---
title: "PA/06990/26: Internal alterations at first floor in Zebbug | PropertyList"
url: https://propertylist.mt/permit/PA-06990-26/zebbug-internal-alterations-at-first-floor
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-02
---

> Pending planning application in Zebbug: Internal alterations at first floor. To demolish the existing washroom at second floor and to propose two apartments…

Planning applications › Zebbug › PA0699026

# PA/06990/26: Internal alterations at first floor in Zebbug

No 3, Our Dream, Triq Patri Andrea Azzopardi Ofm, Zebbug

Internal alterations at first floor. To demolish the existing washroom at second floor and to propose two apartments at second and third floors and a penthouse at roof level.

- **Status:** Pending (Awaiting Recommendation)
- **Location:** No 3, Our Dream, Triq Patri Andrea Azzopardi Ofm, Zebbug
- **Locality:** [Zebbug](https://propertylist.mt/planning-applications/zebbug)
- **Applicant:** [James Micallef](https://propertylist.mt/applicant/james-micallef)
- **Perit:** [Perit Michelle Micallef Bugeja](https://propertylist.mt/perit/michelle-micallef-bugeja)
- **Application type:** Full development permission
- **Zone:** Within Development Zone
- **Type of works:** Demolition
- **Height:** 3 floors plus a receded floor
- **Residential units:** 3
- **Received:** 11 September 2026
- **Validated:** 14 October 2026
- **Published:** 14 October 2026
- **Comments close:** 13 November 2026

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/06990/26)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=06990&caseYear=26)

## Planning activity around No 3, Our Dream, Triq Patri Andrea Azzopardi Ofm, Zebbug

143 other applications within 300 m: 77 granted, 1 refused, 19 pending. 99% of decided applications nearby were granted. Tallest granted nearby: 4 floors (PA/04312/24).

On Triq Patri Andrea Azzopardi Ofm: 1 other application, 0 granted and 0 refused.

Approval estimate for demolition applications like this here: about 95% (likely range 65–100%, low reliability, from 0 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/04448/26** Zebbug](https://propertylist.mt/permit/PA-04448-26/zebbug-excavation-of-site-and-construction-of-1): Proposed excavation of site and construction of 1 basement domestic store, 2 ground floor garages, 2 overlying apartments and 1 duplex apartment. Pending, validated 1 July 2026, 2 floors, 37 m away
- [**PA/00391/26** Zebbug](https://propertylist.mt/permit/PA-00391-26/zebbug-propose-demolition-of-roof-structures-and-construction): To propose demolition of roof structures and construction of penthouse at second floor level. Granted, validated 4 March 2026, 2 floors, 64 m away
- [**PA/02957/21** Zebbug](https://propertylist.mt/permit/PA-02957-21/zebbug-change-of-use-from-class-4b-to): Change of use from Class 4B to Class 1 dwelling including minor internal and external alterations Status being checked, 67 m away
- [**PA/08673/24** Zebbug](https://propertylist.mt/permit/PA-08673-24/zebbug-change-of-use-from-garage-for-private): To change of use from garage for private car to public service garage. Granted, validated 15 January 2025, 68 m away
- [**PA/02888/23** Zebbug](https://propertylist.mt/permit/PA-02888-23/zebbug-sanction-differences-from-pa2859-20): To sanction differences from PA2859/20 (1. differences at washroom level and roof level 2. front elevation parapet wall.) Granted, validated 24 May 2023, 72 m away
- [**PA/00309/20** Zebbug](https://propertylist.mt/permit/PA-00309-20/zebbug-construct-additional-garages-in-garage-drive-approved): To construct additional garages in garage drive approved in PA 957/96, roofing over of garage drive and construction of overlying residential common pool at… Status being checked, 72 m away
- [**PA/03054/26** Zebbug](https://propertylist.mt/permit/PA-03054-26/zebbug-sanction-pa6941-19-for-soffits-as-built): To sanction PA6941/19 for soffits as built. Granted, validated 13 May 2026, 85 m away
- [**PA/02906/26** Zebbug](https://propertylist.mt/permit/PA-02906-26/zebbug-demolition-of-exiting-terraced-housed): Demolition of exiting terraced housed, excavation for the formation of basement and reservoir, construction of basement garage, ground floor maisonette, two… Pending, validated 3 June 2026, 4 floors plus a receded floor, 93 m away
- [**PA/04365/24** Zebbug](https://propertylist.mt/permit/PA-04365-24/zebbug-installation-of-lift-from-ground-floor-to): Proposed installation of lift from ground floor to first floor; and other minor alterations. Granted, validated 28 August 2024, 96 m away
- [**PA/05200/25** Zebbug](https://propertylist.mt/permit/PA-05200-25/zebbug-erect-extension-of-lift-shaft-at-roof): To erect extension of lift shaft at roof level alongside stairwell. Granted, validated 15 September 2025, 107 m away
- [**PA/00714/25** Zebbug](https://propertylist.mt/permit/PA-00714-25/zebbug-variations-from-the-official-building-alignment-for): Variations from the official building alignment for the existing footprint, and sanctioning of existing ground floor garage which was approved as maisonette… Granted, validated 5 February 2025, 122 m away
- [**PA/06284/26** Zebbug](https://propertylist.mt/permit/PA-06284-26/zebbug-extension-and-subdivision-to-existing-townhouse): Extension and subdivision to existing townhouse, proposed excavation and construction of a pool, and introduction of gate to Sqaq Hali. Including the… Pending, validated 16 September 2026, 124 m away
- [**PA/03675/25** Zebbug](https://propertylist.mt/permit/PA-03675-25/zebbug-conversion-of-existing-vacant-residence-into-a): Proposed conversion of existing vacant residence into a Class 3B hotel. Proposed construction of a three storey extension to the existing palazzo and thirteen… Granted, validated 4 June 2025, 131 m away
- [**PA/02723/26** Zebbug](https://propertylist.mt/permit/PA-02723-26/zebbug-demolition): Demolition, alterations and extensions to ground, 1st, 2nd and 3rd floor levels of existing terraced house and garage, and construction of receded floor… Pending, validated 5 August 2026, 4 floors plus a receded floor, 134 m away
- [**PA/04043/23** Zebbug](https://propertylist.mt/permit/PA-04043-23/zebbug-sanction-garage-as-built-due-to-change): To sanction garage as built due to change in site configuration from that approved in PB103/72. Granted, validated 27 September 2023, 139 m away

## More by Michelle Micallef Bugeja

- [**PA/07209/26** Qormi](https://propertylist.mt/permit/PA-07209-26/qormi-sanction-utility-room-and-a-pergola-at): To sanction utility room and a pergola at roof level of a pre-1967 building. Pending, validated 21 October 2026
- [**PA/07041/26** Mosta](https://propertylist.mt/permit/PA-07041-26/mosta-propose-change-of-use-to-approved-permit): To propose change of use to approved permit PA10514/17 at ground floor level from Class 5B to Class 5A. Pending, validated 14 October 2026
- [**PA/06849/26** Rabat](https://propertylist.mt/permit/PA-06849-26/rabat-demolish-existing-dwelling-and-construct-a-new): To demolish existing dwelling and construct a new residential development comprising four (4) garages and five (5) parking spaces at basement level, two (2)… Pending, validated 7 October 2026, 4 floors plus a receded floor
- [**PA/06572/26** Hamrun](https://propertylist.mt/permit/PA-06572-26/hamrun-sanction-property-and-shop): To sanction property and shop (Class 4B) as built to approved permit PB2382/71. Demolition of the existing washroom and utility room at roof level and to… Pending, validated 23 September 2026
- [**PA/05419/26** Marsa](https://propertylist.mt/permit/PA-05419-26/marsa-replacement-of-the-existing-dangerous-slabs-over): Proposed replacement of the existing dangerous slabs over two utility rooms and a bathroom at basement level, in accordance with RG 1252/24. Granted, validated 29 September 2026
- [**PA/04901/26** Gudja](https://propertylist.mt/permit/PA-04901-26/gudja-sanction-penthouse-as-built-to-approved-permit): To sanction penthouse as built to approved permit PA06052/06. To propose internal alterations and construct of a new duplex floor and a pool. Pending, validated 15 July 2026

[All applications by Michelle Micallef Bugeja](https://propertylist.mt/perit/michelle-micallef-bugeja)

## More from James Micallef

- [**PA/04533/25** Qormi](https://propertylist.mt/permit/PA-04533-25/qormi-proposal-includes-sanctioning-of-internal-door-openings): Proposal includes sanctioning of internal door openings at the receded floor level as previously approved in PA/07962/18, together with the proposal of new… Granted, validated 29 July 2025
- [**PA/03183/25** Birkirkara](https://propertylist.mt/permit/PA-03183-25/birkirkara-external-alterations-which-includes): Proposed external alterations which includes, change in facade materials and proposed stepped access within the building line. Granted, validated 20 June 2025
- [**PA/03445/22** Belt Valletta](https://propertylist.mt/permit/PA-03445-22/belt-valletta-minor-internal-alterations): Minor internal alterations. Status being checked

[All planning applications in Zebbug](https://propertylist.mt/planning-applications/zebbug)
