PA/07027/24: internal reconfiguration and extension of the facade in Luqa
Site at, Malta International Airport, Luqa
Proposed internal reconfiguration and extension of the facade.
- Status
- Granted (This application has been approved by Planning Board / Commission.)
- Location
- Site at, Malta International Airport, Luqa
- Locality
- Luqa
- Applicant
- MIA plc Attn: Kevin Alamango
- Perit
- Perit Claire Bezzina
- Application type
- Full development permission - Summary Process
- Zone
- Outside Development Zone
- Type of works
- Alterations & Extensions
- Received
- 6 September 2024
- Validated
- 3 December 2024
- Published
- 16 October 2024
- Comments close
- 31 October 2024
- Decision
- Acceptable
- Permit expires
- 18 December 2029
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around Site at, Malta International Airport, Luqa
No other applications recorded nearby yet.
Approval estimate for alterations & extensions applications like this here: about 95% (likely range 65–100%, low reliability, from 0 comparable decisions nearby). Outside the development zone, where approvals are harder. Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
More by Claire Bezzina
- PA/07413/26 Qrendi: Proposed installation of mobile telephony infrastructure at roof level.
- PA/07199/26 Mellieha: Sanctioning change of use fom gelateria to a kitchen/bar (takeaway) ancillary to the existing hotel, including internal alterations.
- PA/07198/26 St Julians: External alterations to an existing elderly care home ancillary (Class 2A), including reconfiguration of planters and increasing the number of parking spaces.
- PA/06764/26 St Julians: Proposed alterations and extensions at ground and first floor levels to an existing elderly care home (Class 2A) and ancillary facilities; the construction of…
- PA/06475/26 Safi: Proposed substation, switch room and store (ancillary to existing aviation-related structures).
- PA/06241/26 Floriana: Proposed internal alterations and refurbishment of the existing office premises (Class 4A), including the demolition and reconstruction of internal walls,…
All applications by Claire Bezzina
More from MIA plc
- PA/06435/25 Luqa: Upgrade to the airfield electrification and charging network. Works include localized excavation to allow for the construction of 4 in number proposed…
- PA/04865/25 Luqa: Reconfiguration of the main public car park, including the creation of a dedicated y-plate lane, additional car parking spaces, re-organization of the…
- PA/04007/25 Luqa: Proposed east extension to the main passenger terminal to expand the check-in and departures areas, comprising of demolition of existing planters and…
- PA/00155/25 Luqa: Sanctioning of receded parapet wall at roof level and 3m chainlink fence at ground floor with a different layout from that approved in PA/02847/21, including…
- PA/08066/24 Luqa: Change of use of Verani premises within the departures lounge from Class 4C to Class 4D.
- PA/07291/24 Luqa: Installation of photovoltaic panels infrastructure and construction of a sub-station with a different layout from that approved in permission PA/00355/19, the…