PA/07391/24: Minor changes from PA08268/18 and removal of in Swieqi
78, 80, 82, 86, Triq il-Qasam, Swieqi
Minor changes from PA08268/18 and removal of basement garages due to site restrictions.
- Status
- Withdrawn (This application for development permission has been withdrawn by the applicant.)
- Location
- 78, 80, 82, 86, Triq il-Qasam, Swieqi
- Locality
- Swieqi
- Applicant
- Stephen Aquilina
- Perit
- Perit Kurt Camilleri Burlo'
- Application type
- Full development permission
- Zone
- Within Development Zone
- Type of works
- Minor
- Received
- 29 August 2024
- Published
- 30 October 2024
- Comments close
- 14 November 2024
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around 78, 80, 82, 86, Triq il-Qasam, Swieqi
146 other applications within 300 m: 79 granted, 4 refused, 22 pending. 95% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/00057/25).
On Triq il-Qasam: 38 other applications, 18 granted and 1 refused; granted buildings are typically 4 floors, the tallest 4. Periti active on this street: Samuel Formosa, Colin Zammit, Nicholas Psaila-Savona, David Vassallo, Innovative Design Architects (iDA).
- PA/07585/26 Swieqi: Sanctioning of existing building at first floor and proposed minor alterations at first floor level, including the addition of a lift and common staircase…
- PA/06889/23 Swieqi: Change of use from Class 4A office to Class 4B shop and placing of sign.
- PA/02084/26 Swieqi: Proposed demolition and reconstruction of common area stairs to include lift, proposed construction of two apartments at second floor, two receded apartments…
- PA/02000/22 Swieqi: Change of use at ground floor level of part of approved mini market (covered by RG01490/17) to cafeteria (Class 4C). Application also include minor internal…
- PA/00503/25 Swieqi: Proposed alterations at third floor level covered by permit PA5879/20 and proposed additional unit at receded floor level.
- PA/05251/24 Swieqi: Proposed change of use from garage to Class 4B shop, & proposed fixing of signage.
- PA/05400/26 Swieqi: Demolition of existing staircase and one-car garage at ground floor and of first floor level; reconstruction of common parts including construction of a…
- PA/02660/21 Swieqi: Proposed formation of apartment at second floor level and construction of overlying apartments at third floor and at receded floor level. Proposal includes…
- PA/00652/20 Swieqi: Partial change of use from approved PA10774/18 from residential (Class 1) and clinic (Class 2A) to financial, professional services including doctors, lawyers…
- PA/03684/23 Swieqi: Minor alteration to existing apartment and construction of residential unit at second floor, third floor and setback floor levels [addition of three…
- PA/04030/24 Swieqi: To propose the installation of travertine cladding on the facade and minor internal alterations at first floor level. Also, to sanction the construction of…
- PA/00567/20 Swieqi: To construct third floor apartment.
- PA/07098/25 Swieqi: To sanction minor alterations to the approved floor layout, as well as to carry out alterations to facilitate the change of use from approved office Class 4A…
- PA/04219/24 Swieqi: Proposed change of use of existing Class 1 residential dwelling into a Class 4B shop. The proposal includes the installation of a sign and minor internal and…
- PA/03375/23 Swieqi: Subdivision of duplex first and second floor apartments into 2 two bedroom units.
More by Kurt Camilleri Burlo'
- PA/07423/26 Zebbug: To sanction correction to site boundary wall and pavement alignment approved in PA1292/19 and addition of planter.
- PA/06522/26 Santa Venera: Demolition of apartment and construction of two 3-bed flats and one penthouse and construction of lift.
- PA/05168/26 Kirkop: Demolition of existing terraced house, excavation and construction of 3 lock up garages, one three-bed maisonette, six two bed flats and one three bed…
- PA/04637/26 Balzan: Changes to lift shaft size approved in PA6791/24 and construction of washroom and addition of steel railings at roof level.
- PA/04196/26 Marsa: Change of use from ancillary stores to jockey restrooms.
- PA/03999/26 Sliema: Replacement of closed Timber balcony with pvc material, minor internal changes and sanctioning of awning at roof level.