---
title: "PA/07228/26: demolish existing villa and construct new villa in Attard | PropertyList"
url: https://propertylist.mt/permit/PA-07228-26/attard-demolish-existing-villa-and-construct-new-villa
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-02
---

> Pending planning application in Attard: To demolish existing villa and construct new villa with different design, including swimming pool. Perit Andre…

Planning applications › Attard › PA0722826

# PA/07228/26: demolish existing villa and construct new villa in Attard

8, Triq Lord Strickland, Attard

To demolish existing villa and construct new villa with different design, including swimming pool.

- **Status:** Pending (Awaiting Recommendation)
- **Location:** 8, Triq Lord Strickland, Attard
- **Locality:** [Attard](https://propertylist.mt/planning-applications/attard)
- **Applicant:** Ryan Mahoney
- **Perit:** [Perit Andre Pizzuto](https://propertylist.mt/perit/andre-pizzuto)
- **Application type:** Full development permission
- **Zone:** Within Development Zone
- **Type of works:** Demolition & New Construction (Residential)
- **Residential units:** 1
- **Received:** 31 July 2026
- **Validated:** 21 October 2026
- **Published:** 21 October 2026
- **Comments close:** 20 November 2026

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/07228/26)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=07228&caseYear=26)

## Planning activity around 8, Triq Lord Strickland, Attard

37 other applications within 300 m: 18 granted, 0 refused, 4 pending. 100% of decided applications nearby were granted. Tallest granted nearby: 3 floors (PA/02032/24).

On Triq Lord Strickland: 1 other application, 1 granted and 0 refused.

Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 2 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/00171/24** Attard](https://propertylist.mt/permit/PA-00171-24/attard-sanction-existing-lpg-tank-in-front-garden): To sanction existing LPG tank in front garden area and changes to facade and front garden area from approved permit DN995/08. Granted, validated 17 January 2024, 29 m away
- [**PA/07227/26** Attard](https://propertylist.mt/permit/PA-07227-26/attard-internal-alterations): Internal alterations, addition of pool in garden and interconnecting staircase to below garage, and sanctioning of minor as built changes from PA/03811/04. Pending, validated 21 October 2026, 86 m away
- [**PA/07539/23** Attard](https://propertylist.mt/permit/PA-07539-23/attard-objective-of-this-application-is-to-replace): The objective of this application is to replace the existing conservatory and bird cage structures whilst still retaining their original use. Granted, validated 12 June 2024, 117 m away
- [**PA/03322/21** Attard](https://propertylist.mt/permit/PA-03322-21/attard-restoration-of-the-elevations-of-the-main): Restoration of the elevations of the main courtyard Status being checked, 129 m away
- [**PA/00516/22** Attard](https://propertylist.mt/permit/PA-00516-22/attard-extension-to-an-existing-semi-detached-villa): Extension to an existing semi-detached villa. Extension consists of the development of the back part at first floor. Proposal includes changes to the… Status being checked, 133 m away
- [**PA/00464/23** Attard](https://propertylist.mt/permit/PA-00464-23/attard-restoration-and-partial-reconstruction-of-boundary-walls): Restoration and partial reconstruction of boundary walls. Granted, validated 8 March 2023, 142 m away
- [**PA/02065/22** Attard](https://propertylist.mt/permit/PA-02065-22/attard-minor-internal-and-external-alterations-to-existing): Minor internal and external alterations to existing Class 4D restaurant, including change of use from terraces to outdoor dining area and proposed fire escape… Status being checked, 213 m away
- [**PA/04877/25** Attard](https://propertylist.mt/permit/PA-04877-25/attard-installation-of-signage): Installation of signage. Granted, validated 11 August 2025, 214 m away
- [**PA/06387/24** Attard](https://propertylist.mt/permit/PA-06387-24/attard-additions-and-alterations-including-construction-of-additional): Additions and alterations including construction of additional floors to existing hotel (Class 3B). Withdrawn, validated 25 September 2024, 214 m away
- [**PA/01198/23** Attard](https://propertylist.mt/permit/PA-01198-23/attard-minor-external-alterations-to-the-existing-class): Proposed minor external alterations to the existing Class 4D restaurant, including restoration of façade. Granted, validated 8 March 2023, 214 m away
- [**PA/02626/21** Balzan](https://propertylist.mt/permit/PA-02626-21/balzan-internal-alterations-to-office-1-and-to): Proposed internal alterations to office 1 and to the common parts of the apartments including change of use from domestic store to archive. Status being checked, 226 m away
- [**PA/07310/25** Attard](https://propertylist.mt/permit/PA-07310-25/attard-sanction-changes-from-the-approved-pa-3642-09-permit): To sanction changes from the approved PA/3642/09 permit, including the introduction of store; a generator room and fuel tank storage; and the addition of a… Pending, validated 12 November 2025, 2 floors, 236 m away
- [**PA/05466/25** Balzan](https://propertylist.mt/permit/PA-05466-25/balzan-excavation-of-a-lift-pit-and-installation): Excavation of a lift pit and installation of passenger lift to existing pre-1967 dwelling and including minor modifications to two façade windows to… Granted, validated 27 August 2025, 237 m away
- [**PA/02168/22** Balzan](https://propertylist.mt/permit/PA-02168-22/balzan-extension-to-footprint-previously-approved-in-pa-03985-21): Proposed extension to footprint previously approved in PA/03985/21, to create a 3 bedroom apartment. Status being checked, 237 m away
- [**PA/02410/23** Balzan](https://propertylist.mt/permit/PA-02410-23/balzan-renewal-of-pa5360-17-alterations-and-extension): Renewal of PA5360/17 - Alterations and extension to residential premises adding an additional floor, new pool, staircase and passenger lift. Granted, validated 4 October 2023, 242 m away

## More by Andre Pizzuto

- [**PA/07364/26** Zabbar](https://propertylist.mt/permit/PA-07364-26/zabbar-sanction-removal-of-loose-material-and-creation): To sanction removal of loose material and creation of new basement level, and minor alterations to internal layout and facade as approved in PA/08346/21. Pending
- [**PA/07305/26** Qormi](https://propertylist.mt/permit/PA-07305-26/qormi-renewal-of-development-permit-pa-07554-17-to-amend): Renewal of development permit PA/07554/17: To amend development permit PA/02417/12. Changes include creation of internal courtyard, intermediate floor,… Pending
- [**PA/06669/26** Sliema](https://propertylist.mt/permit/PA-06669-26/sliema-replacement-of-external-timber-apertures-with-new): Replacement of external timber apertures with new in pvc timber-like apertures in similar style. Pending
- [**PA/05114/26** Gzira](https://propertylist.mt/permit/PA-05114-26/gzira-renewal-of-development-permit-pa-08172-17-to-extend): Renewal of development permit PA/08172/17: To extend penthouse and construct two additional one-bedroom apartments in setback floor. Granted, validated 17 September 2026
- [**PA/03896/26** Rabat](https://propertylist.mt/permit/PA-03896-26/rabat-change-use-of-stables-approved-in-pa-04353-19): To change use of stables approved in PA/04353/19 to agricultural stores, including external and internal alterations, and correction of site measurements… Suspended, validated 10 June 2026
- [**PA/03642/26** Zabbar](https://propertylist.mt/permit/PA-03642-26/zabbar-renewal-of-development-permit-pa-00370-15-to-change): Renewal of development permit PA/00370/15: To change use class of catering establishment from Class 4C to Class 4D and carry out alterations in elevation and… Granted, validated 30 June 2026

[All applications by Andre Pizzuto](https://propertylist.mt/perit/andre-pizzuto)

[All planning applications in Attard](https://propertylist.mt/planning-applications/attard)
