---
title: "Planning applications in Rabat (Gozo): latest permits and decisions (page 11) | PropertyList"
url: https://propertylist.mt/planning-applications/rabat-gozo?page=11
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-03
---

> 834 Planning Authority applications in Rabat (Gozo), 144 this year. 98% of decided applications granted. Tallest granted: 5 floors. New builds, extensions…

Planning applications › By locality › Rabat (Gozo)

# Planning applications in Rabat (Gozo)

834 planning applications since 13 October 2020: 532 granted, 13 refused, 91 pending. Tallest granted: 5 floors. 144 applications so far in 2026, 46 validated in the last 90 days. 98% of decided applications were granted. Granted buildings are typically 3 floors. 1,201 residential units applied for.

Most common works: Sanctioning (201), Demolition & New Construction (Residential) (79), Change of Use (77), New Construction (Residential) (74), Other (63).

Busiest streets: Triq it-Tabib Anton Tabone (44), Triq ir-Repubblika (35), Triq Ghajn Qatet (34), Triq Fortunato Mizzi (27), Triq il-Kapuccini (27), Triq Santa Dminka (22).

Most active periti here: [Alexander Bigeni](https://propertylist.mt/perit/alexander-bigeni), [Emanuel Vella](https://propertylist.mt/perit/emanuel-vella), [Saviour Micallef](https://propertylist.mt/perit/saviour-micallef), [Vella + Grech Periti](https://propertylist.mt/perit/vella-grech-periti), [Annamaria Attard Montalto](https://propertylist.mt/perit/annamaria-attard-montalto).

## Latest decisions in Rabat (Gozo)

- [**PA/03209/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-03209-26/rabat-gozo-sanction-extension-of-outdoor-catering-area-class): To sanction extension of outdoor catering area Class 4D on public open space, to the already approved in PA/04764/19, reservation of outside area for the… Refused, validated 13 May 2026, decided 27 October 2026
- [**PA/06610/25** Rabat (Gozo)](https://propertylist.mt/permit/PA-06610-25/rabat-gozo-carry-out-internal-and-external-alterations): To carry out internal and external alterations, to construct additions at all levels including roof level and pool. Granted, validated 15 October 2025, decided 27 October 2026
- [**PA/00153/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-00153-26/rabat-gozo-change-of-use-of-existing-dwelling-to): Change of use of existing dwelling to a Class 4C cafeteria at ground floor level and Class 3A guesthouse at upper floor levels; internal and external… Granted, validated 21 January 2026, 4 floors, decided 20 October 2026
- [**PA/03702/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-03702-26/rabat-gozo-propose-to-convert-the-sitting-room-into): To propose to convert the sitting room into a garage and to sanction pv panels at roof level floor. Granted, validated 10 June 2026, decided 20 October 2026
- [**PA/02975/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-02975-26/rabat-gozo-proposal-for-a-temporary-ambulance-support-area): Proposal for a temporary ambulance support area comprising shaded ambulance parking, offices, and staff administrative facilities. Granted, validated 3 June 2026, decided 15 October 2026

## Latest applications in Rabat (Gozo)

- [**PA/07777/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-07777-23/rabat-gozo-sanction-minor-variations-to-internal-layout-of): To sanction minor variations to internal layout of residential units at first and second floor together with common area approved in PA2263/95. To propose… Granted, validated 9 April 2024
- [**PA/07681/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-07681-23/rabat-gozo-construct-additions-at-roof-level): To construct additions at roof level. Granted, validated 3 January 2024
- [**PA/07588/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-07588-23/rabat-gozo-extend-existing-floor-at-third-floor-to): To extend existing floor at third floor to facade and construct a penthouse at forth floor level. Refused, validated 20 December 2023, 4 floors plus a receded floor
- [**PA/07483/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-07483-23/rabat-gozo-retain-facade): To retain facade, to demolish the remaining part of dwelling and to construct a restaurant (Class 4D) and 7 offices (Class 4A). Granted, validated 12 December 2023
- [**PA/07465/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-07465-23/rabat-gozo-replacement-of-a-lightweight-structure-at-second): Proposed replacement of a lightweight structure at second floor level into a solid structure. Also proposed alterations to the facade and other minor… Granted, validated 12 December 2023
- [**PA/07448/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-07448-23/rabat-gozo-rehabilitation-of-townhouse): Rehabilitation of townhouse, including alterations to facade, internal alterations and new washroom at roof level. Granted, validated 18 January 2024
- [**PA/07430/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-07430-23/rabat-gozo-demolish-existing-dilapidated-building-while-retaining-faca): To demolish existing dilapidated building while retaining facade (demolition approved in PA4211/19) and to carry out alterations within facade, to construct… Granted, validated 12 December 2023, 3 floors
- [**PA/07402/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-07402-23/rabat-gozo-propose-change-of-use-from-class-4b): To propose change of use from Class 4B (retails shop) to Class 2C(b) (educational). Granted, validated 12 December 2023
- [**PA/07352/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-07352-23/rabat-gozo-alterations-to-approved-permit-pa543-22): Alterations to approved permit PA543/22. These alterations include an extension at the back of the property, a back elevation, the relocation of the pool,… Granted, validated 12 December 2023
- [**PA/07320/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-07320-23/rabat-gozo-carry-out-the-replacement-of-roofs-to): To carry out the replacement of roofs to a pre-1967 dwelling. Granted, validated 6 December 2023
- [**PA/07313/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-07313-23/rabat-gozo-extension-of-administration-s): Extension of administration S.S. Enemalta and installation of electrical car charger. Granted, validated 31 January 2024
- [**PA/07303/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-07303-23/rabat-gozo-demolish-existing-first-floor-level): To demolish existing first floor level. To propose variations to the approved first and second floor levels having PA362/23 and change of use from offices to… Granted, validated 6 December 2023, 4 floors plus a receded floor
- [**PA/07228/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-07228-23/rabat-gozo-sanction-alterations-to-garage-at-ground-floor): To sanction alterations to garage at ground floor level, consisting of annexing of car space with garage no.10. Under appeal, validated 23 January 2024
- [**PA/07190/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-07190-23/rabat-gozo-construct-second-floor-apartment): To construct second floor apartment, to relocate the PV panels to the new roof level and sanctioning of the roof cantilever over the existing first floor… Granted, validated 13 February 2024, 3 floors
- [**PA/07104/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-07104-23/rabat-gozo-restore-facade-to-dwelling): To restore facade to dwelling. The works will consist in the cleaning of the facade, repointing, plastic repair and other works necessary to solidify the… Granted, validated 29 November 2023
- [**PA/07076/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-07076-23/rabat-gozo-change-of-use-from-a-disused-property): Change of use from a disused property to a Class 4C establishment. Granted, validated 29 November 2023
- [**PA/07059/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-07059-23/rabat-gozo-dismantle-and-re-construct-existing-dilapidated-back-domest): To dismantle and re-construct existing dilapidated back domestic store, kitchen/dining area and carry out additions and alterations to existing pre-1968 house… Granted, validated 29 November 2023
- [**PA/06957/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-06957-23/rabat-gozo-demolish-existing-building): To demolish existing building, excavate site and construct basement garage, ground floor shop (Class 4B) with fixed sign and maisonette with overlying 6 flats… Granted, validated 22 November 2023
- [**PA/06860/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-06860-23/rabat-gozo-create-a-new-dwelling-unit-at-ground): To create a new dwelling unit at ground floor level and to carry out internal additions and alterations. Granted, validated 15 November 2023
- [**PA/06848/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-06848-23/rabat-gozo-excavate-site-and-construct-9-flats-including): To excavate site and construct 9 flats including receded penthouse and basement with 9 garages/spaces. Granted, validated 31 January 2024
- [**PA/06787/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-06787-23/rabat-gozo-excavate-site-and-to-demolish-existing-building): To excavate site and to demolish existing building and proposed garage for private cars at basement level and five overlying flats (one at each level). Granted, validated 15 November 2023, 5 floors
- [**PA/06761/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-06761-23/rabat-gozo-erect-hay-store-for-existing-cattle-farm): To erect hay store for existing cattle farm and to sanction existing farm vehicles store/garage and fodder stores. Granted, validated 15 November 2023
- [**PA/06756/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-06756-23/rabat-gozo-carry-out-alterations-to-apartments-approved-in): To carry out alterations to apartments approved in PA/04267/22. Alterations include changes to layout and facade. To also convert part of an apartment to a… Refused, validated 15 November 2023
- [**PA/06746/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-06746-23/rabat-gozo-sanction-minor-internal-alterations-approved-in-pa-4466-10): To sanction minor internal alterations approved in PA/4466/10 and proposed extension at roof level. Granted, validated 31 January 2024
- [**PA/06676/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-06676-23/rabat-gozo-demolition-of-existing-elevated-maisonettes): Proposed demolition of existing elevated maisonettes, shop on the ground floor, and basement. Construction of Class 4D restaurant at basement and ground floor… Granted, validated 15 November 2023
- [**PA/06663/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-06663-23/rabat-gozo-renew-permit-pa-06290-19-to-carry-out): To renew permit PA/06290/19 - To carry out internal and external alterations at ground and first floors, to construct back additions and roof structure. Granted, validated 11 January 2024
- [**PA/06461/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-06461-23/rabat-gozo-clearing-of-soil-to-place-tower-crane): Proposed clearing of soil to place tower crane; proposal also includes construction of temporary retaining walls and concrete platform. Withdrawn, validated 1 November 2023
- [**PA/06442/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-06442-23/rabat-gozo-sanction-minor-internal-and-external-differences-from): To sanction minor internal and external differences from approved permission. Granted, validated 30 January 2024
- [**PA/06440/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-06440-23/rabat-gozo-change-of-use-to-class-2a-emergency): Change of use to Class 2A emergency homeless shelter and community centre, by the carrying out of internal alterations, consisting of splitting of part of… Granted, validated 1 November 2023
- [**PA/06381/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-06381-23/rabat-gozo-renewal-of-pa3449-18-restoration-of-internal): Renewal of PA3449/18 - Restoration of internal boundary walls and restoration of wall bordering street; to sanction installation of gate. Withdrawn
- [**PA/06297/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-06297-23/rabat-gozo-renew-pa3001-13-proposed-class-4b-retail): To renew PA3001/13 - Proposed Class 4B retail outlet and underlying car park with overlying garden. Withdrawn, 1 floor
- [**PA/06251/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-06251-23/rabat-gozo-carry-out-alterations-to-existing-pre-1967-garage): To carry out alterations to existing pre-1967 garage and to change the use from a garage to a restaurant (Class 4D). To also construct 4 offices (Class 4A). Granted, validated 25 October 2023
- [**PA/06223/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-06223-23/rabat-gozo-renew-permit-pa-09412-18-to-excavate-site): To renew permit PA/09412/18 - To excavate site and construct showroom at ground floor, basement garage, 3 apartments and a penthouse. Granted, validated 11 January 2024
- [**PA/06162/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-06162-23/rabat-gozo-prefabricated-mri-cabin-including-alterations-to-internal): Proposed prefabricated MRI cabin including alterations to internal facades to connect unit with hospital corridor. Granted, validated 8 January 2024
- [**PA/06000/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-06000-23/rabat-gozo-sanction-change-in-position-of-qty-3): To sanction change in position of Qty 3 musical benches and sanctioning of installation of additional Qty 2 musical benches. Granted, validated 18 October 2023
- [**PA/05998/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-05998-23/rabat-gozo-demolish-existing-showroom-and-offices): To demolish existing showroom and offices, to excavate site and to construct shop (Class 4B), to construct 4 residential units and a commercial store at… Granted, validated 11 October 2023
- [**PA/05968/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-05968-23/rabat-gozo-change-of-use-from-class-4b-shop): Change of use from Class 4B shop to Class 5A car valeting and ancillary sanitary facilities. Refused, validated 11 October 2023
- [**PA/05936/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-05936-23/rabat-gozo-renew-pa-09470-18-to-demolish-existing-terraced): To renew PA/09470/18 - To demolish existing terraced house and to construct 6 apartments, 2 penthouses and garages at basement level. Granted, validated 22 February 2024
- [**PA/05923/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-05923-23/rabat-gozo-trim-fascia-from-facade-and-close-part): To trim 'fascia' from facade and close part window at ground floor level. Granted, validated 30 October 2023
- [**PA/05911/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-05911-23/rabat-gozo-restore-facade-and-replace-apertures): To restore facade and replace apertures. Granted, validated 11 October 2023
- [**PA/05887/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-05887-23/rabat-gozo-renew-permit-pa7896-18-minor-internal-alterations): To renew permit PA7896/18 - Minor internal alterations and change in use from garage to Class 4B shop. Granted, validated 31 October 2023
- [**PA/05810/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-05810-23/rabat-gozo-carry-out-partial-demolition-of-existing-dilapidated): To carry out partial demolition of existing dilapidated building and to construct dwelling on two floors. Granted, validated 4 October 2023, 2 floors
- [**PA/05748/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-05748-23/rabat-gozo-sanctioning-of-third-party-walls-of-an): Sanctioning of third party walls of an already approved commercial building by virtue of PA318/23. Granted, validated 18 October 2023
- [**PA/05735/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-05735-23/rabat-gozo-modifications-to-pa-4223-20-proposal-includes-minor-interna): Modifications to PA/4223/20: proposal includes minor internal alterations and minor alterations to facade of Class 4A office building; proposed restoration… Granted, validated 25 January 2024
- [**PA/05729/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-05729-23/rabat-gozo-renew-pa-03943-18-minor-demolition-at-ground): To renew PA/03943/18 - Minor demolition at ground and first floors. Additions and alterations to existing dwelling consisting of alterations at ground and… Granted, validated 9 November 2023, 3 floors
- [**PA/05707/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-05707-23/rabat-gozo-carry-out-alterations-to-residential-units-approved): To carry out alterations to residential units approved in PA6429/18. Alterations include changes to layout and facade. To also create an additional… Granted, validated 31 October 2023
- [**PA/05703/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-05703-23/rabat-gozo-internal-alterations-at-ground-and-basement-levels): Proposed internal alterations at ground and basement levels - removal of one car garage, in lieu of PA8824/21. Granted, validated 8 November 2023
- [**PA/05490/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-05490-23/rabat-gozo-excavation-within-site-to-lower-levels): Excavation within site to lower levels, and construction of apartment block with basement garage, 1 maisonette, 3 apartments and 1 penthouse. Granted, validated 31 January 2024, 4 floors plus a receded floor
- [**PA/05433/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-05433-23/rabat-gozo-renewal-of-permit-pa0835-18): Renewal of permit PA0835/18 (Construction of 3 garages (6 parking spaces) at ground floor level, 3 apartments and a penthouse.) Granted, validated 25 October 2023, 2 floors plus a receded floor
- [**PA/05423/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-05423-23/rabat-gozo-annex-class-4d-cafeteria-with-take-away): To annex Class 4D cafeteria with take-away (cooking on site) by the carrying out of internal and external alterations. Granted, validated 13 September 2023

[Newer](https://propertylist.mt/planning-applications/rabat-gozo?page=10) Page 11 of 17 [Older](https://propertylist.mt/planning-applications/rabat-gozo?page=12)
