propertylist

PA/07414/26: construction of four overlying floors with 6 in San Pawl il-Bahar

C&G Mansions, Airspace, Triq il-Mosta c/w, Triq il-Kahli, San Pawl il-Bahar

Proposed construction of four overlying floors with 6 apartments per floor and three penthouses at setback floor level.

Status
Pending (Awaiting Recommendation)
Location
C&G Mansions, Airspace, Triq il-Mosta c/w, Triq il-Kahli, San Pawl il-Bahar
Locality
San Pawl il-Bahar
Applicant
Jeremy Muscat
Perit
Perit Michael Anastasi
Application type
Full development permission
Zone
Within Development Zone
Type of works
New Construction (Residential)
Residential units
27
Received
25 September 2026
Validated
28 October 2026
Published
28 October 2026
Comments close
27 November 2026

The public planning file has 27 documents: plans, reports, consultations and the decision.

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around C&G Mansions, Airspace, Triq il-Mosta c/w, Triq il-Kahli, San Pawl il-Bahar

200 other applications within 300 m: 114 granted, 11 refused, 26 pending. 91% of decided applications nearby were granted. Tallest granted nearby: 8 floors (PA/05349/23).

On Triq il-Mosta: 19 other applications, 8 granted and 2 refused; granted buildings are typically 6 floors, the tallest 7. Periti active on this street: Henry Attard, Jean Pierre Attard, Gilbert Bartolo.

Approval estimate for new construction applications like this here: about 93% (likely range 63–100%, low reliability, from 13 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Michael Anastasi

All applications by Michael Anastasi

More from Jeremy Muscat

All planning applications in San Pawl il-Bahar