propertylist

Planning applications in Attard

711 planning applications since 7 May 2020: 428 granted, 18 refused, 66 pending. Tallest granted: 5 floors. 120 applications so far in 2026, 32 validated in the last 90 days. 96% of decided applications were granted. Granted buildings are typically 4 floors. 761 residential units applied for.

Most common works: Sanctioning (291), Demolition & New Construction (Residential) (83), Change of Use (39), New Construction (Residential) (35), New Construction (30).

Busiest streets: Triq l-Imdina (54), Triq il-Linja (25), Triq il-Mosta (19), Triq il-Pitkali (18), Triq Dun Mikiel Xerri (16), Triq Lorenzo Manche' (15).

Most active periti here: Charles Buhagiar, Mannie Galea, Edwin Mintoff, Keith Schembri, Colin Zammit.

Latest decisions in Attard

  • PA/04167/26 Attard: Proposed installation of a Single-Sided Solar Powered External Illuminated Billboard – static billboard with external lighting (no LED display). Granted, validated 1 July 2026, decided 30 October 2026
  • PA/08309/24 Attard: Proposed sanctioning of dwelling from that approved by way of PB/01669/79. The latter includes extension to dwelling, both in built-up and landscaped area… Granted, validated 11 December 2024, decided 28 October 2026
  • PA/02447/26 Attard: Proposed extension at roof level to accommodate a washroom and jacuzzi. The application also includes the proposed and/or sanctioning of minor internal and… Granted, validated 22 April 2026, decided 28 October 2026
  • PA/01219/26 Attard: Sanctioning of garden centre constructed with differences to that approved in PA/02719/15, including minor differences based on more precise site survey,… Granted, validated 25 February 2026, decided 27 October 2026
  • PA/00934/26 Attard: To sanction minor internal and external alterations to class 4B building approved in PA 4113/15 at first, second and third floor, which include different… Granted, validated 29 April 2026, decided 27 October 2026

Latest applications in Attard

Planning in Attard: common questions

How many planning applications are there in Attard?

PropertyList has 711 Planning Authority applications on record for Attard, 120 of them from 2026 and 32 validated in the last 90 days.

What share of planning applications are approved in Attard?

96% of the 446 decided applications in Attard on record were granted (428 granted, 18 refused). Each case depends on its own site and the local plan.

How high can you build in Attard?

Granted applications in Attard with a stated height are typically 4 floors; the tallest granted on record is 5 floors. Heights are set street by street in the local plan, so check the street you're interested in on the PropertyList height map.

Which periti submit the most applications in Attard?

The most active periti in Attard are Charles Buhagiar (14), Mannie Galea (13), Edwin Mintoff (12), Keith Schembri (11), Colin Zammit (11).

How do I object to a planning application in Attard?

Send a representation to the Planning Authority before the "comments close" date shown on the application. PropertyList shows that date on each application page, with a link to the case on the Planning Authority website.

Planning map of Malta · Market insights · All localities