propertylist

Planning applications in Birzebbuga

807 planning applications since 9 December 2019: 485 granted, 22 refused, 83 pending. Tallest granted: 6 floors. 154 applications so far in 2026, 47 validated in the last 90 days. 96% of decided applications were granted. Granted buildings are typically 4 floors. 1,371 residential units applied for.

Most common works: Sanctioning (280), Demolition & New Construction (Residential) (109), New Construction (Residential) (50), Change of Use (47), New Construction (44).

Busiest streets: Triq San Filippu (29), Triq San Mikiel (29), Triq tal-Gebel (27), Triq Birzebbuga (23), Triq iz-Zurrieq (23), Triq il-Brolli (20).

Most active periti here: Michael Schembri, Jean Paul Debono Vella, Anton Zammit, Marvin Ellul, Edwin Mintoff.

Latest decisions in Birzebbuga

  • PA/04003/26 Birzebbuga: To sanction development. To split two levels into two distinct flats and internal alteration of other levels. Granted, validated 17 June 2026, decided 29 October 2026
  • PA/04411/26 Birzebbuga: To sanction apartment at second floor level from that approved in PAPB/03888/69 including proposed internal alteration and the installation of a wrought iron… Granted, validated 24 June 2026, decided 29 October 2026
  • PA/02838/25 Birzebbuga: Alteration at ground floor level, proposed construction of a maisonette at first floor for the farmer over the existing farm. Granted, validated 7 May 2025, 2 floors, decided 27 October 2026
  • PA/05131/26 Birzebbuga: To demolish and re-erect agricultural store on the same footprint which is dilapidated and structurally dangerous. To construct an underground store… Granted, validated 22 July 2026, 1 floor, decided 21 October 2026
  • PA/03921/26 Birzebbuga: Proposed consolidation of existing structures, construction of additional room (same area as structures to be consolidated), and excavation and construction… Granted, validated 17 June 2026, decided 21 October 2026

Latest applications in Birzebbuga

Planning in Birzebbuga: common questions

How many planning applications are there in Birzebbuga?

PropertyList has 807 Planning Authority applications on record for Birzebbuga, 154 of them from 2026 and 47 validated in the last 90 days.

What share of planning applications are approved in Birzebbuga?

96% of the 507 decided applications in Birzebbuga on record were granted (485 granted, 22 refused). Each case depends on its own site and the local plan.

How high can you build in Birzebbuga?

Granted applications in Birzebbuga with a stated height are typically 4 floors; the tallest granted on record is 6 floors. Heights are set street by street in the local plan, so check the street you're interested in on the PropertyList height map.

Which periti submit the most applications in Birzebbuga?

The most active periti in Birzebbuga are Michael Schembri (35), Jean Paul Debono Vella (19), Anton Zammit (19), Marvin Ellul (18), Edwin Mintoff (18).

How do I object to a planning application in Birzebbuga?

Send a representation to the Planning Authority before the "comments close" date shown on the application. PropertyList shows that date on each application page, with a link to the case on the Planning Authority website.

Planning map of Malta · Market insights · All localities