> Pending planning application in San Pawl il-Bahar: Demolition of existing dwelling and structures in garden; levelling of site and excavation for the…

Planning applications › San Pawl il-Bahar › PA0779126

# PA/07791/26: Demolition of existing dwelling and structures in in San Pawl il-Bahar

3 and 4, Triq il-Pwales, Xemxija, San Pawl il-Bahar

Demolition of existing dwelling and structures in garden; levelling of site and excavation for the construction of a reservoir; construction of 8 garages at ground floor with six residential units above and an elevated communal garden at first floor.

- **Status:** Pending (At Initial Vetting / Plotting Stage)
- **Location:** 3 and 4, Triq il-Pwales, Xemxija, San Pawl il-Bahar
- **Locality:** [San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)
- **Applicant:** Stephanie Bottari
- **Perit:** [Perit Claude Mallia](https://propertylist.mt/perit/claude-mallia)
- **Application type:** Full development permission
- **Zone:** Within Development Zone
- **Type of works:** Demolition & New Construction (Residential)
- **Height:** 2 floors
- **Residential units:** 6
- **Received:** 28 August 2026
- **Published:** 11 November 2026
- **Comments close:** 11 December 2026

The public planning file has 25 documents: plans, reports, consultations and the decision.

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/07791/26)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=07791&caseYear=26)

## Planning activity around 3 and 4, Triq il-Pwales, Xemxija, San Pawl il-Bahar

26 other applications within 300 m: 20 granted, 0 refused, 1 pending. 100% of decided applications nearby were granted. Tallest granted nearby: 6 floors (PA/04023/23).

On Triq il-Pwales: 10 other applications, 6 granted and 0 refused; granted buildings are typically 3 floors, the tallest 3.

Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 3 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/06205/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06205-25/san-pawl-il-bahar-demolition-of-first-floor-maisonette-and-constructio): Demolition of first floor maisonette and construction of 5 apartments. Granted, validated 3 December 2025, 1 floor, 143 m away
- [**PA/03475/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03475-23/san-pawl-il-bahar-internal-and-external-modifications-and-addition-of): Internal and external modifications and addition of second floor level to existing first floor level maisonette. Proposed two overlying duplex apartments. Granted, validated 14 June 2023, 3 floors, 143 m away
- [**PA/03295/22** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03295-22/san-pawl-il-bahar-demolish-existing-structures): To demolish existing structures, excavate and construct garage for private car parking at level 0 and part level 1 and construct 19 no residential units at… Status being checked, 9 floors, 147 m away
- [**PA/02217/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02217-23/san-pawl-il-bahar-renewal-of-pa-09759-17-for-the-proposal-reading): Renewal of PA/09759/17 for the proposal reading: Proposed demolition of dwellings. Construction of 5 apartments, a recessed floor and semi-basement garage. Granted, validated 15 May 2023, 161 m away
- [**PA/04023/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04023-23/san-pawl-il-bahar-construct-2no-maisonettes-at-ground-floor-level): To construct 2no maisonettes at ground floor level and 11no apartments at first, second, third, fourth, fifth and receded floor levels. Application includes 1… Granted, validated 17 August 2023, 6 floors plus a receded floor, 162 m away
- [**PA/03484/21** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03484-21/san-pawl-il-bahar-demolition-of-an-existing-washroom-and-construction): Demolition of an existing washroom and construction of a bedroom with en-suite Status being checked, 171 m away
- [**PA/06130/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06130-23/san-pawl-il-bahar-excavate-and-construct-2no-domestic-stores-at): Excavate and construct 2no domestic stores at lower and upper basement levels, 2no garages at ground floor level and 6no apartments at first, second, third,… Granted, validated 17 January 2024, 6 floors plus a receded floor, 173 m away
- [**PA/07294/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07294-25/san-pawl-il-bahar-change-of-use-from-garage-approved-by): Change of use from garage approved by PA/6130/23 to substation. Granted, validated 12 November 2025, 175 m away
- [**PA/05846/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05846-24/san-pawl-il-bahar-excavate-and-construct-21-garages-in-total): Excavate and construct 21 garages in total at lower basement, upper basement and ground floor level and 18 apartments in total at first, second, third,… Granted, validated 4 September 2024, 6 floors plus a receded floor, 184 m away
- [**PA/08327/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-08327-24/san-pawl-il-bahar-sanction-internal-and-external-alterations-on-the): To sanction internal and external alterations on the receded floor level from approved permit PA401/14. Granted, validated 26 February 2025, 185 m away
- [**PA/01114/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01114-25/san-pawl-il-bahar-demolish-existing-apartments-and-construct-2-garages): To demolish existing apartments and construct 2 garages at ground floor level, ten 2 bedroom units from first to fifth floor level and one 2 bedroom penthouse… Granted, validated 26 February 2025, 6 floors plus a receded floor, 200 m away
- [**PA/07759/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07759-23/san-pawl-il-bahar-formation-of-a-reed-bed-planted-pond): Formation of a reed bed planted pond to act as a SUDS, increasing of tree coverage with local and indigenous trees, upgrading of the sanitary facility.… Granted, validated 24 January 2024, 200 m away
- [**PA/05843/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05843-25/san-pawl-il-bahar-sanction-a-c-unit-on-fa-ade-in-triq): To sanction A/C unit on façade in Triq L-Awwista and proposed fixing of A/C units in coordination with the other interested owner in the block in vertical… Granted, validated 10 December 2025, 211 m away
- [**PA/05676/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05676-23/san-pawl-il-bahar-sanction-differences-from-approved-pa3433-18-and-to): To sanction differences from approved PA3433/18 and to separate triplex dwelling into two separate dwellings. Granted, validated 27 September 2023, 211 m away
- [**PA/06826/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06826-24/san-pawl-il-bahar-installation-of-solar-operated-desalination-system-i): Proposed installation of solar operated desalination system including ancillary works such as, formation of steel platform, installation of desalination… Granted, validated 9 October 2024, 214 m away

## More by Claude Mallia

- [**PA/07334/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07334-26/san-pawl-il-bahar-sanction-basement-as-built-including-new-ramp): To sanction basement as built including: new ramp leading to garage, alterations to the internal layouts at basement. Proposed change of use of the basement… Pending, validated 21 October 2026
- [**PA/06977/26** Hamrun](https://propertylist.mt/permit/PA-06977-26/hamrun-demolish-the-existing-3-storey-dwelling-and-construct): To demolish the existing 3-storey dwelling and construct a 5-storey apartment building, comprising a separate domestic store and Class 4B commercial premises… Pending, validated 14 October 2026, 5 floors
- [**PA/06936/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06936-26/san-pawl-il-bahar-changes-to-development-approved-in-pa-08002-25): Changes to development approved in PA/08002/25, consisting of the redesign of the internal layout of the apartments (number of units unchanged) and the… Pending, validated 7 October 2026
- [**PA/06921/26** Zabbar](https://propertylist.mt/permit/PA-06921-26/zabbar-sanctioning-of-existing-villa-and-re-positioning): Sanctioning of existing villa and re- positioning of pool as built including rebuilding of corridor joining the two buildings. Pending, validated 7 October 2026
- [**PA/06648/26** Pieta](https://propertylist.mt/permit/PA-06648-26/pieta-part-demolition-of-the-existing-building-and): Part demolition of the existing building and construction of an apartment block with a commercial ground floor. Ground floor to be Class 4C (food and drink… Pending, validated 30 September 2026, 4 floors plus a receded floor
- [**PA/06577/26** Xaghra](https://propertylist.mt/permit/PA-06577-26/xaghra-sanctioning-of-basement-levels-b3-to-b1): Proposed sanctioning of basement levels B3 to B1 and the sundeck at B2, as built. Proposed extension of approved Class 3B hotel (PA/03255/20) including… Pending, validated 30 September 2026

[All applications by Claude Mallia](https://propertylist.mt/perit/claude-mallia)

[All planning applications in San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)