propertylist

PA/07332/26: Demolition of existing property in Marsa

13, St. Anthony, Triq il-Qaddiefa c/w, Triq San Piju ta' Pietrelcina, Marsa

Demolition of existing property, excavation of plot and construction of a hotel Class 3B from first floor upwards, a spa and an indoor pool at basement level, and a pool on the on the terrace.

Status
Pending (Awaiting Recommendation)
Location
13, St. Anthony, Triq il-Qaddiefa c/w, Triq San Piju ta' Pietrelcina, Marsa
Locality
Marsa
Applicant
Mr. Clayton Formosa
Perit
Perit Maria Schembri Grima
Application type
Full development permission
Zone
Within Development Zone
Type of works
Demolition & New Construction
Received
3 August 2026
Validated
28 October 2026
Published
28 October 2026
Comments close
27 November 2026

The public planning file has 29 documents: plans, reports, consultations and the decision.

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around 13, St. Anthony, Triq il-Qaddiefa c/w, Triq San Piju ta' Pietrelcina, Marsa

133 other applications within 300 m: 81 granted, 1 refused, 16 pending. 99% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/01090/25).

On Triq il-Qaddiefa: 1 other application, 1 granted and 0 refused.

Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 9 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Maria Schembri Grima

All applications by Maria Schembri Grima

All planning applications in Marsa