---
title: "PA/08315/25: sanction garage as built within development constructed in San Pawl il-Bahar |…"
url: https://propertylist.mt/permit/PA-08315-25/san-pawl-il-bahar-sanction-garage-as-built-within-development-construc
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-02
---

> Granted planning application in San Pawl il-Bahar: To sanction garage as built within development constructed with permit no: PA/1960/06. Perit Andre Magro.…

Planning applications › San Pawl il-Bahar › PA0831525

# PA/08315/25: sanction garage as built within development constructed in San Pawl il-Bahar

The Peak, Level -1, Garage 11, Triq San Massimiljanu Kolbe, San Pawl il-Bahar

To sanction garage as built within development constructed with permit no: PA/1960/06.

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** The Peak, Level -1, Garage 11, Triq San Massimiljanu Kolbe, San Pawl il-Bahar
- **Locality:** [San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)
- **Applicant:** Angelo Camilleri
- **Perit:** [Perit Andre Magro](https://propertylist.mt/perit/andre-magro)
- **Application type:** Full development permission
- **Zone:** Within Development Zone
- **Type of works:** Sanctioning
- **Received:** 1 December 2025
- **Validated:** 26 January 2026
- **Decision:** Acceptable
- **Permit expires:** 4 February 2031

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/08315/25)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=08315&caseYear=25)

## Planning activity around The Peak, Level -1, Garage 11, Triq San Massimiljanu Kolbe, San Pawl il-Bahar

151 other applications within 300 m: 93 granted, 3 refused, 16 pending. 97% of decided applications nearby were granted. Tallest granted nearby: 8 floors (PA/02706/25).

On Triq San Massimiljanu Kolbe: 12 other applications, 7 granted and 1 refused; granted buildings are typically 8 floors, the tallest 8. Periti active on this street: [Mario Axisa](https://propertylist.mt/perit/mario-axisa).

Approval estimate for sanctioning applications like this here: about 95% (likely range 65–100%, medium reliability, from 47 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/00014/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00014-25/san-pawl-il-bahar-sanction-internal-alterations-and-changes-to-facade): To sanction internal alterations and changes to facade from PA/3228/17. Proposal to change one-bedroom at fifth floor to a two-bedroom and to split approved… Granted, validated 26 February 2025, 17 m away
- [**PA/02183/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02183-23/san-pawl-il-bahar-sanction-third-floor-flat): To sanction third floor flat (Flat 5) as built including internal and external variations from PB2799/91. Granted, validated 11 May 2023, 17 m away
- [**PA/01208/21** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01208-21/san-pawl-il-bahar-change-of-use-from-garage-to-childcare): Change of use from garage to childcare (Class 2C) and carry out minor internal alterations and installation of sign Status being checked, 26 m away
- [**PA/07197/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07197-23/san-pawl-il-bahar-alterations-to-existing-maisonette-including-the-rem): Proposed alterations to existing maisonette including the removal of access from the common area to have a private entrance. The application is also intended… Granted, validated 9 February 2024, 33 m away
- [**PA/04100/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04100-26/san-pawl-il-bahar-sanction-apartment-as-built): To sanction apartment as built (originally approved by virtue of PA1960/06), including change in site configuration, minor internal alterations and change in… Granted, validated 17 June 2026, 34 m away
- [**PA/02250/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02250-25/san-pawl-il-bahar-sanctioning-of-apartment-as-built-from-pa-01545-08): Proposed sanctioning of apartment as built from PA/01545/08 including variations from the official building alignments. Granted, validated 9 April 2025, 36 m away
- [**PA/02706/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02706-25/san-pawl-il-bahar-demolition-of-sixth-floor-apartment-and-construction): Demolition of sixth floor apartment and construction of three new apartments and extension at seventh floor level including two apartments with pools. Granted, validated 23 April 2025, 8 floors, 40 m away
- [**PA/05938/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05938-24/san-pawl-il-bahar-extension-to-the-existing-receded-floor-creating): Extension to the existing receded floor creating a three bedroom apartment and the construction of an overlying two bedroom receded floor and jacuzzi. Granted, validated 18 September 2024, 41 m away
- [**PA/01995/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01995-26/san-pawl-il-bahar-change-of-use-from-garage-as-approved): Change of use from garage as approved in PA/05359/02 to Class 4B shop, including proposed fascia sign and internal alterations. Granted, validated 25 March 2026, 43 m away
- [**PA/00590/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00590-23/san-pawl-il-bahar-renewal-to-pa-06699-17-proposed-change-of): Renewal to PA/06699/17 - Proposed change of use from garage to Class 4B shop, proposed shop sign and proposed extension to property. Granted, validated 8 March 2023, 43 m away
- [**PA/06465/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06465-25/san-pawl-il-bahar-extension-of-building-and-construction-of-3): Proposed extension of building and construction of 3 apartments from fourth floor level upwards. Granted, validated 15 October 2025, 44 m away
- [**PA/06219/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06219-25/san-pawl-il-bahar-extension-of-building-and-construction-of-3): Proposed extension of building and construction of 3 apartments from fourth floor level upwards. Granted, validated 1 October 2025, 44 m away
- [**PA/02426/22** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02426-22/san-pawl-il-bahar-sanction-changes-from-pa7881-06): To sanction changes from PA7881/06. Status being checked, 44 m away
- [**PA/02565/21** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02565-21/san-pawl-il-bahar-change-of-use-from-garage-to-class): Change of use from garage to Class 4B convenience shop, including the installation of signage on the facade. Status being checked, 44 m away
- [**PA/02120/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02120-24/san-pawl-il-bahar-extension-of-existing-receded-floor-level-and): Proposed extension of existing receded floor level and construction of new receded floor level to form two residential units. Application also includes… Granted, validated 10 April 2024, 55 m away

## More by Andre Magro

- [**PA/07139/26** Sliema](https://propertylist.mt/permit/PA-07139-26/sliema-sanction-property-as-built): To sanction property as built. To propose change of use from a private garage to Class 4B. To carry out internal and external changes and to fix a sign. Pending, validated 14 October 2026
- [**PA/07057/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07057-26/san-pawl-il-bahar-changing-of-balcony-and-minor-internal-alterations): Proposed changing of balcony and minor internal alterations. Pending
- [**PA/07027/26** San Gwann](https://propertylist.mt/permit/PA-07027-26/san-gwann-sanction-property-as-built): To sanction property as built. To propose change of use from a private garage to Class 4B. To carry out internal and external changes and to fix a sign. Pending, validated 14 October 2026
- [**PA/06912/26** Tarxien](https://propertylist.mt/permit/PA-06912-26/tarxien-minor-internal-changes-from-approved-permit-pa-4734-26): Proposed minor internal changes from approved permit PA/4734/26. Pending
- [**PA/06848/26** Hamrun](https://propertylist.mt/permit/PA-06848-26/hamrun-construct-an-additional-room-within-residential-apartment): To construct an additional room within residential apartment to be used as a gym. Pending
- [**PA/06708/26** Xghajra](https://propertylist.mt/permit/PA-06708-26/xghajra-excavate-site-for-the-construction-of-a): To excavate site for the construction of a semi-basement garage, change of use of the approved ground-floor garage (PA/3852/25) to a one-bedroom maisonette,… Pending, validated 30 September 2026, 4 floors plus a receded floor

[All applications by Andre Magro](https://propertylist.mt/perit/andre-magro)

[All planning applications in San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)
