> Granted planning application in San Pawl il-Bahar: To construct 5no apartments over pre-1967 residential development at third, fourth, fifth, sixth, and…

Planning applications › San Pawl il-Bahar › PA0842424

# PA/08424/24: construct 5no apartments over pre-1967 residential development in San Pawl il-Bahar

Tudor Flats, Flat 3, Triq il-Bajja, San Pawl il-Bahar

To construct 5no apartments over pre-1967 residential development at third, fourth, fifth, sixth, and receded floor levels. Application includes minor alterations to apartment at second floor level and redesign of common parts to install lift to serve all levels.

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** Tudor Flats, Flat 3, Triq il-Bajja, San Pawl il-Bahar
- **Locality:** [San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)
- **Applicant:** [Christian Zammit](https://propertylist.mt/applicant/christian-zammit)
- **Perit:** [Perit Tancred Mifsud](https://propertylist.mt/perit/tancred-mifsud)
- **Application type:** Full development permission
- **Zone:** Within Development Zone
- **Type of works:** New Construction (Residential)
- **Height:** 6 floors plus a receded floor
- **Residential units:** 5
- **Received:** 17 September 2024
- **Validated:** 18 December 2024
- **Published:** 18 December 2024
- **Comments close:** 27 January 2025
- **Recommendation:** Refuse Permission
- **Decision:** Grant Permission
- **Decision date:** 18 June 2025
- **Permit expires:** 2 July 2030

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/08424/24)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=08424&caseYear=24)

## Planning activity around Tudor Flats, Flat 3, Triq il-Bajja, San Pawl il-Bahar

6 other applications on the same street: 3 granted, 0 refused, 1 pending. 100% of decided applications nearby were granted.

On Triq il-Bajja: 6 other applications, 3 granted and 0 refused.

Approval estimate for new construction applications like this here: about 93% (likely range 63–100%, low reliability, from 0 comparable decisions nearby). No granted application nearby states a height to compare with. Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/03612/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03612-25/san-pawl-il-bahar-part-change-of-use-from-class-4d): Proposed part change of use from Class 4D to Class 4B. Application also includes internal and external alterations incl. extension in back yard. Granted, validated 4 June 2025
- [**PA/01035/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01035-25/san-pawl-il-bahar-change-of-use-from-class-1-residential): Change of use from Class 1 residential to Class 4B retail including internal and external alterations and fixing of signage. Granted, validated 26 February 2025
- [**PA/00772/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00772-24/san-pawl-il-bahar-change-of-use-from-class-4c): Proposed change of use from Class 4C (as per previously approved PA/01082/16) to Class4D, with an increase in floor area under the same use, to also include… Granted, validated 14 February 2024
- [**PA/00359/20** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00359-20/san-pawl-il-bahar-change-of-use-from-2-apartments-at): Change of use from 2 apartments at levels 1 and 2 to guesthouse. Status being checked
- [**PA/01444/21** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01444-21/san-pawl-il-bahar-change-of-use-from-tourist-agency-office): Change of use from tourist agency office (Class 4A) to take away. Status being checked
- [**PA/06694/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06694-26/san-pawl-il-bahar-sanction-existing-3-bedroom-apartment-at-receded): To sanction existing 3 bedroom apartment at receded fourth floor level 'as built' originally approved in PA3560/00, and proposed minor internal alterations. Pending

## More by Tancred Mifsud

- [**PA/07495/26** Hamrun](https://propertylist.mt/permit/PA-07495-26/hamrun-renewal-of-permit-pa-09977-17): Renewal of permit PA/09977/17, construction of second floor and penthouse, creation of lift shaft, demolition and re-erection of staircase, demolition and… Pending, validated 28 October 2026, 3 floors plus a receded floor
- [**PA/07223/26** Msida](https://propertylist.mt/permit/PA-07223-26/msida-demolish-part-motorcycle-showroom-and-part-dwelling): To demolish part motorcycle showroom and part dwelling and construct 1no garage at part ground floor level and a guesthouse (Class 3A) at part ground, first,… Pending, validated 21 October 2026, 7 floors plus a receded floor
- [**PA/06630/26** Gzira](https://propertylist.mt/permit/PA-06630-26/gzira-demolish-existing-dwelling-retaining-facade-and-construct): To demolish existing dwelling retaining facade and construct 6 no residential units at ground, first, second, third, fourth and receded floor levels. Pending, validated 30 September 2026, 5 floors plus a receded floor
- [**PA/06567/26** Zabbar](https://propertylist.mt/permit/PA-06567-26/zabbar-excavate-and-construct-43no-garages-at-lower): Excavate and construct 43no garages at lower and upper basement levels and 24no residential units at ground, first, second, third and receded floor levels. Pending, validated 23 September 2026, 4 floors plus a receded floor
- [**PA/06507/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06507-26/san-pawl-il-bahar-alterations-and-additions-to-existing-car-showroom): Alterations and additions to existing car showroom approved by PA/4084/15. Application includes alterations and additions to Class 4A office space at third… Pending, validated 23 September 2026
- [**PA/05761/26** Mosta](https://propertylist.mt/permit/PA-05761-26/mosta-demolish-existing-dwelling): To demolish existing dwelling, excavate and construct 3no garages at basement level and 5no residential units at ground, first, second, third and receded… Pending, validated 19 August 2026, 4 floors plus a receded floor

[All applications by Tancred Mifsud](https://propertylist.mt/perit/tancred-mifsud)

## More from Christian Zammit

- [**PA/03583/26** Siggiewi](https://propertylist.mt/permit/PA-03583-26/siggiewi-demolition-of-existing-structure-and-construction-of): Demolition of existing structure and construction of three garages, and four overlying residential units. Granted, validated 13 July 2026, 2 floors
- [**PA/04537/25** Zebbug](https://propertylist.mt/permit/PA-04537-25/zebbug-sanction-the-reconstruction-of-boundary-rubble-wall): To sanction the reconstruction of boundary rubble wall, proposed stables with ancillary facilities, underlying reservoir and pumproom. Granted, validated 9 July 2025
- [**PA/00553/25** Rabat (Gozo)](https://propertylist.mt/permit/PA-00553-25/rabat-gozo-renew-permit-pa-06011-19-alterations-to-existing-dwelling): To renew permit PA/06011/19: Alterations to existing dwelling, extension to first floor as well as construction of second and third floor; To change use of… Granted, validated 25 February 2025, 4 floors
- [**PA/01845/24** Mosta](https://propertylist.mt/permit/PA-01845-24/mosta-alterations-and-extension-to-penthouse-covered-by): Proposed alterations and extension to penthouse covered by PA/01316/13, consisting of: part roofing of terrace and construction of additional floor. Granted, validated 27 March 2024
- [**PA/05344/23** Gudja](https://propertylist.mt/permit/PA-05344-23/gudja-proposed-installation-of-a-fence-for-privacy): The proposed installation of a fence for privacy purposes at the roof level. The fence is not visible from the facade. Granted, validated 11 December 2023
- [**PA/02153/21** Gudja](https://propertylist.mt/permit/PA-02153-21/gudja-replacing-and-shifting-of-the-main-door): Replacing and shifting of the main door, installing an antiporta, and proposed restoration of the facade Status being checked

[All planning applications in San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)