under appeal, validated 12 August 2024, 62 m away
- [**PA/00590/26** Zabbar](https://propertylist.mt/permit/PA-00590-26/zabbar-pool-at-roof-level): Proposed pool at roof level ( to include staircase ). Granted, validated 4 February 2026, 65 m away
- [**PA/04336/26** Zabbar](https://propertylist.mt/permit/PA-04336-26/zabbar-demolition-of-terraced-house): Proposed demolition of terraced house, excavation and construction of water reservoir and swimming pool, construction of ground floor garage and maisonette,… Refused, validated 24 June 2026, 4 floors plus a receded floor, 80 m away
- [**PA/00022/26** Zabbar](https://propertylist.mt/permit/PA-00022-26/zabbar-demolition-of-existing-terraced-house): Demolition of existing terraced house, excavation of underground reservoir and construction of underground reservoir, Class 4B shop, 2 garages, duplex… Pending, validated 14 January 2026, 96 m away
- [**PA/01717/25** Zabbar](https://propertylist.mt/permit/PA-01717-25/zabbar-sanction-aluminum-louvered-cabinets-in-front-garden): To sanction aluminum louvered cabinets in front garden for screening of services. Proposed aluminum louvered cabinets in front garden. Shifting of tables and… Granted, validated 25 June 2025, 101 m away
- [**PA/02289/26** Zabbar](https://propertylist.mt/permit/PA-02289-26/zabbar-sanction-existing-ground-floor-garage): To sanction existing ground floor garage (no previous permits traced). Granted, validated 8 May 2026, 104 m away
- [**PA/07317/26** Zabbar](https://propertylist.mt/permit/PA-07317-26/zabbar-sanction-house-as-built-from-pb-06531-80): To sanction house as built from PB/06531/80. Pending, 104 m away
- [**PA/06315/23** Zabbar](https://propertylist.mt/permit/PA-06315-23/zabbar-propose-minor-internal-alterations-addition-on-terrace): To propose minor internal alterations addition on terrace at first floor level and games room at second floor level. Granted, validated 25 October 2023, 108 m away
- [**PA/02139/22** Zabbar](https://propertylist.mt/permit/PA-02139-22/zabbar-sanction-changes-from-approved-permit-pb3944-89): To sanction changes from approved permit PB3944/89. Proposal also includes minor alterations at first floor and the erection of a separate unit at second… Status being checked, 3 floors, 113 m away
- [**PA/04115/25** Zabbar](https://propertylist.mt/permit/PA-04115-25/zabbar-change-of-use-from-garage-to-class): Change of use from garage to Class 3C gymnasium. Proposal includes extension in back yard to provide storage space. Refused, validated 25 June 2025, 115 m away
- [**PA/00788/20** Zabbar](https://propertylist.mt/permit/PA-00788-20/zabbar-construction-of-6-apartments-and-1-penthouse): Construction of 6 apartments and 1 penthouse having a pool on the front terrace, over existing ground floor garages (qty:5). Status being checked, 121 m away
- [**PA/00033/25** Zabbar](https://propertylist.mt/permit/PA-00033-25/zabbar-proposal-of-extension-of-the-approved-receded): Proposal of extension of the approved receded floor including a small spiral staircase to the upper roof and sanctioning of the retractable awning and… Granted, validated 15 January 2025, 122 m away

## More by Clayton Zammit

- [**PA/07793/26** Mellieha](https://propertylist.mt/permit/PA-07793-26/mellieha-sanction-the-apartment-as-built-from-the): To sanction the apartment as built from the approved permit PA/00755/21 Pending
- [**PA/07127/26** Birkirkara](https://propertylist.mt/permit/PA-07127-26/birkirkara-construct-three-apartments-at-second): To construct three apartments at second, third and receded levels overlying existing first floor maisonette. Application includes alterations to first floor… Pending, validated 14 October 2026, 4 floors plus a receded floor
- [**PA/06973/26** Mellieha](https://propertylist.mt/permit/PA-06973-26/mellieha-sanction-minor-discrepancies-from-the-approved-permit): To sanction minor discrepancies from the approved permit PA/03657/06. Pending
- [**PA/06651/26** Mellieha](https://propertylist.mt/permit/PA-06651-26/mellieha-sanction-the-apartment-at-elevated-ground-floor): To sanction the apartment at elevated ground floor level and domestic store at roof floor level as built. Pending
- [**PA/06395/26** Mgarr](https://propertylist.mt/permit/PA-06395-26/mgarr-construct-a-pump-room): To construct a pump room, repair, where necessary, the rubble wall enclosing the agricultural field and install a timber gate for security. Pending, validated 23 September 2026
- [**PA/04718/26** Mosta](https://propertylist.mt/permit/PA-04718-26/mosta-sanction-minor-differences-following-survey-from-the): To sanction minor differences following survey from the approved DN/918/04. Granted, validated 24 August 2026

[All applications by Clayton Zammit](https://propertylist.mt/perit/clayton-zammit)

## More from Stephen Borg

- [**PA/07073/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07073-26/san-pawl-il-bahar-propose-minor-variations-from-approved-permit-by): To propose minor variations from approved permit by virtue PA/01343/26 which consists of enlargement of existing windows. Pending
- [**PA/03962/26** Kercem](https://propertylist.mt/permit/PA-03962-26/kercem-alteration-to-dwellings-approved-in-pa-8662-24-and): Alteration to dwellings approved in PA/8662/24 and add washrooms at roof level. Granted, validated 17 June 2026
- [**PA/01343/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01343-26/san-pawl-il-bahar-propose-minor-internal-alterations-to-beach-room): To propose minor internal alterations to beach room from approved permit by virtue RG/00739/24. Granted, validated 4 March 2026
- [**PA/00777/25** Xaghra](https://propertylist.mt/permit/PA-00777-25/xaghra-renew-development-permit-pa4161-19-internal): To renew development permit - PA4161/19 - Internal alterations to an existing dwelling, extension at first floor level and construction of a pool. Granted, validated 14 March 2025
- [**PA/08662/24** Kercem](https://propertylist.mt/permit/PA-08662-24/kercem-construct-two-dwellings): To construct two dwellings. Granted, validated 15 January 2025
- [**PA/03259/24** Hamrun](https://propertylist.mt/permit/PA-03259-24/hamrun-sanction-changes-to-pre-1968-dwelling): To sanction changes to pre-1968 dwelling. Withdrawn

[All planning applications in Zabbar](https://propertylist.mt/planning-applications/zabbar)
