PA/06774/24: Additions and alterations including the construction of in St Julians
Marina Hotel Corinthia Beach Resort, ix-Xatt ta' San Gorg, San Giljan
Additions and alterations including the construction of additional floors to the existing hotel (Class 3B).
- Status
- Granted (This application has been approved by Planning Board / Commission.)
- Location
- Marina Hotel Corinthia Beach Resort, ix-Xatt ta' San Gorg, San Giljan
- Locality
- St Julians
- Applicant
- Marina Hotel Limited Attn: Simon Naudi
- Perit
- Perit Claire Bezzina
- Application type
- Outline development permission
- Zone
- Within Development Zone
- Type of works
- Hotel
- Received
- 7 August 2024
- Validated
- 9 October 2024
- Published
- 9 October 2024
- Comments close
- 8 November 2024
- Recommendation
- Grant Permission
- Decision
- Grant Permission
- Decision date
- 29 January 2026
- Permit expires
- 18 February 2031
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around Marina Hotel Corinthia Beach Resort, ix-Xatt ta' San Gorg, San Giljan
12 other applications on the same street: 8 granted, 0 refused, 1 pending. 100% of decided applications nearby were granted.
On ix-Xatt ta' San Gorg: 12 other applications, 8 granted and 0 refused. Periti active on this street: Claire Bezzina, Darren Sciberras, Ruben Sciortino.
Approval estimate for hotel applications like this here: about 95% (likely range 65–100%, low reliability, from 2 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/05423/26 St Julians: Sanctioning of excavation of existing rock and concrete platform in front of boathouses and proposed extension of existing area to approved lido and pool deck…
- PA/01927/26 St Julians: Proposed retractable roof structure with glazed openings to terrace area (terrace extension previously approved in PA/04469/23).
- PA/07224/25 St Julians: Demolition of existing structures (boathouses) and proposed construction of pool and deck, including the excavation of necessary pool structure.
- PA/04878/25 St Julians: Renewal of PA/02478/16. Description of works included: Demolition of all existing buildings forming part of St. George's Bay Hotel and ancillary facilities,…
- PA/07049/24 St Julians: Proposed expansion of existing hotel (Class 3B), including conversion of existing terraces into additional rooms and construction of two recessed additional…
- PA/04576/24 St Julians: Change in signage and facade paint to the existing hotel (Class 3B).
- PA/02658/24 St Julians: To sanction construction of kiosk.
- PA/01165/24 St Julians: Sanctioning of an additional dining facility, ancillary to the existing hotel, and proposed additional timber structure for outdoor dining
- PA/04469/23 St Julians: Proposed amendments to covered structure over existing terrace (previously approved in PA/01998/22), including the proposed extension of terrace at upper…
- PA/01998/22 St Julians: Proposed covered structure with glazed openings over existing terrace and extension of terrace.
- PA/02465/21 St Julians: To sanction construction of kiosk
- PA/03625/22 St Julians: Proposal for new photovoltaic panels.
More by Claire Bezzina
- PA/07413/26 Qrendi: Proposed installation of mobile telephony infrastructure at roof level.
- PA/07199/26 Mellieha: Sanctioning change of use fom gelateria to a kitchen/bar (takeaway) ancillary to the existing hotel, including internal alterations.
- PA/07198/26 St Julians: External alterations to an existing elderly care home ancillary (Class 2A), including reconfiguration of planters and increasing the number of parking spaces.
- PA/06764/26 St Julians: Proposed alterations and extensions at ground and first floor levels to an existing elderly care home (Class 2A) and ancillary facilities; the construction of…
- PA/06475/26 Safi: Proposed substation, switch room and store (ancillary to existing aviation-related structures).
- PA/06241/26 Floriana: Proposed internal alterations and refurbishment of the existing office premises (Class 4A), including the demolition and reconstruction of internal walls,…