propertylist

Planning applications in Mgarr

489 planning applications since 4 November 2019: 278 granted, 26 refused, 52 pending. Tallest granted: 7 floors. 83 applications so far in 2026, 21 validated in the last 90 days. 91% of decided applications were granted. Granted buildings are typically 4 floors. 759 residential units applied for.

Most common works: Sanctioning (137), Demolition & New Construction (Residential) (62), New Construction (Residential) (45), Agricultural (40), New Construction (31).

Busiest streets: Triq Sir Harry Luke (32), Triq Sir Temi Zammit (25), Triq Bingemma (22), Triq il-Kbira (17), Triq Santa Marija (16), Triq Fisher (15).

Most active periti here: Russell Marmara, Christian Chetcuti, Charles Buhagiar, Martin Farrugia, M&V Architects.

Latest decisions in Mgarr

  • PA/03241/26 Mgarr: Construction of underground reservoir and pump room and a tool room. Application includes the construction of a rubble wall and a timber gate. Granted, validated 24 June 2026, decided 30 October 2026
  • PA/01619/26 Mgarr: To propose extension of staircase and lift on roof at fourth floor level. Granted, validated 11 March 2026, decided 27 October 2026
  • PA/04815/26 Mgarr: To carry out internal alterations to two existing Shops, and to change the use from Class 4B to Class 4B Veterinary Pharmacy with ancillary Clinic.… Granted, validated 15 July 2026, decided 20 October 2026
  • PA/05310/26 Mgarr: To increase volume of reservoir approved under PA/01677/26, to propose construction of pump room and carry out minor alterations to the agricultural store… Granted, validated 29 July 2026, decided 16 October 2026
  • PA/00347/26 Mgarr: Sanctioning of minor variations from last approved PA/7938/17. Variations include location of walls, positioning of pool, internal height and location and… Granted, validated 15 April 2026, decided 13 October 2026

Latest applications in Mgarr

Planning in Mgarr: common questions

How many planning applications are there in Mgarr?

PropertyList has 489 Planning Authority applications on record for Mgarr, 83 of them from 2026 and 21 validated in the last 90 days.

What share of planning applications are approved in Mgarr?

91% of the 304 decided applications in Mgarr on record were granted (278 granted, 26 refused). Each case depends on its own site and the local plan.

How high can you build in Mgarr?

Granted applications in Mgarr with a stated height are typically 4 floors; the tallest granted on record is 7 floors. Heights are set street by street in the local plan, so check the street you're interested in on the PropertyList height map.

Which periti submit the most applications in Mgarr?

The most active periti in Mgarr are Russell Marmara (20), Christian Chetcuti (16), Charles Buhagiar (14), Martin Farrugia (11), M&V Architects (10).

How do I object to a planning application in Mgarr?

Send a representation to the Planning Authority before the "comments close" date shown on the application. PropertyList shows that date on each application page, with a link to the case on the Planning Authority website.

Planning map of Malta · Market insights · All localities