> Granted planning application in Zebbug: To sanction changes from PA/03753/15, including changes to the ramp at level -1, signage above main door, shifting…

Planning applications › Zebbug › PA0681825

# PA/06818/25: sanction changes from PA/03753/15 in Zebbug

Pro Health, Triq l-Imdina c/w, Triq Dun Bartilmew Attard, Zebbug

To sanction changes from PA/03753/15, including changes to the ramp at level -1, signage above main door, shifting of walls, shifting of stairwell, removal of car lift, change of use of level -2 from parking to Class 6A storage, addition of substation at level -1, shifting of approved level 3 addition, changes to stairs configuration and minor external changes to the facade. Proposed change of use from Class 6A storage to Class 5A research and development at level 1 and change of use from Class 4A office to canteen at level 3.

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** Pro Health, Triq l-Imdina c/w, Triq Dun Bartilmew Attard, Zebbug
- **Locality:** [Zebbug](https://propertylist.mt/planning-applications/zebbug)
- **Applicant:** 13643 Attn: Peter Apap
- **Perit:** [Perit Ivan Bondin](https://propertylist.mt/perit/ivan-bondin)
- **Application type:** Full development permission
- **Zone:** Within Development Zone
- **Type of works:** Sanctioning
- **Received:** 24 June 2025
- **Validated:** 22 October 2025
- **Decision:** Grant Permission
- **Decision date:** 4 February 2026

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/06818/25)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=06818&caseYear=25)

## Planning activity around Pro Health, Triq l-Imdina c/w, Triq Dun Bartilmew Attard, Zebbug

81 other applications within 300 m: 39 granted, 6 refused, 14 pending. 87% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/02594/25).

On Triq l-Imdina: 78 other applications, 37 granted and 6 refused; granted buildings are typically 5 floors, the tallest 5. Periti active on this street: [Colin Zammit](https://propertylist.mt/perit/colin-zammit), [Charles Azzopardi](https://propertylist.mt/perit/charles-azzopardi), [Krista Xuereb](https://propertylist.mt/perit/krista-xuereb), [Keith Schembri](https://propertylist.mt/perit/keith-schembri), [Charles Buhagiar](https://propertylist.mt/perit/charles-buhagiar).

Approval estimate for sanctioning applications like this here: about 95% (likely range 65–100%, low reliability, from 13 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/01849/23** Zebbug](https://propertylist.mt/permit/PA-01849-23/zebbug-renewal-application-for-pa-03645-17-construction-of): Renewal application for PA/03645/17 - Construction of sheep farm, including the construction of boundary walls with random stonework and sanctioning of gate.… Granted, validated 18 May 2023, 227 m away
- [**PA/01224/23** Zebbug](https://propertylist.mt/permit/PA-01224-23/zebbug-construction-of-sheep-farm): Construction of sheep farm. Granted, validated 8 March 2023, 228 m away
- [**PA/05409/26** Zebbug](https://propertylist.mt/permit/PA-05409-26/zebbug-relocation-of-gate): Proposed relocation of gate, green house, and underlying reservoir. Pending, validated 19 August 2026, 259 m away
- [**PA/02600/26** Zebbug](https://propertylist.mt/permit/PA-02600-26/zebbug-propose-construction-of-chicken-units): To propose construction of chicken units, workshop / equipment store, silos, manure clamp, cesspit, packing room, office, and ancillary facilities. Proposal… Pending, 1 floor, 414 m away
- [**PA/01107/21** Zebbug](https://propertylist.mt/permit/PA-01107-21/zebbug-construct-reservoir-and-pump-room): To construct reservoir and pump room. Application also includes the construction of a rubble boundary wall and the installation of a timber gate. Status being checked, 457 m away
- [**PA/07708/24** Zebbug](https://propertylist.mt/permit/PA-07708-24/zebbug-single-sided-electronic-led-billboard): Proposed single sided electronic LED billboard. Granted, validated 13 November 2024, 761 m away
- [**PA/01805/23** Zebbug](https://propertylist.mt/permit/PA-01805-23/zebbug-removal-of-existing-ready-mix-plant-and): Removal of existing ready mix plant and construction of warehouses, as already approved in PA/05006/18" Withdrawn, 1394 m away
- [**PA/04021/23** Zebbug](https://propertylist.mt/permit/PA-04021-23/zebbug-reservoir-and-pump-room): Proposed reservoir and pump room, and reconstruction of rubble wall Granted, validated 5 July 2023, 1512 m away
- [**PA/03448/24** Zebbug](https://propertylist.mt/permit/PA-03448-24/zebbug-reconstruct-collapsed-slabs-in-existing-agricultural-store): To reconstruct collapsed slabs in existing agricultural store. Granted, validated 12 June 2024, 1530 m away
- [**PA/08715/24** Zebbug](https://propertylist.mt/permit/PA-08715-24/zebbug-maintenance-of-existing-rubble-walls): Maintenance of existing rubble walls, deposit of soil and installation of gate. Granted, validated 15 January 2025, 1541 m away
- [**PA/00747/25** Zebbug](https://propertylist.mt/permit/PA-00747-25/zebbug-proposal-includes-rubble-wall-around-the-site): The proposal includes rubble wall around the site together with reservoir and pump room. Granted, validated 5 February 2025, 1701 m away
- [**PA/02404/21** Zebbug](https://propertylist.mt/permit/PA-02404-21/zebbug-construct-a-rabbit-farm-with-ancillary-facilities): To construct a rabbit farm with ancillary facilities and to sanction the hard landscaping, a pump room with underlying reservoir Status being checked, 1746 m away
- [**PA/06550/24** Zebbug](https://propertylist.mt/permit/PA-06550-24/zebbug-sanction-industrial-garages-as-built): To sanction industrial garages as built (Class 5A - light industry, Class 6A - storage and distribution and Class 6B - boatyards). Pending, validated 25 September 2024, 1769 m away
- [**PA/07529/26** Zebbug](https://propertylist.mt/permit/PA-07529-26/zebbug-alteration-of-volleyball-court-and-adjoining-hardstand): Proposed alteration of volleyball court and adjoining hardstand into two padel courts. Pending, validated 28 October 2026, 2015 m away
- [**PA/04717/26** Zebbug](https://propertylist.mt/permit/PA-04717-26/zebbug-installation-of-lpg-tank): Proposed installation of LPG Tank. Granted, validated 8 July 2026, 2015 m away

## More by Ivan Bondin

- [**PA/07067/26** Marsa](https://propertylist.mt/permit/PA-07067-26/marsa-minor-and-internal-alterations-to-class-6a): Proposed minor and internal alterations to Class 6A stores and garages at ground floor level. Proposed construction of 3 apartments at first, second and… Pending, validated 14 October 2026, 3 floors plus a receded floor
- [**PA/06757/26** Gudja](https://propertylist.mt/permit/PA-06757-26/gudja-sanction-minor-changes-from-approved-permit-pa-02471-14): To sanction minor changes from approved permit PA/02471/14, changes include shifting of walls and levels. Proposed changes to ground floor duplex unit,… Pending, validated 30 September 2026
- [**PA/06649/26** Birkirkara](https://propertylist.mt/permit/PA-06649-26/birkirkara-alterations-and-additions-to-pre-1967-property-including): Proposed alterations and additions to pre-1967 property including demolition of internal walls at ground floor, proposed alterations to stairwell at all… Pending, validated 30 September 2026
- [**PA/04978/26** Zejtun](https://propertylist.mt/permit/PA-04978-26/zejtun-alteration-to-house-with-the-addition-of): Proposed alteration to house with the addition of a one car private parking garage. Pending, validated 22 July 2026
- [**PA/04817/26** Mqabba](https://propertylist.mt/permit/PA-04817-26/mqabba-changes-and-additions-to-approved-permit-pa-04405-18): Proposed changes and additions to approved permit PA/04405/18. Changes include reconfiguration of common area and first floor apartment. Proposed construction… Suspended, validated 15 July 2026, 4 floors plus a receded floor
- [**PA/04658/26** Zurrieq](https://propertylist.mt/permit/PA-04658-26/zurrieq-changes-to-approved-permit-pa-02945-25): Proposed changes to approved permit PA/02945/25, changes include shifting of levels and changes in configuration at ground floor level. Granted, validated 8 July 2026

[All applications by Ivan Bondin](https://propertylist.mt/perit/ivan-bondin)

[All planning applications in Zebbug](https://propertylist.mt/planning-applications/zebbug)