---
title: "PA/06986/26: demolish the existing first-floor maisonette and undertake in Zabbar |…"
url: https://propertylist.mt/permit/PA-06986-26/zabbar-demolish-the-existing-first-floor-maisonette-and-undertake
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-02
---

> Pending planning application in Zabbar: To demolish the existing first-floor maisonette and undertake alterations at ground floor level, to construct four…

Planning applications › Zabbar › PA0698626

# PA/06986/26: demolish the existing first-floor maisonette and undertake in Zabbar

Godmar, Triq Agatha Barbara c/w, Triq Wigi Bongailas, Zabbar

To demolish the existing first-floor maisonette and undertake alterations at ground floor level, to construct four apartments at first and second floor levels, and two duplex apartments spanning the third and fourth floors. The proposal also includes the construction of swimming pools at fourth floor level, serving the two duplex apartments.

- **Status:** Pending (Awaiting Recommendation)
- **Location:** Godmar, Triq Agatha Barbara c/w, Triq Wigi Bongailas, Zabbar
- **Locality:** [Zabbar](https://propertylist.mt/planning-applications/zabbar)
- **Applicant:** [MNA Property Ltd Attn: Andrew Azzopardi](https://propertylist.mt/applicant/mna-property-ltd)
- **Perit:** [Perit Joseph Bondin](https://propertylist.mt/perit/joseph-bondin)
- **Application type:** Full development permission
- **Zone:** Within Development Zone
- **Type of works:** Demolition & New Construction (Residential)
- **Height:** 4 floors
- **Residential units:** 6
- **Received:** 15 September 2026
- **Validated:** 21 October 2026
- **Published:** 21 October 2026
- **Comments close:** 20 November 2026

The public planning file has 15 documents: plans, reports, consultations and the decision.

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/06986/26)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=06986&caseYear=26)

## Planning activity around Godmar, Triq Agatha Barbara c/w, Triq Wigi Bongailas, Zabbar

71 other applications within 300 m: 40 granted, 1 refused, 8 pending. 98% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/06890/25).

On Triq Agatha Barbara: 9 other applications, 5 granted and 0 refused; granted buildings are typically 4 floors, the tallest 4. Periti active on this street: [Randolph Nicholas Bartoli](https://propertylist.mt/perit/randolph-nicholas-bartoli), [Ruben Sciortino](https://propertylist.mt/perit/ruben-sciortino).

Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 9 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/07155/26** Zabbar](https://propertylist.mt/permit/PA-07155-26/zabbar-sanctioning-as-built-and-proposed-alterations-from): Proposed sanctioning as built and proposed alterations from approved PA/01351/10 and variations from the official building alignment. Proposed demolition of… Pending, validated 14 October 2026, 4 floors plus a receded floor, 13 m away
- [**PA/00372/26** Zabbar](https://propertylist.mt/permit/PA-00372-26/zabbar-sanction-size-of-backyard-from-that-approved): To sanction size of backyard from that approved in PA2093/21 and roofing/enclosing of back terrace at penthouse level to form drying area. Granted, validated 28 January 2026, 49 m away
- [**PA/02093/21** Zabbar](https://propertylist.mt/permit/PA-02093-21/zabbar-sanction-changes-to-internal-layout-from-approved): To sanction changes to internal layout from approved permits PAPB/5273/79 and PA/4123/17, changes to facade and extensions at second/third setback floor… Status being checked, 3 floors plus a receded floor, 52 m away
- [**PA/01549/25** Zabbar](https://propertylist.mt/permit/PA-01549-25/zabbar-demolish-existing-structures): To demolish existing structures, excavate and to construct 2 basement levels of garages/parking, including 47 overlying apartments. Application also consists… Granted, validated 2 April 2025, 69 m away
- [**PA/01214/22** Zabbar](https://propertylist.mt/permit/PA-01214-22/zabbar-internal-alterations-to-existing-residence-and-construction): Internal alterations to existing residence and construction of an additional 4 apartments at first, second and third floor levels. Proposal includes the… Status being checked, 4 floors, 85 m away
- [**PA/01038/26** Zabbar](https://propertylist.mt/permit/PA-01038-26/zabbar-excavation-of-site-to-construct-a-water): Proposed excavation of site to construct a water reservoir and basement garages, with overlying 2 maisonettes, 9 apartments and 2 receded penthouses. Granted, validated 25 February 2026, 3 floors plus a receded floor, 87 m away
- [**PA/00605/20** Zabbar](https://propertylist.mt/permit/PA-00605-20/zabbar-change-of-use-from-garage-to-class): Proposed change of use from garage to Class 4B shop and construction of W.C, fixing of sign, retractable awning, A.C unit and roller shutter in front of shop… Status being checked, 94 m away
- [**PA/03158/21** Zabbar](https://propertylist.mt/permit/PA-03158-21/zabbar-change-of-use-from-garage-to-class): Proposed change of use from garage to Class 4B Shop, formation of w.c./store at back, and fixing of sign with AC louvered enclosure. Status being checked, 104 m away
- [**PA/06490/26** Zabbar](https://propertylist.mt/permit/PA-06490-26/zabbar-perform-internal-alterations-to-existing-dwelling-and): To perform internal alterations to existing dwelling and construct second floor apartment and washroom. Pending, 2 floors, 112 m away
- [**PA/05818/23** Zabbar](https://propertylist.mt/permit/PA-05818-23/zabbar-change-in-activity-within-the-same-commercial): Proposed change in activity within the same commercial class use from Class 4B nail technician shop to Class 4B greengrocer, including changing the shop… Granted, validated 4 October 2023, 115 m away
- [**PA/01149/20** Zabbar](https://propertylist.mt/permit/PA-01149-20/zabbar-amend-use-from-class-4b-grocer-to): Amend use from Class 4B grocer to Class 4B nail technician, changing sign and internal alterations. Status being checked, 117 m away
- [**PA/06421/25** Zabbar](https://propertylist.mt/permit/PA-06421-25/zabbar-change-of-use-from-garage-to-maisonette): Change of use from garage to maisonette and to sanction extension of basement garage covered by PA (Permit PABA/4038/86). Granted, validated 8 October 2025, 128 m away
- [**PA/03978/25** Zabbar](https://propertylist.mt/permit/PA-03978-25/zabbar-sanction-changes-from-pb2750-85-and-internal-and): To sanction changes from PB2750/85 and Internal and external alterations to existing dwelling and addition of 1 apartment at third floor and 1 apartment at… Granted, validated 22 September 2025, 4 floors plus a receded floor, 130 m away
- [**PA/04627/24** Zabbar](https://propertylist.mt/permit/PA-04627-24/zabbar-alterations-at-ground-floor-and-construction-of): Proposed alterations at ground floor and construction of 3 overlying apartments and 1 penthouse. Granted, validated 27 November 2024, 4 floors plus a receded floor, 131 m away
- [**PA/02188/21** Zabbar](https://propertylist.mt/permit/PA-02188-21/zabbar-construction-a-swimming-pool-in-backyard-and): Proposed construction a swimming pool in backyard and to interconnect a private garage with same backyard. Status being checked, 147 m away

## More by Joseph Bondin

- [**PA/07614/26** St Julians](https://propertylist.mt/permit/PA-07614-26/st-julians-changes-in-layout-to-approved-class-3b): Proposed changes in layout to approved Class 3B hotel in PA/2151/23, changes include merging of property to existing hotel approved in PA/6725/20. Proposal… Pending
- [**PA/07580/26** Mosta](https://propertylist.mt/permit/PA-07580-26/mosta-demolition-of-existing-townhouse-and-change-of): Proposed demolition of existing townhouse and change of use from Class 1 residential to construct Class 3A five-storey guesthouse comprising a total of 18… Pending, 5 floors plus a receded floor
- [**PA/07514/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07514-26/san-pawl-il-bahar-change-of-use-at-first-floor-level): Proposed change of use at first floor level from Class 4A offices to Class 2C educational institution for foreign students coming over to Malta for… Pending, validated 28 October 2026
- [**PA/07400/26** Ghaxaq](https://propertylist.mt/permit/PA-07400-26/ghaxaq-demolish-existing-building): To demolish existing building, to excavate 3 basement levels and construct 5 story apartment building with pools at ground floor and roof level. Pending, validated 28 October 2026, 5 floors
- [**PA/07349/26** Birkirkara](https://propertylist.mt/permit/PA-07349-26/birkirkara-alterations-and-correction-of-site-following-survey): Proposed alterations and correction of site following survey as built for levels which have been approved by planning applications PA/2035/20 and PA/4006/22.… Pending, validated 28 October 2026
- [**PA/07300/26** Qormi](https://propertylist.mt/permit/PA-07300-26/qormi-demolition-of-existing-building): Proposed demolition of existing building, excavation of 3 basement levels for parking and construction of six levels building including showroom Class 4B,… Pending, validated 21 October 2026, 6 floors

[All applications by Joseph Bondin](https://propertylist.mt/perit/joseph-bondin)

## More from MNA Property Ltd

- [**PA/07300/26** Qormi](https://propertylist.mt/permit/PA-07300-26/qormi-demolition-of-existing-building): Proposed demolition of existing building, excavation of 3 basement levels for parking and construction of six levels building including showroom Class 4B,… Pending, validated 21 October 2026, 6 floors
- [**PA/07155/26** Zabbar](https://propertylist.mt/permit/PA-07155-26/zabbar-sanctioning-as-built-and-proposed-alterations-from): Proposed sanctioning as built and proposed alterations from approved PA/01351/10 and variations from the official building alignment. Proposed demolition of… Pending, validated 14 October 2026, 4 floors plus a receded floor
- [**PA/06477/26** Mosta](https://propertylist.mt/permit/PA-06477-26/mosta-pool-at-roof-level): Proposed pool at roof level. Pending
- [**PA/06378/26** Zabbar](https://propertylist.mt/permit/PA-06378-26/zabbar-demolish-the-existing-townhouse-and-construct-a): To demolish the existing townhouse and construct a residential building comprising four floors and a total of seven residential units. Pending, validated 23 September 2026, 4 floors
- [**PA/06087/26** Qormi](https://propertylist.mt/permit/PA-06087-26/qormi-part-change-of-use-of-showroom-class): Part change of use of showroom Class 4B to two shops Class 4D food establishment, one fitness studio Class 3C and creating a common access for the overlaying… Pending, validated 2 September 2026
- [**PA/05759/26** Qormi](https://propertylist.mt/permit/PA-05759-26/qormi-excavation-of-the-site-to-the-required): Excavation of the site to the required level and construction of Class 6A at basement, ground, first, second and third floors and parking spaces at fourth… Pending, validated 19 August 2026, 4 floors

[All planning applications in Zabbar](https://propertylist.mt/planning-applications/zabbar)
