PA/08447/24: sanction division of maisonette into two apartments in Zejtun
167, Red Rose, Triq il-President Anton Buttigieg, Zejtun
To sanction division of maisonette into two apartments. Sanctioning involves internal alterations at first floor and change in rooms designation at first and second floor. Proposal includes the sanctioning of an ac in the front garden of a Class 4B and the proposal of a retractable canopy above the entrance of the Class 4B.
- Status
- Granted (This application has been approved by Planning Board / Commission.)
- Location
- 167, Red Rose, Triq il-President Anton Buttigieg, Zejtun
- Locality
- Zejtun
- Applicant
- Michaela Cutajar
- Perit
- Perit Robert Borg Hayman
- Application type
- Full development permission - Summary Process
- Zone
- Within Development Zone
- Type of works
- Sanctioning
- Residential units
- 2
- Received
- 25 November 2024
- Validated
- 28 January 2025
- Published
- 18 December 2024
- Comments close
- 13 January 2025
- Decision
- Acceptable
- Permit expires
- 12 February 2030
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around 167, Red Rose, Triq il-President Anton Buttigieg, Zejtun
75 other applications within 300 m: 50 granted, 4 refused, 3 pending. 93% of decided applications nearby were granted. Tallest granted nearby: 4 floors (PA/03166/25).
On Triq il-President Anton Buttigieg: 20 other applications, 13 granted and 1 refused; granted buildings are typically 4 floors, the tallest 4. Periti active on this street: Jesmond Mugliett, David Vassallo.
Approval estimate for sanctioning applications like this here: about 94% (likely range 64–100%, low reliability, from 17 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/07735/25 Zejtun: Sanctioning other changes from approved permit PA/4815/92. Proposed apramorta covering the services at roof level.
- PA/03166/25 Zejtun: Proposed alterations to stairwell and inclusion of lift, and alterations to approved first floor residential unit as approved in PA1639/17. Demolition of roof…
- PA/07406/25 Zejtun: Sanctioning of property as built and change of use of one shop selling firearms to Class 4B shop.
- PA/04180/23 Zejtun: To propose internal and external modifications including re-configuration of staircase, demolition of part of walls and roof slab at ground floor and first…
- PA/04726/23 Zejtun: Proposed change of use from garage to installation of an ATM including signage.
- PA/07255/23 Zejtun: To sanction minor internal and external changes to apartment and common area as approved in permit PA5463/07 [Proposed erection of semi-basement…
- PA/02019/25 Zejtun: To convert existing garage, approved in PB2604/70 into a workshop for photo frame assembly (Class 5A) and sales area (Class 4B). Proposal to include affixing…
- PA/05228/25 Zejtun: Proposed opening in elevation to create ventilation for a proposed ac unit.
- PA/00533/25 Zejtun: Partial change of use of existing garage to public service garage.
- PA/08277/25 Zejtun: To demolish existing residence, excavate basement garage to be linked with adjacent site approved by PA/2740/99 (forming 5 parking spaces), proposed…
- PA/02198/25 Ghaxaq: Application to sanction alterations to approved PA/5908/21 mainly re-positioning of internal walls, doors and windows and introduction of penthouse.…
- PA/01323/23 Ghaxaq: To demolish existing residential unit and construct 5 garages at basement level, 2 maisonettes at ground floor level, 6 overlying apartments at first, second…
- PA/03137/21 Ghaxaq: To demolish first and second floor apartment. Construction of four apartments over four floors
- PA/02461/21 Ghaxaq: Alterations and extension to dwelling covered by RG/02060/19 including construction of bedroom, bathroom and washroom at first floor level.
- PA/01696/21 Ghaxaq: To sanction dwelling approved by PB/3157/67, including shifting of doors, walls, windows and tools room at the back of site
More by Robert Borg Hayman
- PA/07708/26 Qormi: To roof-over basement driveway.
- PA/07673/26 Marsaskala: To install aluminum louvers on facade to screen ac compressors.
- PA/07396/26 Zejtun: To demolish existing terraced house, excavate to form basement garage interconnected with a car lift to a public services garage at ground floor, construct…
- PA/07265/26 Qormi: To sanction extension in front terrace of an existing penthouse built with PA/749/07 and sanctioned with PA/6022/17, and to construct a parapet wall to screen…
- PA/07244/26 Qormi: Renewal of PA/09636/17 - To install pv panels with required structure above existing garage and driveway.
- PA/06635/26 Zurrieq: To sanction changes carried out differently from what was approved with PA/04377/23 to pre-1967 Terraced house. Proposal included correction of height of…