---
title: "Planning applications in Dingli: latest permits and decisions (page 4) | PropertyList"
url: https://propertylist.mt/planning-applications/dingli?page=4
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-03
---

> 381 Planning Authority applications in Dingli, 71 this year. 94% of decided applications granted. Tallest granted: 5 floors. New builds, extensions and…

Planning applications › By locality › Dingli

# Planning applications in Dingli

381 planning applications since 15 November 2019: 218 granted, 15 refused, 48 pending. Tallest granted: 5 floors. 71 applications so far in 2026, 13 validated in the last 90 days. 94% of decided applications were granted. Granted buildings are typically 3 floors. 485 residential units applied for.

Most common works: Sanctioning (153), Demolition & New Construction (Residential) (49), New Construction (29), New Construction (Residential) (26), Agricultural (20).

Busiest streets: Triq il-Kbira (26), Triq il-Buskett (19), Triq Guze' Ellul Mercer (15), Triq Panoramika (15), Triq San Pawl tal-Pitkali (15), Triq ir-Rabat (15).

Most active periti here: [Roderick Camilleri](https://propertylist.mt/perit/roderick-camilleri), [Charles Buhagiar](https://propertylist.mt/perit/charles-buhagiar), [X,Y,Z Architecture & Design](https://propertylist.mt/perit/x-y-z-architecture-and-design), [David Vassallo](https://propertylist.mt/perit/david-vassallo), [Carmel Farrugia](https://propertylist.mt/perit/carmel-farrugia).

## Latest decisions in Dingli

- [**PA/04358/26** Dingli](https://propertylist.mt/permit/PA-04358-26/dingli-sanction-greenhouse): To sanction greenhouse. Granted, validated 24 June 2026, decided 28 October 2026
- [**PA/05231/26** Dingli](https://propertylist.mt/permit/PA-05231-26/dingli-change-of-use-from-ground-floor-garage): Change of use from ground floor garage to Class 4B shop and sanctioning of existing basement store. Granted, validated 29 July 2026, decided 20 October 2026
- [**PA/02712/26** Dingli](https://propertylist.mt/permit/PA-02712-26/dingli-reinstatement-of-rubble-walls): Reinstatement of rubble walls, deposition of soil, excavation and construction of reservoir and overlying pump room. Granted, validated 29 April 2026, decided 20 October 2026
- [**PA/03072/26** Dingli](https://propertylist.mt/permit/PA-03072-26/dingli-construction-of-2-terraced-houses): Proposed construction of 2 terraced houses. Proposal includes excavation of basement garage, water reservoirs, 2 floors and washroom at roof level. Granted, validated 13 May 2026, 2 floors plus a receded floor, decided 16 October 2026
- [**PA/02575/26** Dingli](https://propertylist.mt/permit/PA-02575-26/dingli-maintenance-of-existing-legally-established-boundary-walls): Proposed maintenance of existing legally established boundary walls, including the excavation and construction of water reservoir and increase of soil level.… Granted, validated 22 April 2026, decided 2 October 2026

## Latest applications in Dingli

- [**PA/07438/24** Dingli](https://propertylist.mt/permit/PA-07438-24/dingli-conversion-of-an-existing-approved-disused-fire): The conversion of an existing approved disused fire works factory into a proposed olive oil production including ancillary stores, agricultural stores and a… Pending, validated 30 October 2024
- [**PA/07386/24** Dingli](https://propertylist.mt/permit/PA-07386-24/dingli-temporary-installation-of-a-small-greenhouse-at): Temporary installation of a small greenhouse at the Savio College, Dingli. Granted, validated 30 October 2024
- [**PA/07206/24** Dingli](https://propertylist.mt/permit/PA-07206-24/dingli-sanction-minor-changes-to-approved-basement-garage): To sanction minor changes to approved basement garage by PA/6820/20. Granted, validated 23 October 2024
- [**PA/07124/24** Dingli](https://propertylist.mt/permit/PA-07124-24/dingli-demolition-of-existing-dwelling-and-construction-of): Demolition of existing dwelling and construction of garage, 3 apartments and a washroom. Granted, validated 23 October 2024
- [**PA/06955/24** Dingli](https://propertylist.mt/permit/PA-06955-24/dingli-change-of-use-from-garage-to-insurance): Change of use from garage to insurance office (Class 4A), sanctioning of minor internal alterations and proposed fixing of sign. Granted, validated 16 October 2024
- [**PA/06922/24** Dingli](https://propertylist.mt/permit/PA-06922-24/dingli-renewal-of-pa-2007-16): Renewal of PA/2007/16. Granted, validated 16 October 2024
- [**PA/06906/24** Dingli](https://propertylist.mt/permit/PA-06906-24/dingli-demolition-of-existing-dwelling): Demolition of existing dwelling. Excavation and construction of basement garages, ground floor maisonette, 3 apartments (first, second and third) and 1… Granted, validated 16 October 2024, 4 floors plus a receded floor
- [**PA/06815/24** Dingli](https://propertylist.mt/permit/PA-06815-24/dingli-sanctioning-of-variations-on-a-pre-1967-building): Sanctioning of variations on a pre-1967 building, which include the construction of structures at ground floor, first floor and second floor level after 1967.… Granted, validated 9 October 2024, 3 floors
- [**PA/06784/24** Dingli](https://propertylist.mt/permit/PA-06784-24/dingli-sanction-the-property-as-built): To sanction the property as built. Granted, validated 3 December 2024
- [**PA/06284/24** Dingli](https://propertylist.mt/permit/PA-06284-24/dingli-sanction-as-built-and-change-of-use): To sanction as built and change of use from domestic garage to Class 3C (yoga studio). The development includes few internal alterations and the installation… Refused, validated 18 September 2024
- [**PA/06194/24** Dingli](https://propertylist.mt/permit/PA-06194-24/dingli-construction-of-two-floors-plus-another-receded): Proposed construction of two floors plus another receded floor on existing building for the creation of three additional residential units. Granted, validated 18 November 2024
- [**PA/06175/24** Dingli](https://propertylist.mt/permit/PA-06175-24/dingli-internal-alterations): Proposed internal alterations (shifting of walls) and external alterations which include alterations to approved apertures by PA5367/21. Proposed cesspit.… Granted, validated 18 September 2024
- [**PA/06105/24** Dingli](https://propertylist.mt/permit/PA-06105-24/dingli-reconstruction-of-roof-over-existing-pre-1967-agricultural): Reconstruction of roof over existing pre-1967 agricultural store. Excavation and construction of subterranean reservoir and sump. Granted, validated 18 September 2024
- [**PA/06038/24** Dingli](https://propertylist.mt/permit/PA-06038-24/dingli-sanction-maisonette-as-built-from-pa4613-93): To sanction maisonette as built from PA4613/93. Granted, validated 31 October 2024
- [**PA/05898/24** Dingli](https://propertylist.mt/permit/PA-05898-24/dingli-sanction-as-built): To sanction as built, changes from DN/00253/09. Granted, validated 4 October 2024
- [**PA/05529/24** Dingli](https://propertylist.mt/permit/PA-05529-24/dingli-construct-three-stables-and-ancillary-facilities-consisting): To construct three stables and ancillary facilities consisting of hay shed, tack room and paddock as well as to excavate and construct a reservoir, cesspit… Granted, validated 28 August 2024
- [**PA/05376/24** Dingli](https://propertylist.mt/permit/PA-05376-24/dingli-demolition-of-existing-garage-and-construction-of): Demolition of existing garage and construction of Class 4B shop including fixing of sign. Granted, validated 28 August 2024
- [**PA/05372/24** Dingli](https://propertylist.mt/permit/PA-05372-24/dingli-sanction-amendment-to-section-of-garage-as): To sanction amendment to section of garage as approved in doc 1d of PA/05866/23. Granted, validated 11 October 2024
- [**PA/05340/24** Dingli](https://propertylist.mt/permit/PA-05340-24/dingli-changes-from-approved-pa540-24): Proposed changes from approved PA540/24. Granted, validated 28 August 2024
- [**PA/05137/24** Dingli](https://propertylist.mt/permit/PA-05137-24/dingli-placing-of-pv-panels-over-a-pre-1967): Proposed placing of pv panels over a pre-1967 reservoir and proposed construction of a pump room serving the same reservoir. Application includes the creation… Refused, validated 7 August 2024
- [**PA/05028/24** Dingli](https://propertylist.mt/permit/PA-05028-24/dingli-sanction-an-existing-basement-private-garage-as): To sanction an existing basement private garage 'as built' which was built different from permits PA3802/98 and PA6576/96. Granted, validated 23 September 2024
- [**PA/04779/24** Dingli](https://propertylist.mt/permit/PA-04779-24/dingli-change-of-use-from-garage-to-office): Change of use from garage to office (Class 4A). Granted, validated 24 July 2024
- [**PA/04574/24** Dingli](https://propertylist.mt/permit/PA-04574-24/dingli-sanction-diversions-from-pa-1846-92-including-projecting): To sanction diversions from PA 1846/92 including projecting open balconies at first floor, to sanction PV panels at roof level, proposed alterations to… Withdrawn, validated 17 July 2024
- [**PA/04555/24** Dingli](https://propertylist.mt/permit/PA-04555-24/dingli-alteration-to-existing-aperture-to-enlarge-living): Proposed alteration to existing aperture to enlarge living room. Granted, validated 2 September 2024
- [**PA/04148/24** Dingli](https://propertylist.mt/permit/PA-04148-24/dingli-sanction-building-from-approved-pa-09464-17-to-as): To sanction building from approved PA/09464/17 to as built. Granted, validated 11 September 2024
- [**PA/03828/24** Dingli](https://propertylist.mt/permit/PA-03828-24/dingli-carry-out-internal-alterations-at-first-floor): To carry out internal alterations at first floor level and an extension at second floor level including an overlying parapet wall. Granted, validated 19 August 2024, 3 floors
- [**PA/03661/24** Dingli](https://propertylist.mt/permit/PA-03661-24/dingli-add-washrooms-at-roof-level-to-approved): To add washrooms at roof level to approved permit PA/05707/22. Granted, validated 19 July 2024
- [**PA/03572/24** Dingli](https://propertylist.mt/permit/PA-03572-24/dingli-sanction-as-built): To sanction as built (changes from PA277/93), to carry out internal and external alterations and to extend second floor. Granted, validated 25 July 2024
- [**PA/03463/24** Dingli](https://propertylist.mt/permit/PA-03463-24/dingli-sanction-existing-basement-and-ground-floor-garage): To sanction existing basement and ground floor garage as built from PA1657/02. Granted, validated 16 July 2024
- [**PA/03337/24** Dingli](https://propertylist.mt/permit/PA-03337-24/dingli-excavation-and-construction-of-underground-reservoir-and): Excavation and construction of underground reservoir and pumping chamber. Reinstatement of rubble walls and fixing of gate. Granted, validated 12 June 2024
- [**PA/03246/24** Dingli](https://propertylist.mt/permit/PA-03246-24/dingli-extension-to-existing-dwelling): Proposed extension to existing dwelling, minor internal alterations, alterations to facade to form garage opening and sanctioning of minor changes to facade… Granted, validated 19 June 2024
- [**PA/03114/24** Dingli](https://propertylist.mt/permit/PA-03114-24/dingli-change-of-use-from-approved-class-4b): Change of use from approved Class 4B shop to proposed Class 4B - greengrocer. Proposal includes minor non-structural internal and external alterations,… Granted, validated 29 May 2024
- [**PA/03112/24** Dingli](https://propertylist.mt/permit/PA-03112-24/dingli-part-demolition-of-existing-dwelling-and-construction): Proposed part demolition of existing dwelling and construction of terraced house including ground floor garage and dwelling over three floors and receded… Granted, validated 29 May 2024, 4 floors plus a receded floor
- [**PA/02874/24** Dingli](https://propertylist.mt/permit/PA-02874-24/dingli-changes-to-layouts-at-all-levels-from): Proposed changes to layouts at all levels from those approved in PA5367/21. Changes also include larger reservoirs at basement level resulting in further… Granted, validated 15 May 2024
- [**PA/02842/24** Dingli](https://propertylist.mt/permit/PA-02842-24/dingli-sanction-property-as-built-including-changes-from): To sanction property as built including changes from previous permit covered by PA/08624/19. The changes include the correction of the internal dimensions and… Granted, validated 15 May 2024
- [**PA/02752/24** Dingli](https://propertylist.mt/permit/PA-02752-24/dingli-proposal-includes-amendment-to-previously-approved-permit): Proposal includes amendment to previously approved permit PA/06164/21 to include installation of timber gate. Granted, validated 15 May 2024
- [**PA/02673/24** Dingli](https://propertylist.mt/permit/PA-02673-24/dingli-demolish-existing-un-utilised-area-building-forming-part): To demolish existing un-utilised area building forming part of an old poultry farm pre-1968, to excavate reservoir and construct a two storey dwelling (one… Pending, validated 8 May 2024, 2 floors
- [**PA/02568/24** Dingli](https://propertylist.mt/permit/PA-02568-24/dingli-demolition-and-reconstruction-of-existing-agricultural-room): Demolition and reconstruction of existing agricultural room in a different location (next to the other rooms for consolidation), alterations to the other 2… Granted, validated 30 April 2024
- [**PA/02406/24** Dingli](https://propertylist.mt/permit/PA-02406-24/dingli-demolition-of-existing-2-storey-terraced-house): Demolition of existing 2-storey terraced house, excavation of 1 basement level and construction of basement garage and 5-storey overlying apartment block for… Granted, validated 4 June 2024, 5 floors
- [**PA/02224/24** Dingli](https://propertylist.mt/permit/PA-02224-24/dingli-sanction-area-under-ramp-and-changes-in): To sanction area under ramp and changes in configuration of lift area. Sanctioning of changes from PA06588/07 and PA05273/19. Granted, validated 29 May 2024
- [**PA/02050/24** Dingli](https://propertylist.mt/permit/PA-02050-24/dingli-sanction-changes-from-approved-permit-pa-10564-18-and): To sanction changes from approved permit PA/10564/18 and to install chimney. Granted, validated 28 May 2024
- [**PA/01981/24** Dingli](https://propertylist.mt/permit/PA-01981-24/dingli-demolition-of-existing-property): Proposed demolition of existing property, excavation for reservoir, and construction of basement, ground floor level and four overlying floors including… Granted, validated 3 April 2024, 5 floors plus a receded floor
- [**PA/01869/24** Dingli](https://propertylist.mt/permit/PA-01869-24/dingli-demolish-washroom): To demolish washroom, convert terraced house into maisonette and common stairwell with lift and construct three overlying apartment and penthouse. Granted, validated 19 June 2024
- [**PA/01788/24** Dingli](https://propertylist.mt/permit/PA-01788-24/dingli-internal-and-external-alterations-at-all-levels): Internal and external alterations at all levels, extension at roof level and pool in backyard. Propose of new signage. Granted, validated 17 May 2024
- [**PA/01690/24** Dingli](https://propertylist.mt/permit/PA-01690-24/dingli-demolish-existing-house-approved-in-2002): To demolish existing house approved in 2002, construct one hundred and six garages at levels -1 and -2, with underlying reservoirs, an electrical sub-station,… Granted, validated 3 April 2024, 3 floors
- [**PA/01687/24** Dingli](https://propertylist.mt/permit/PA-01687-24/dingli-change-use-from-class-4b): To change use from Class 4B (retail) to Class 4C (commercial food and drink establishment - no cooking), to sanction alterations from original permit… Pending, validated 20 March 2024
- [**PA/01650/24** Dingli](https://propertylist.mt/permit/PA-01650-24/dingli-replacement-of-apertures-and-louvers-of-existing): Proposed replacement of apertures and louvers of existing property as per GS/420/23 and proposed sanctioning. Granted, validated 20 March 2024
- [**PA/01507/24** Dingli](https://propertylist.mt/permit/PA-01507-24/dingli-sanction-the-retention-of-room-in-the): To sanction the retention of room in the back yard exiting pre PA6016/20 and not demolished as approved in same PA. Granted, validated 20 March 2024
- [**PA/01485/24** Dingli](https://propertylist.mt/permit/PA-01485-24/dingli-excavation-of-site-and-construction-of-a): Excavation of site and construction of a single dwelling unit with a garage and a pool. Refused, validated 13 March 2024
- [**PA/01437/24** Dingli](https://propertylist.mt/permit/PA-01437-24/dingli-clearance-of-site): Clearance of site, localised excavation for construction of reservoirs and lift pits, construction of 3 terraced residential units at ground, first, second… Granted, validated 13 March 2024, 3 floors

[Newer](https://propertylist.mt/planning-applications/dingli?page=3) Page 4 of 8 [Older](https://propertylist.mt/planning-applications/dingli?page=5)
