PA/07736/22: propose chimney in San Pawl il-Bahar
Vert Bleu Court, Duplex Penthouse A10, Triq San Pawl, San Pawl il-Bahar
To propose chimney.
- Status
- Granted (This application has been approved by Planning Board / Commission.)
- Location
- Vert Bleu Court, Duplex Penthouse A10, Triq San Pawl, San Pawl il-Bahar
- Locality
- San Pawl il-Bahar
- Applicant
- Ms Denise Abela
- Perit
- Perit Michelle Micallef Bugeja
- Application type
- Full development permission - Summary Process
- Zone
- Within Development Zone
- Type of works
- Other
- Received
- 31 October 2022
- Validated
- 1 February 2023
- Published
- 14 December 2022
- Comments close
- 9 January 2023
- Decision
- Acceptable
- Permit expires
- 15 February 2028
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around Vert Bleu Court, Duplex Penthouse A10, Triq San Pawl, San Pawl il-Bahar
127 other applications within 300 m: 83 granted, 2 refused, 19 pending. 98% of decided applications nearby were granted. Tallest granted nearby: 7 floors (PA/02674/25).
On Triq San Pawl: 93 other applications, 64 granted and 0 refused; granted buildings are typically 5 floors, the tallest 7. Periti active on this street: JG Periti, Edwin Mintoff, Maria Schembri Grima, Jean Azzopardi, MODEL.
Approval estimate for other applications like this here: about 93% (likely range 63–100%, low reliability, from 4 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/02971/25 San Pawl il-Bahar: Proposed minor internal alterations, sanctioning of structure at roof level and proposed dismantling of existing enclosed gold aluminium balcony and proposed…
- PA/00846/25 San Pawl il-Bahar: Renewal of PA/06295/16 - Demolition of existing washrooms and construction of duplex unit at 4th and 5th floor from Triq San Pawl. Proposal also include…
- PA/03465/23 San Pawl il-Bahar: Proposed division of the existing two-bedroom ground floor apartment into two separate units. A one-bedroom apartment and one-bedroom studio apartment.
- PA/01246/26 San Pawl il-Bahar: Proposed changes to approved permits PA/06167/24 and PA/01209/25. The changes include the addition of one garage (increasing the total number of garages from…
- PA/01209/25 San Pawl il-Bahar: Proposed demolition of existing property, excavation of a plot and construction of one garage private use at ground floor level, and 6 apartments from first…
- PA/06167/24 San Pawl il-Bahar: Proposed demolition of existing property, excavation of a plot and construction of one garage private use at ground floor level, and 6 apartments from first…
- PA/07126/24 San Pawl il-Bahar: Retention of facade, demolition of the existing building and the construction of an office (Class 4A) at ground floor level and six overlying dwelling units.
- PA/06221/23 San Pawl il-Bahar: Renewal of PA7049/17 consisting of alterations to PA6143/16 including an additional floor, alterations to layout and modification of single storey apartment…
- PA/03335/24 San Pawl il-Bahar: Proposed new outdoor cable kiosk to replace older kiosk to service an existing pumping station.
- PA/05072/25 San Pawl il-Bahar: Proposed application in lieu of PA7049/17 as renewed in PA6221/23 including the demolition of the existing ground floor and reconfiguration of levels to…
- PA/07703/26 San Pawl il-Bahar: Proposed parapet wall at roof level to screen roof services on a pre-1967 dwelling, including pv panels.
- PA/01264/26 San Pawl il-Bahar: The development shall include alterations and additions to the development approved under PA/2674/25, namely: the demolition of the neighbouring two-storey…
- PA/02674/25 San Pawl il-Bahar: Demolition of existing structure, and construction of 7 floors of apartments.
- PA/01102/23 San Pawl il-Bahar: Proposed consolidation of two pre-1967 dwellings into a two bedroom maisonette. The following includes alterations such as opening/closing of openings,…
- PA/00004/21 San Pawl il-Bahar: To construct two additional floors and a receded floor and internal modifications to existing structure, to create three apartments and a duplex apartment.
More by Michelle Micallef Bugeja
- PA/07209/26 Qormi: To sanction utility room and a pergola at roof level of a pre-1967 building.
- PA/07041/26 Mosta: To propose change of use to approved permit PA10514/17 at ground floor level from Class 5B to Class 5A.
- PA/06990/26 Zebbug: Internal alterations at first floor. To demolish the existing washroom at second floor and to propose two apartments at second and third floors and a…
- PA/06849/26 Rabat: To demolish existing dwelling and construct a new residential development comprising four (4) garages and five (5) parking spaces at basement level, two (2)…
- PA/06572/26 Hamrun: To sanction property and shop (Class 4B) as built to approved permit PB2382/71. Demolition of the existing washroom and utility room at roof level and to…
- PA/05419/26 Marsa: Proposed replacement of the existing dangerous slabs over two utility rooms and a bathroom at basement level, in accordance with RG 1252/24.