> Granted planning application in Rabat (Gozo): To demolish existing first floor level. To propose variations to the approved first and second floor levels…

Planning applications › Rabat (Gozo) › PA0730323

# PA/07303/23: demolish existing first floor level in Rabat (Gozo)

Zahra, Triq Fortunato Mizzi, Rabat (Gozo)

To demolish existing first floor level. To propose variations to the approved first and second floor levels having PA362/23 and change of use from offices to one Class 4B showroom at first and second floor level and to construct two additional floors consisting of two, Class 4A office spaces at third and recessed floor level.

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** Zahra, Triq Fortunato Mizzi, Rabat (Gozo)
- **Locality:** [Rabat (Gozo)](https://propertylist.mt/planning-applications/rabat-gozo)
- **Applicant:** [Sylvianne Zahra](https://propertylist.mt/applicant/sylvianne-zahra)
- **Perit:** [JD Periti](https://propertylist.mt/perit/jd-periti)
- **Application type:** Full development permission
- **Zone:** Within Development Zone
- **Type of works:** Demolition & New Construction (Commercial)
- **Height:** 4 floors plus a receded floor
- **Received:** 29 August 2023
- **Validated:** 6 December 2023
- **Published:** 6 December 2023
- **Comments close:** 15 January 2024
- **Recommendation:** Grant Permission
- **Decision:** Grant Permission
- **Decision date:** 8 November 2024
- **Permit expires:** 20 November 2029

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/07303/23)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=07303&caseYear=23)

## Planning activity around Zahra, Triq Fortunato Mizzi, Rabat (Gozo)

110 other applications within 300 m: 72 granted, 1 refused, 12 pending. 99% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/06575/24).

On Triq Fortunato Mizzi: 26 other applications, 14 granted and 0 refused; granted buildings are typically 4 floors, the tallest 5. Periti active on this street: [Alexander Bigeni](https://propertylist.mt/perit/alexander-bigeni), [John Saliba](https://propertylist.mt/perit/john-saliba), [Annamaria Attard Montalto](https://propertylist.mt/perit/annamaria-attard-montalto), [Emanuel Vella](https://propertylist.mt/perit/emanuel-vella), [Mariella Xuereb](https://propertylist.mt/perit/mariella-xuereb).

Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 5 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/01932/22** Rabat (Gozo)](https://propertylist.mt/permit/PA-01932-22/rabat-gozo-minor-internal-alterations-at-ground): Minor internal alterations at ground, first and second floor, including relocation of w.c. facilities and re-organisation of the circulation spaces, including… Status being checked, 31 m away
- [**PA/05041/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-05041-26/rabat-gozo-variations-from-the-official-building-alignment): Variations from the official building alignment. Pending, validated 22 July 2026, 32 m away
- [**PA/06005/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-06005-24/rabat-gozo-change-of-use-from-existing-garage-to): Change of use from existing garage to Class 4C. Proposal includes the fixing of a sign. Granted, validated 18 September 2024, 55 m away
- [**PA/04471/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-04471-24/rabat-gozo-sanction-the-carrying-out-of-internal-alterations): To sanction the carrying out of internal alterations to the Class 4A offices at third-floor level and the construction of a store at receded floor level. Granted, validated 17 July 2024, 57 m away
- [**PA/00362/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-00362-23/rabat-gozo-renewal-to-pa6534-17-to-renew-permission): Renewal to PA6534/17 - To renew permission PA954/12: Change of use of existing first floor maisonette to offices and construction of additional offices at… Granted, validated 30 March 2023, 3 floors, 61 m away
- [**PA/05518/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-05518-24/rabat-gozo-include-mini-market-and-butcher-to-approved): To include mini market and butcher to approved Class 4B and part change of use to Class 4C. Correction of levels of both shops. Pending, validated 28 August 2024, 64 m away
- [**PA/01267/22** Rabat (Gozo)](https://propertylist.mt/permit/PA-01267-22/rabat-gozo-development-of-existing-airspace): Development of existing airspace, at second and third floor, into duplex three bedroomed unit and sanctioning of minor internal deviations at first floor when… Status being checked, 4 floors, 64 m away
- [**PA/02985/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-02985-26/rabat-gozo-demolish-existing-building-and-to-construct-a): To demolish existing building and to construct a Class 4B (retail) at ground and mezzanin level, Class 4A offices from first to receded floor and garages and… Granted, validated 6 May 2026, 66 m away
- [**PA/02145/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-02145-23/rabat-gozo-alterations-and-change-in-use-of-store): Alterations and change in use of store and catering establishment into retail (Class 4B) unit and a beautician/hairdresser (Class 4B) unit including… Granted, validated 19 April 2023, 66 m away
- [**PA/06676/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-06676-23/rabat-gozo-demolition-of-existing-elevated-maisonettes): Proposed demolition of existing elevated maisonettes, shop on the ground floor, and basement. Construction of Class 4D restaurant at basement and ground floor… Granted, validated 15 November 2023, 72 m away
- [**PA/04103/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-04103-26/rabat-gozo-carry-out-changes-to-building-approved-in): To carry out changes to building approved in PA/06676/23 (not yet built). To construct a hotel (Class 3B) including ancillary restaurant (Class 4D), breakfast… Pending, validated 17 June 2026, 73 m away
- [**PA/05829/25** Rabat (Gozo)](https://propertylist.mt/permit/PA-05829-25/rabat-gozo-sanction-variations-from-pa7010-98-and-pb3120-65-namely): To sanction variations from PA7010/98 and PB3120/65 namely addition of basement and extension at the back of first floor and change of use of car service area… Granted, validated 10 September 2025, 73 m away
- [**PA/04420/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-04420-23/rabat-gozo-renew-pa-02101-18-to-demolish-existing-roof): To renew PA/02101/18 - To demolish existing roof structure and to construct offices (Class 4A) at third floor level and at receded floor level on existing. Granted, validated 5 September 2023, 3 floors plus a receded floor, 74 m away
- [**PA/00773/21** Rabat (Gozo)](https://propertylist.mt/permit/PA-00773-21/rabat-gozo-construct-study-at-third-floor-flat-and): To construct study at third floor flat and minor internal alterations. Status being checked, 81 m away
- [**PA/05998/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-05998-23/rabat-gozo-demolish-existing-showroom-and-offices): To demolish existing showroom and offices, to excavate site and to construct shop (Class 4B), to construct 4 residential units and a commercial store at… Granted, validated 11 October 2023, 85 m away

## More by JD Periti

- [**PA/07216/26** Ghajnsielem](https://propertylist.mt/permit/PA-07216-26/ghajnsielem-change-of-use-from-existing-garage-to): Proposed change of use from existing garage to Class 4B barber shop, including minor internal alterations and changing garage door to shop front including sign. Pending, validated 21 October 2026
- [**PA/06753/26** Ghajnsielem](https://propertylist.mt/permit/PA-06753-26/ghajnsielem-sanction-minor-changes-from-that-approved-in): To sanction minor changes from that approved in RG/01057/21. The changes include the sanctioning of an existing window in the ensuite at first floor level and… Pending
- [**PA/06273/26** Qormi](https://propertylist.mt/permit/PA-06273-26/qormi-construct-pool-and-ancillary-pump-room-with): To construct pool and ancillary pump room with apartments approved in PA/7787/24. Pending, validated 16 September 2026
- [**PA/04317/26** Ghajnsielem](https://propertylist.mt/permit/PA-04317-26/ghajnsielem-sanction-apartment-as-built-with-minor-variations): To sanction apartment as built with minor variations from that approved in PB1274/91 and proposed widening of door leading to front balcony. Granted, validated 24 June 2026
- [**PA/03492/26** Nadur](https://propertylist.mt/permit/PA-03492-26/nadur-sanction-minor-internal-changes-from-that-previously): To sanction minor internal changes from that previously approved in PA/2458/10 and PA/5583/06. To propose minor internal alterations which include extending… Granted, validated 3 June 2026
- [**PA/03311/26** Xewkija](https://propertylist.mt/permit/PA-03311-26/xewkija-sanction-division-of-pre-1968-structure-into-two): To sanction division of pre-1968 structure into two separate dwellings. Granted, validated 20 May 2026

[All applications by JD Periti](https://propertylist.mt/perit/jd-periti)

## More from Sylvianne Zahra

- [**PA/02574/26** Gharb](https://propertylist.mt/permit/PA-02574-26/gharb-sanction-differences-from-pa03252-21-including-an-indoor): To sanction differences from PA03252/21 including an indoor pool at basement level and proposed change in facade material. Granted, validated 22 April 2026
- [**PA/01838/23** Gharb](https://propertylist.mt/permit/PA-01838-23/gharb-additions-and-alterations-to-existing-house-having): Additions and alterations to existing house having PA/4103/05. Granted, validated 5 April 2023

[All planning applications in Rabat (Gozo)](https://propertylist.mt/planning-applications/rabat-gozo)