PA/07567/25: excavation of existing site and construction of in Zurrieq

Mariposa Apartments, New street off, Trejqet il-Barrieri, Zurrieq

Proposed excavation of existing site and construction of semi-basement garages, a three bedroom maisonette at ground floor, three three bedroom units at first to third floor and two bedroom penthouse at fourth floor. A pool is also proposed at roof level.

Status
Granted (This application has been approved by Planning Board / Commission.)
Location
Mariposa Apartments, New street off, Trejqet il-Barrieri, Zurrieq
Locality
Zurrieq
Applicant
Carmen Cassar
Perit
Perit Pierre Poulton
Application type
Full development permission
Zone
Within Development Zone
Type of works
New Construction (Residential)
Height
4 floors plus a receded floor
Residential units
5
Received
14 August 2025
Validated
26 November 2025
Published
26 November 2025
Comments close
5 January 2026
Recommendation
Grant Permission
Decision
Grant Permission
Decision date
13 April 2026
Permit expires
23 September 2031

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around Mariposa Apartments, New street off, Trejqet il-Barrieri, Zurrieq

68 other applications within 300 m: 35 granted, 3 refused, 11 pending. 92% of decided applications nearby were granted. Tallest granted nearby: 3 floors (PA/00270/25).

On Trejqet il-Barrieri: 5 other applications, 2 granted and 0 refused; granted buildings are typically 3 floors, the tallest 3.

Approval estimate for new construction applications like this here: about 74% (likely range 44–100%, low reliability, from 0 comparable decisions nearby). It proposes 4 floors; the tallest granted nearby is 3. Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.