PA/07465/25: Sanctioning of existing dwelling from original permit in Fgura
2, St. Catherin, Triq il-Grawwa, Fgura
Sanctioning of existing dwelling from original permit PA4187/84; including sub-division of dwelling, alterations at first floor level and additional rooms at second floor level.
- Status
- Granted (This application has been approved by Planning Board / Commission.)
- Location
- 2, St. Catherin, Triq il-Grawwa, Fgura
- Locality
- Fgura
- Applicant
- Aiken Desira
- Perit
- Perit David Micallef
- Application type
- Full development permission
- Zone
- Within Development Zone
- Type of works
- Sanctioning
- Height
- 3 floors
- Received
- 20 September 2025
- Validated
- 9 December 2025
- Decision
- Acceptable
- Permit expires
- 24 December 2030
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around 2, St. Catherin, Triq il-Grawwa, Fgura
No other applications recorded nearby yet.
Approval estimate for sanctioning applications like this here: about 95% (likely range 65–100%, low reliability, from 0 comparable decisions nearby). No granted application nearby states a height to compare with. Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
More by David Micallef
- PA/08104/25 Swieqi: Sanctioning of apartment at third floor level from original permit PA06593/02.
- PA/07041/25 Fgura: Facade works including hard stone cladding and sanctioning of replaced apertures, and minor internal alteration at first floor level (post-regularisation…
- PA/03773/25 Zebbug (Gozo): Sanctioning of residential unit at basement (type 3) floor level, including proposed alterations for a two-bedroomed apartment, plus street level garage
- PA/02423/25 Attard: To sanction as-built dwelling from approved permit PA3745/91.
- PA/01296/25 Tarxien: To sanction as-built apartment.
- PA/01710/23 Marsaxlokk: Alterations to existing dwelling including street-level garage, reconstruction of back rooms at ground floor, additional rooms at first floor, and receded…