---
title: "PA/07414/26: construction of four overlying floors with 6 in San Pawl il-Bahar | PropertyList"
url: https://propertylist.mt/permit/PA-07414-26/san-pawl-il-bahar-construction-of-four-overlying-floors-with-6
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-03
---

> Pending planning application in San Pawl il-Bahar: Proposed construction of four overlying floors with 6 apartments per floor and three penthouses at…

Planning applications › San Pawl il-Bahar › PA0741426

# PA/07414/26: construction of four overlying floors with 6 in San Pawl il-Bahar

C&G Mansions, Airspace, Triq il-Mosta c/w, Triq il-Kahli, San Pawl il-Bahar

Proposed construction of four overlying floors with 6 apartments per floor and three penthouses at setback floor level.

- **Status:** Pending (Awaiting Recommendation)
- **Location:** C&G Mansions, Airspace, Triq il-Mosta c/w, Triq il-Kahli, San Pawl il-Bahar
- **Locality:** [San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)
- **Applicant:** [Jeremy Muscat](https://propertylist.mt/applicant/jeremy-muscat)
- **Perit:** [Perit Michael Anastasi](https://propertylist.mt/perit/michael-anastasi)
- **Application type:** Full development permission
- **Zone:** Within Development Zone
- **Type of works:** New Construction (Residential)
- **Residential units:** 27
- **Received:** 25 September 2026
- **Validated:** 28 October 2026
- **Published:** 28 October 2026
- **Comments close:** 27 November 2026

The public planning file has 27 documents: plans, reports, consultations and the decision.

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/07414/26)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=07414&caseYear=26)

## Planning activity around C&G Mansions, Airspace, Triq il-Mosta c/w, Triq il-Kahli, San Pawl il-Bahar

200 other applications within 300 m: 114 granted, 11 refused, 26 pending. 91% of decided applications nearby were granted. Tallest granted nearby: 8 floors (PA/05349/23).

On Triq il-Mosta: 19 other applications, 8 granted and 2 refused; granted buildings are typically 6 floors, the tallest 7. Periti active on this street: [Henry Attard](https://propertylist.mt/perit/henry-attard), [Jean Pierre Attard](https://propertylist.mt/perit/jean-pierre-attard), [Gilbert Bartolo](https://propertylist.mt/perit/gilbert-bartolo).

Approval estimate for new construction applications like this here: about 93% (likely range 63–100%, low reliability, from 13 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/01336/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01336-26/san-pawl-il-bahar-minor-internal-and-external-alterations-and-construc): Minor internal and external alterations and construction of airspace to an existing pre-1967 first floor maisonette to erect 5 in no. one bedroom apartments… Suspended, validated 22 April 2026, 7 floors, 17 m away
- [**PA/02958/21** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02958-21/san-pawl-il-bahar-sanctioning-of-area-for-tables-and-chairs): Sanctioning of area for tables and chairs, installation of umbrellas, proposed areas for tables and chairs. Status being checked, 23 m away
- [**PA/05990/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05990-24/san-pawl-il-bahar-sanction-existing-property-as-built): To sanction existing property as built, shop sign and retractable canopy, change of use from Class 4B to part pastizzeria and takeaway. Pending, validated 11 September 2024, 27 m away
- [**PA/04851/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04851-23/san-pawl-il-bahar-demolition-of-property-at-first-floor): Demolition of property at first floor. To construct apartments at first, second, third, fourth, fifth and sixth floor (9 units) and penthouse at setback floor… Granted, validated 6 October 2023, 6 floors plus a receded floor, 35 m away
- [**PA/03588/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03588-25/san-pawl-il-bahar-demolish-site-in-two-phases): To demolish site in two phases, excavate for foundations and proposed extension to Class 4D restaurant approved in PA/04429/08. Proposal also includes… Pending, validated 4 June 2025, 36 m away
- [**PA/02852/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02852-23/san-pawl-il-bahar-internal-and-external-alterations): Proposed internal and external alterations. Proposed extension at fourth floor and construction of another floor. Granted, validated 5 July 2023, 48 m away
- [**PA/06405/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06405-23/san-pawl-il-bahar-propose-an-extension-over-an-existing-two): To propose an extension over an existing two block of apartments. One block is proposed to be extended by 3 floors and a setback floor and the other by 2… Granted, validated 1 November 2023, 50 m away
- [**PA/03243/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03243-25/san-pawl-il-bahar-sanction-existing-apartment): To sanction existing apartment Granted, validated 22 August 2025, 62 m away
- [**PA/07680/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07680-23/san-pawl-il-bahar-sanction-existing-apartment-approved-in-pa-6221-19): To sanction existing apartment approved in PA/6221/19. Granted, validated 3 January 2024, 64 m away
- [**PA/00396/21** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00396-21/san-pawl-il-bahar-sanctioning-of-differences-to-pa-01368-19-including): Sanctioning of differences to PA/01368/19 including minor internal changes, and the extension of common corridor at penthouse level between common parts and… Status being checked, 65 m away
- [**PA/06286/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06286-24/san-pawl-il-bahar-change-of-use-class-from-4b-retail): Change of use Class from 4B retail (general) to Class 4B mini-market/green-grocer. Granted, validated 18 September 2024, 69 m away
- [**PA/04347/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04347-23/san-pawl-il-bahar-change-of-use-from-2-car-garage): Change of use from 2 car garage to Class 4B retail outlet and alteration to main aperture on façade. Granted, validated 19 July 2023, 72 m away
- [**PA/03923/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03923-23/san-pawl-il-bahar-sanction-railing-and-to-split-the-4th): To sanction railing and to split the 4th floor apartment into 2 apartments and to develop 2 apartments instead of the penthouse at 5th floor level. An… Granted, validated 28 June 2023, 6 floors plus a receded floor, 72 m away
- [**PA/08240/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-08240-24/san-pawl-il-bahar-change-of-use-from-garage-to-public): Change of use from garage to public service garage. Granted, validated 4 December 2024, 77 m away
- [**PA/07353/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07353-26/san-pawl-il-bahar-minor-alteration-to-existing-balconies): Minor alteration to existing balconies. Pending, 84 m away

## More by Michael Anastasi

- [**PA/07657/26** Pembroke](https://propertylist.mt/permit/PA-07657-26/pembroke-changes-to-permit-pa-04863-21): Proposed changes to permit PA/04863/21, including changes to the lift shaft at roof level and removal of landscaping from what was previously approved. Pending
- [**PA/07533/26** Rabat](https://propertylist.mt/permit/PA-07533-26/rabat-renewal-request-to-pa-05950-18-change-of): Renewal request to PA/05950/18 - Change of use from shop to Class 4C, restoration of facade and minor internal and external alterations. Pending, validated 28 October 2026
- [**PA/06952/26** Rabat](https://propertylist.mt/permit/PA-06952-26/rabat-renewal-request-to-pa-10246-17-proposed-extension): Renewal request to PA/10246/17 - Proposed extension of approved 3rd level (as per PA/7449/16) including minor alterations and lowering of roof level by one… Pending, validated 7 October 2026, 4 floors plus a receded floor
- [**PA/06525/26** Mgarr](https://propertylist.mt/permit/PA-06525-26/mgarr-demolish-existing-dwelling-and-construct-ground-floor): To demolish existing dwelling and construct ground floor garage, 3 overlying floors with one apartment per floor and a penthouse at setback floor level… Pending, validated 23 September 2026, 4 floors plus a receded floor
- [**PA/06513/26** Marsaskala](https://propertylist.mt/permit/PA-06513-26/marsaskala-demolish-existing-dwelling): To demolish existing dwelling, excavate site and construct basement garages, one maisonette, three overlying floors with one apartment per floor and a… Pending, validated 23 September 2026, 4 floors plus a receded floor
- [**PA/05966/26** Xghajra](https://propertylist.mt/permit/PA-05966-26/xghajra-changes-to-development-approved-in-pa-02519-19-and): Changes to development approved in PA/02519/19 and PA/05233/22. Proposed modifications whereby Flat 7 is reconfigured from a duplex to a single-level unit at… Granted, validated 27 October 2026

[All applications by Michael Anastasi](https://propertylist.mt/perit/michael-anastasi)

## More from Jeremy Muscat

- [**PA/04462/26** Hamrun](https://propertylist.mt/permit/PA-04462-26/hamrun-demolition-of-existing-ground-and-first-floor): Proposed demolition of existing ground and first floor levels whilst retaining façade with minor alterations, and proposed construction of a Class 4C… Pending, validated 1 July 2026, 4 floors
- [**PA/01804/26** Hamrun](https://propertylist.mt/permit/PA-01804-26/hamrun-demolish-existing-dwellings): To demolish existing dwellings, excavate site and construct basement garages, two Class 4B, three overlying floors with 6 apartments per floor and 5… Pending, validated 18 March 2026, 5 floors plus a receded floor
- [**PA/01553/26** Zejtun](https://propertylist.mt/permit/PA-01553-26/zejtun-alterations-to-existing-farmhouse-including-replacement-of): Alterations to existing farmhouse including replacement of collapsing roofs, additions at 1st floor level, and construction of pool. Pending, validated 11 March 2026
- [**PA/07020/25** Marsaxlokk](https://propertylist.mt/permit/PA-07020-25/marsaxlokk-development-comprising-of-demolition-of-existing-building): Proposed development comprising of demolition of existing building, including excavation to build: reservoir and a semi basement garage with 2 garages with… Withdrawn, validated 29 October 2025
- [**PA/04331/25** Hamrun](https://propertylist.mt/permit/PA-04331-25/hamrun-sanction-internal-and-external-changes-in-as): To sanction internal and external changes in as built drawings as approved in PA/09389/17. Withdrawn
- [**PA/02903/25** Birkirkara](https://propertylist.mt/permit/PA-02903-25/birkirkara-propose-demolition-of-the-existing-second-floor): To propose demolition of the existing second floor, minor internal and external alterations to the first floor, and the construction of an extension… Granted, validated 7 May 2025, 3 floors plus a receded floor

[All planning applications in San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)
