---
title: "PA/07029/26: Construction of 29 residential units and underlying in San Pawl il-Bahar |…"
url: https://propertylist.mt/permit/PA-07029-26/san-pawl-il-bahar-construction-of-29-residential-units-and-underlying
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-03
---

> Pending planning application in San Pawl il-Bahar: Construction of 29 residential units and underlying basement garages. Alterations to approved drawings…

Planning applications › San Pawl il-Bahar › PA0702926

# PA/07029/26: Construction of 29 residential units and underlying in San Pawl il-Bahar

Vacant Site, adjacent to 'The Peak', Triq San Massimiljanu Kolbe c/w, Triq il-Porzjunkula, Triq Gdida Fi, Qawra, San Pawl il-Bahar

Construction of 29 residential units and underlying basement garages. Alterations to approved drawings and addition of 2 Class 4B shops.

- **Status:** Pending (Awaiting Recommendation)
- **Location:** Vacant Site, adjacent to 'The Peak', Triq San Massimiljanu Kolbe c/w, Triq il-Porzjunkula, Triq Gdida Fi, Qawra, San Pawl il-Bahar
- **Locality:** [San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)
- **Applicant:** [MA Developments Ltd Attn: Mariella Axisa](https://propertylist.mt/applicant/ma-developments-ltd)
- **Perit:** [Perit Mario Axisa](https://propertylist.mt/perit/mario-axisa)
- **Application type:** Full development permission
- **Zone:** Within Development Zone
- **Type of works:** New Construction (Residential)
- **Residential units:** 29
- **Received:** 28 August 2026
- **Validated:** 14 October 2026
- **Published:** 14 October 2026
- **Comments close:** 13 November 2026

The public planning file has 31 documents: plans, reports, consultations and the decision.

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/07029/26)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=07029&caseYear=26)

## Planning activity around Vacant Site, adjacent to 'The Peak', Triq San Massimiljanu Kolbe c/w, Triq il-Porzjunkula, Triq Gdida Fi, Qawra, San Pawl il-Bahar

151 other applications within 300 m: 94 granted, 3 refused, 15 pending. 97% of decided applications nearby were granted. Tallest granted nearby: 8 floors (PA/02706/25).

On Triq San Massimiljanu Kolbe: 12 other applications, 8 granted and 1 refused; granted buildings are typically 8 floors, the tallest 8.

Approval estimate for new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 14 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/00014/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00014-25/san-pawl-il-bahar-sanction-internal-alterations-and-changes-to-facade): To sanction internal alterations and changes to facade from PA/3228/17. Proposal to change one-bedroom at fifth floor to a two-bedroom and to split approved… Granted, validated 26 February 2025, 17 m away
- [**PA/02183/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02183-23/san-pawl-il-bahar-sanction-third-floor-flat): To sanction third floor flat (Flat 5) as built including internal and external variations from PB2799/91. Granted, validated 11 May 2023, 17 m away
- [**PA/01208/21** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01208-21/san-pawl-il-bahar-change-of-use-from-garage-to-childcare): Change of use from garage to childcare (Class 2C) and carry out minor internal alterations and installation of sign Status being checked, 26 m away
- [**PA/07197/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07197-23/san-pawl-il-bahar-alterations-to-existing-maisonette-including-the-rem): Proposed alterations to existing maisonette including the removal of access from the common area to have a private entrance. The application is also intended… Granted, validated 9 February 2024, 33 m away
- [**PA/04100/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04100-26/san-pawl-il-bahar-sanction-apartment-as-built): To sanction apartment as built (originally approved by virtue of PA1960/06), including change in site configuration, minor internal alterations and change in… Granted, validated 17 June 2026, 34 m away
- [**PA/02250/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02250-25/san-pawl-il-bahar-sanctioning-of-apartment-as-built-from-pa-01545-08): Proposed sanctioning of apartment as built from PA/01545/08 including variations from the official building alignments. Granted, validated 9 April 2025, 36 m away
- [**PA/08315/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-08315-25/san-pawl-il-bahar-sanction-garage-as-built-within-development-construc): To sanction garage as built within development constructed with permit no: PA/1960/06. Granted, validated 26 January 2026, 37 m away
- [**PA/02706/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02706-25/san-pawl-il-bahar-demolition-of-sixth-floor-apartment-and-construction): Demolition of sixth floor apartment and construction of three new apartments and extension at seventh floor level including two apartments with pools. Granted, validated 23 April 2025, 8 floors, 40 m away
- [**PA/05938/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05938-24/san-pawl-il-bahar-extension-to-the-existing-receded-floor-creating): Extension to the existing receded floor creating a three bedroom apartment and the construction of an overlying two bedroom receded floor and jacuzzi. Granted, validated 18 September 2024, 41 m away
- [**PA/01995/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01995-26/san-pawl-il-bahar-change-of-use-from-garage-as-approved): Change of use from garage as approved in PA/05359/02 to Class 4B shop, including proposed fascia sign and internal alterations. Granted, validated 25 March 2026, 43 m away
- [**PA/00590/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00590-23/san-pawl-il-bahar-renewal-to-pa-06699-17-proposed-change-of): Renewal to PA/06699/17 - Proposed change of use from garage to Class 4B shop, proposed shop sign and proposed extension to property. Granted, validated 8 March 2023, 43 m away
- [**PA/06465/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06465-25/san-pawl-il-bahar-extension-of-building-and-construction-of-3): Proposed extension of building and construction of 3 apartments from fourth floor level upwards. Granted, validated 15 October 2025, 44 m away
- [**PA/06219/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06219-25/san-pawl-il-bahar-extension-of-building-and-construction-of-3): Proposed extension of building and construction of 3 apartments from fourth floor level upwards. Granted, validated 1 October 2025, 44 m away
- [**PA/02426/22** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02426-22/san-pawl-il-bahar-sanction-changes-from-pa7881-06): To sanction changes from PA7881/06. Status being checked, 44 m away
- [**PA/02565/21** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02565-21/san-pawl-il-bahar-change-of-use-from-garage-to-class): Change of use from garage to Class 4B convenience shop, including the installation of signage on the facade. Status being checked, 44 m away

## More by Mario Axisa

- [**PA/07506/26** Santa Venera](https://propertylist.mt/permit/PA-07506-26/santa-venera-change-of-use-from-class-4a-to): Change of use from Class 4A to Class 4B. Proposal includes lowering of internal floor, fixing of sign and proposed alterations and extensions to PA/01247/25. Pending, validated 28 October 2026
- [**PA/07405/26** Santa Venera](https://propertylist.mt/permit/PA-07405-26/santa-venera-renewal-of-pa968-18): Renewal of PA968/18. Construction of 4 residential units, office, 2 Class 4B shops and underlying garages. Pending
- [**PA/01026/26** Birkirkara](https://propertylist.mt/permit/PA-01026-26/birkirkara-construction-of-steel-canopy-at-roof-level): Construction of steel canopy at roof level. Granted, validated 6 April 2026
- [**PA/06380/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06380-25/san-pawl-il-bahar-construction-of-2-levels-of-basement-garages): Construction of 2 levels of basement garages (accessible from adjacent basements approved in PA6719/21) and 29 in number residential units. Application… Granted, validated 1 October 2025, 1 floor
- [**PA/08205/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-08205-24/san-pawl-il-bahar-renewal-of-pa5668-16): Renewal of PA5668/16. Construction of 30 garages, 4 maisonettes, 36 apartments and 4 penthouses. Granted, validated 27 January 2025
- [**PA/06714/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06714-24/san-pawl-il-bahar-change-of-use-from-store-to-garage): Change of use from store to garage. Granted, validated 9 October 2024

[All applications by Mario Axisa](https://propertylist.mt/perit/mario-axisa)

## More from MA Developments Ltd

- [**PA/08205/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-08205-24/san-pawl-il-bahar-renewal-of-pa5668-16): Renewal of PA5668/16. Construction of 30 garages, 4 maisonettes, 36 apartments and 4 penthouses. Granted, validated 27 January 2025
- [**PA/00917/22** Mellieha](https://propertylist.mt/permit/PA-00917-22/mellieha-excavation-and-construction-of-two-level-basement): Excavation and construction of two level basement garages, two maisonettes at ground floor level and four overlying levels consisting of eight apartments. Status being checked, 5 floors

[All planning applications in San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)
