> Granted planning application in San Pawl il-Bahar: Demolition of existing townhouses, excavation of site and construction of: three levels of basement to…

Planning applications › San Pawl il-Bahar › PA0800225

# PA/08002/25: Demolition of existing townhouses in San Pawl il-Bahar

3,5, 7, Triq San Gwann Battista c/w, Triq San Publju, San Pawl il-Bahar

Demolition of existing townhouses, excavation of site and construction of: three levels of basement to accommodate 18 car spaces a reservoir; six floors and a receded floor above street level consisting of a total of 20 residential units and two swimming pools on the roof.

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** 3,5, 7, Triq San Gwann Battista c/w, Triq San Publju, San Pawl il-Bahar
- **Locality:** [San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)
- **Applicant:** [Misrah Kola 2020 Ltd. Attn: Dorianne Tabone](https://propertylist.mt/applicant/misrah-kola-2020-ltd)
- **Perit:** [Perit Claude Mallia](https://propertylist.mt/perit/claude-mallia)
- **Application type:** Full development permission
- **Zone:** Within Development Zone
- **Type of works:** Demolition & New Construction (Residential)
- **Height:** 6 floors plus a receded floor
- **Residential units:** 20
- **Received:** 20 September 2025
- **Validated:** 10 December 2025
- **Published:** 10 December 2025
- **Comments close:** 19 January 2026
- **Recommendation:** Grant Permission
- **Decision:** Grant Permission
- **Decision date:** 28 April 2026
- **Permit expires:** 13 May 2031

Premium: register with WhatsApp (free) on PropertyList to read what its planning file says: the case officer's recommendation, the reasons, conditions and consultations.

The public planning file has 82 documents: plans, reports, consultations and the decision.

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/08002/25)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=08002&caseYear=25)

## Planning activity around 3,5, 7, Triq San Gwann Battista c/w, Triq San Publju, San Pawl il-Bahar

86 other applications within 300 m: 55 granted, 1 refused, 12 pending. 98% of decided applications nearby were granted. Tallest granted nearby: 7 floors (PA/07218/23).

On Triq San Gwann Battista: 4 other applications, 3 granted and 0 refused; granted buildings are typically 6 floors, the tallest 6.

Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 10 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/00894/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00894-26/san-pawl-il-bahar-demolish-existing-building-and-construct-ground-floo): To demolish existing building and construct ground floor garage, 5 apartments from first till sixth floor level and a penthouse at penthouse level including a… Granted, validated 11 February 2026, 6 floors plus a receded floor, 19 m away
- [**PA/07258/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07258-24/san-pawl-il-bahar-extension-of-an-existing-apartment-at-fourth): Extension of an existing apartment at fourth floor and construction of receded floor. Refused, validated 23 October 2024, 5 floors plus a receded floor, 27 m away
- [**PA/01031/20** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01031-20/san-pawl-il-bahar-sanction-variations-from-previous-approved-permit-pa): To sanction variations from previous approved permit PA/01758/09 to internal wall positions Status being checked, 39 m away
- [**PA/05934/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05934-23/san-pawl-il-bahar-sanction-the-addition-of-a-backyard-to): To sanction the addition of a backyard to an approved Class 4B shop at semi-basement plan and to correct drafting error of back-yard at semi-basement level… Granted, validated 21 November 2023, 44 m away
- [**PA/04883/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04883-23/san-pawl-il-bahar-renewal-of-pa4664-18-to-make-alterations): Renewal of PA4664/18 - To make alterations to existing setback floor including roofing over of existing terrace and construct a new overlying setback floor. Granted, validated 11 October 2023, 44 m away
- [**PA/00915/20** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00915-20/san-pawl-il-bahar-sanction-changes-to-garage-facade-including-the): To sanction changes to garage facade including the opening of a window. Status being checked, 44 m away
- [**PA/07146/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07146-23/san-pawl-il-bahar-split-triplex-penthouse-approved-in-pa4664-18): To split triplex penthouse - approved in PA4664/18 - into three separate apartments. Withdrawn, validated 29 November 2023, 45 m away
- [**PA/04210/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04210-24/san-pawl-il-bahar-sanction-apartment-as-built-from-previously-approved): To sanction apartment as built from previously approved permit PA/01352/13. Granted, validated 25 July 2024, 46 m away
- [**PA/02336/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02336-24/san-pawl-il-bahar-demolish-2-no-existing-interconnected-dwellings-and): To demolish 2 no existing interconnected dwellings and erect an apartment block consisting in 2 levels of underground parking, 2 No Ground floor two bedroomed… Granted, validated 24 April 2024, 6 floors plus a receded floor, 46 m away
- [**PA/06936/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06936-26/san-pawl-il-bahar-changes-to-development-approved-in-pa-08002-25): Changes to development approved in PA/08002/25, consisting of the redesign of the internal layout of the apartments (number of units unchanged) and the… Pending, validated 7 October 2026, 47 m away
- [**PA/05770/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05770-26/san-pawl-il-bahar-internal-and-external-alterations-at-ground-floor): Proposed internal and external alterations at ground floor level to accommodate for a lift shaft and to construct a new stairway. Demolition of existing… Pending, validated 19 August 2026, 6 floors plus a receded floor, 49 m away
- [**PA/03128/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03128-23/san-pawl-il-bahar-sanctioning-of-variations-to-pa-05584-19-which-inclu): Sanctioning of variations to PA/05584/19 which include minor displacements of internal and external walls, and apertures. Proposed travertine cladding on the… Granted, validated 31 May 2023, 52 m away
- [**PA/00250/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00250-25/san-pawl-il-bahar-demolition-of-existing-dwelling-and-construction-of): Demolition of existing dwelling and construction of Class 4B shop (1 unit) and overlying dwelling (1 unit on 5 levels) and fixing of sign. Granted, validated 22 January 2025, 61 m away
- [**PA/05893/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05893-24/san-pawl-il-bahar-construction-of-washroom-between-two-existing-struct): Construction of washroom between two existing structures at roof level including opening of doorway in common parts. Granted, validated 16 January 2025, 62 m away
- [**PA/03651/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03651-24/san-pawl-il-bahar-extension-at-roof-level-and-alterations-at): Extension at roof level and alterations at ground and lower roof floor level. Granted, validated 26 June 2024, 71 m away

## More by Claude Mallia

- [**PA/07791/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07791-26/san-pawl-il-bahar-demolition-of-existing-dwelling-and-structures-in): Demolition of existing dwelling and structures in garden; levelling of site and excavation for the construction of a reservoir; construction of 8 garages at… Pending, 2 floors
- [**PA/07334/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07334-26/san-pawl-il-bahar-sanction-basement-as-built-including-new-ramp): To sanction basement as built including: new ramp leading to garage, alterations to the internal layouts at basement. Proposed change of use of the basement… Pending, validated 21 October 2026
- [**PA/06977/26** Hamrun](https://propertylist.mt/permit/PA-06977-26/hamrun-demolish-the-existing-3-storey-dwelling-and-construct): To demolish the existing 3-storey dwelling and construct a 5-storey apartment building, comprising a separate domestic store and Class 4B commercial premises… Pending, validated 14 October 2026, 5 floors
- [**PA/06936/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06936-26/san-pawl-il-bahar-changes-to-development-approved-in-pa-08002-25): Changes to development approved in PA/08002/25, consisting of the redesign of the internal layout of the apartments (number of units unchanged) and the… Pending, validated 7 October 2026
- [**PA/06921/26** Zabbar](https://propertylist.mt/permit/PA-06921-26/zabbar-sanctioning-of-existing-villa-and-re-positioning): Sanctioning of existing villa and re- positioning of pool as built including rebuilding of corridor joining the two buildings. Pending, validated 7 October 2026
- [**PA/06648/26** Pieta](https://propertylist.mt/permit/PA-06648-26/pieta-part-demolition-of-the-existing-building-and): Part demolition of the existing building and construction of an apartment block with a commercial ground floor. Ground floor to be Class 4C (food and drink… Pending, validated 30 September 2026, 4 floors plus a receded floor

[All applications by Claude Mallia](https://propertylist.mt/perit/claude-mallia)

## More from Misrah Kola 2020 Ltd

- [**PA/06936/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06936-26/san-pawl-il-bahar-changes-to-development-approved-in-pa-08002-25): Changes to development approved in PA/08002/25, consisting of the redesign of the internal layout of the apartments (number of units unchanged) and the… Pending, validated 7 October 2026
- [**PA/06921/26** Zabbar](https://propertylist.mt/permit/PA-06921-26/zabbar-sanctioning-of-existing-villa-and-re-positioning): Sanctioning of existing villa and re- positioning of pool as built including rebuilding of corridor joining the two buildings. Pending, validated 7 October 2026
- [**PA/05275/26** St Julians](https://propertylist.mt/permit/PA-05275-26/st-julians-demolition-of-workshop): Demolition of workshop (Class 4B), excavation of reservoir and construction of dwelling on 3 floors and receded floor (Class 1). Pending, validated 5 August 2026, 3 floors plus a receded floor
- [**PA/05243/26** Qormi](https://propertylist.mt/permit/PA-05243-26/qormi-partial-demolition-of-existing-dwelling): Partial demolition of existing dwelling, alterations and construction of extension to retained structure, excavation of 3 underground reservoirs, and… Pending, validated 29 July 2026, 2 floors
- [**PA/04899/26** Zebbug](https://propertylist.mt/permit/PA-04899-26/zebbug-full-demolition-of-existing-townhouse): Full demolition of existing townhouse. Construction of apartment block on Triq Sciortino side of the site, including excavation of a reservoir and basement, a… Pending, validated 15 July 2026, 2 floors
- [**PA/02457/26** Zebbug](https://propertylist.mt/permit/PA-02457-26/zebbug-sanction-drawings-as-per-survey): To sanction drawings as per survey, including the proposed demolition of portions of internal walls at all levels, partial demolition of slabs above ground… Granted, validated 6 May 2026, 5 floors

[All planning applications in San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)