---
title: "Planning applications in Rabat (Gozo): latest permits and decisions (page 12) | PropertyList"
url: https://propertylist.mt/planning-applications/rabat-gozo?page=12
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-03
---

> 834 Planning Authority applications in Rabat (Gozo), 144 this year. 98% of decided applications granted. Tallest granted: 5 floors. New builds, extensions…

Planning applications › By locality › Rabat (Gozo)

# Planning applications in Rabat (Gozo)

834 planning applications since 13 October 2020: 532 granted, 13 refused, 91 pending. Tallest granted: 5 floors. 144 applications so far in 2026, 46 validated in the last 90 days. 98% of decided applications were granted. Granted buildings are typically 3 floors. 1,201 residential units applied for.

Most common works: Sanctioning (201), Demolition & New Construction (Residential) (79), Change of Use (77), New Construction (Residential) (74), Other (63).

Busiest streets: Triq it-Tabib Anton Tabone (44), Triq ir-Repubblika (35), Triq Ghajn Qatet (34), Triq Fortunato Mizzi (27), Triq il-Kapuccini (27), Triq Santa Dminka (22).

Most active periti here: [Alexander Bigeni](https://propertylist.mt/perit/alexander-bigeni), [Emanuel Vella](https://propertylist.mt/perit/emanuel-vella), [Saviour Micallef](https://propertylist.mt/perit/saviour-micallef), [Vella + Grech Periti](https://propertylist.mt/perit/vella-grech-periti), [Annamaria Attard Montalto](https://propertylist.mt/perit/annamaria-attard-montalto).

## Latest decisions in Rabat (Gozo)

- [**PA/03209/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-03209-26/rabat-gozo-sanction-extension-of-outdoor-catering-area-class): To sanction extension of outdoor catering area Class 4D on public open space, to the already approved in PA/04764/19, reservation of outside area for the… Refused, validated 13 May 2026, decided 27 October 2026
- [**PA/06610/25** Rabat (Gozo)](https://propertylist.mt/permit/PA-06610-25/rabat-gozo-carry-out-internal-and-external-alterations): To carry out internal and external alterations, to construct additions at all levels including roof level and pool. Granted, validated 15 October 2025, decided 27 October 2026
- [**PA/00153/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-00153-26/rabat-gozo-change-of-use-of-existing-dwelling-to): Change of use of existing dwelling to a Class 4C cafeteria at ground floor level and Class 3A guesthouse at upper floor levels; internal and external… Granted, validated 21 January 2026, 4 floors, decided 20 October 2026
- [**PA/03702/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-03702-26/rabat-gozo-propose-to-convert-the-sitting-room-into): To propose to convert the sitting room into a garage and to sanction pv panels at roof level floor. Granted, validated 10 June 2026, decided 20 October 2026
- [**PA/02975/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-02975-26/rabat-gozo-proposal-for-a-temporary-ambulance-support-area): Proposal for a temporary ambulance support area comprising shaded ambulance parking, offices, and staff administrative facilities. Granted, validated 3 June 2026, decided 15 October 2026

## Latest applications in Rabat (Gozo)

- [**PA/05405/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-05405-23/rabat-gozo-sanction-internal-and-external-additions-and-alterations): To sanction internal and external additions and alterations and proposed extension of chimney to dwelling house. Granted, validated 13 September 2023
- [**PA/05326/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-05326-23/rabat-gozo-demolish-existing-house-no-12-and-garage-no-13): To demolish existing house no:12 and garage no:13 retaining facade and to construct two storey house no:12 and ground floor garage no:13 with underlying… Granted, validated 6 September 2023, 2 floors
- [**PA/05296/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-05296-23/rabat-gozo-demolition-of-existing-dwelling-and-re-construction-of): Demolition of existing dwelling and re-construction of new dwelling. Proposal includes a garage and a backyard pool. Granted, validated 6 September 2023, 1 floor
- [**PA/05252/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-05252-23/rabat-gozo-change-layout-of-houses-approved-in-pa7417-21): To change layout of houses approved in PA7417/21 and excavate site to add basement garages. Granted, validated 6 September 2023
- [**PA/05189/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-05189-23/rabat-gozo-propose-minor-alterations-from-approved-rg493-20-including): To propose minor alterations from approved RG493/20 including change of apertures. Granted, validated 6 September 2023
- [**PA/05123/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-05123-23/rabat-gozo-carry-out-alterations-to-layout-of-garages): To carry out alterations to layout of garages approved in PA/07262/18. Alterations include changes to layout. To also update engineer’s report. Granted, validated 2 October 2023
- [**PA/05115/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-05115-23/rabat-gozo-additions-and-alterations-to-development-approved-in): Additions and alterations to development approved in PA6935/21, namely addition of street level garage, decrease in level of excavation, shifting of floor… Granted, validated 18 October 2023
- [**PA/05086/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-05086-23/rabat-gozo-restoration-of-external-facade-under-the-irrestawra): Restoration of external facade under the Irrestawra Darek Scheme Granted, validated 30 August 2023
- [**PA/04942/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-04942-23/rabat-gozo-minor-internal-alterations-at-first-floor-to): Proposed minor internal alterations at first floor to proposed minor internal alterations at first floor offices (Class 4A). Granted, validated 16 October 2023
- [**PA/04814/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-04814-23/rabat-gozo-restoration-of-the-belfry-of-st): Restoration of the belfry of St. Augustine church and the side and back facades of the adjoining priory. Granted, validated 28 September 2023
- [**PA/04751/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-04751-23/rabat-gozo-replace-damaged-boundary-wall): To replace damaged boundary wall, redesign of front garden, and to form gate Granted, validated 5 October 2023
- [**PA/04740/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-04740-23/rabat-gozo-renewal-to-pa-7821-17): Renewal to PA 7821/17 - (Additions and alterations to existing building, addition of office space at first floor level, and construction of apartment at… Granted, validated 23 October 2023, 3 floors
- [**PA/04734/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-04734-23/rabat-gozo-change-in-use-from-child-care-center): To change in use from Child Care Center (Class 2C) to Child Recreation Club (Class 3C) including 'Active Free Play', and fix sign. Granted, validated 9 August 2023
- [**PA/04700/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-04700-23/rabat-gozo-renewal-to-permission-pa4907-18-renewal-to-permission): Renewal to permission PA4907/18:- Renewal to permission PA1006/13:- Construction of maisonette at ground floor, two apartments, penthouse and underlying… Granted, validated 1 November 2023, 3 floors plus a receded floor
- [**PA/04678/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-04678-23/rabat-gozo-minor-variation-in-facade-material): Minor variation in facade material. Granted, validated 17 September 2023
- [**PA/04663/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-04663-23/rabat-gozo-two-apartments-at-first-floor-level): Proposed two apartments at first floor level. Granted, validated 2 August 2023, 2 floors
- [**PA/04474/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-04474-23/rabat-gozo-demolish-existing-building): To demolish existing building, excavate site, to construct 5 flats, shop class 4B and basement 4 car garage and fix 2 signs Granted, validated 26 July 2023, 2 floors
- [**PA/04420/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-04420-23/rabat-gozo-renew-pa-02101-18-to-demolish-existing-roof): To renew PA/02101/18 - To demolish existing roof structure and to construct offices (Class 4A) at third floor level and at receded floor level on existing. Granted, validated 5 September 2023, 3 floors plus a receded floor
- [**PA/04372/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-04372-23/rabat-gozo-propose-change-of-use-from-class-4b): To propose change of use from Class 4B shop to Class 4C (cafeteria) and minor alterations to facade. Granted, validated 19 July 2023
- [**PA/04341/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-04341-23/rabat-gozo-sanction-variation-in-facade): To sanction variation in facade, correct site configuration, and propose internal changes to Class 4A, including the orientation of the lift from the… Granted, validated 19 July 2023
- [**PA/04337/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-04337-23/rabat-gozo-staffroom-on-third-floor-of-school-building): Proposed staffroom on third floor of school building. Granted, validated 19 July 2023
- [**PA/04299/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-04299-23/rabat-gozo-carry-out-alterations-to-dwelling-approved-in): To carry out alterations to dwelling approved in PA00057/15 and to a pre-1967 dwelling. To also change use from a pre-1967 dwelling to a shop (Class 4B). To… Granted, validated 19 July 2023
- [**PA/04285/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-04285-23/rabat-gozo-minor-internal-alterations): Proposed minor internal alterations, extension at ground and first floor levels, addition of washroom at roof level and change of color of existing apertures. Granted, validated 4 October 2023
- [**PA/04235/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-04235-23/rabat-gozo-extend-pavement-inwards-to-establish-recycling-waste): To extend pavement inwards to establish recycling waste bring-in site. Withdrawn
- [**PA/04169/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-04169-23/rabat-gozo-renewal-of-permission-pa1702-15-and-pa827-08): Renewal of permission PA1702/15 and PA827/08 – To demolish existing building and construct semi-basement garage, three apartments and a penthouse. Granted, validated 8 November 2023, 3 floors plus a receded floor
- [**PA/04096/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-04096-23/rabat-gozo-propose-a-change-of-use-from-class): To propose a change of use from Class 4B to Class 4D including an extension of the original footprint of Class 4B and fix a sign. Granted, validated 5 July 2023
- [**PA/04075/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-04075-23/rabat-gozo-dismantling-of-galvanized-metal-railing-and-construction): Proposed dismantling of galvanized metal railing and construction of parapet wall in franka stone. Granted, validated 14 August 2023
- [**PA/04050/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-04050-23/rabat-gozo-restore-and-carry-out-minor-alterations-to): To restore and carry out minor alterations to existing facades. To dismantle a part of the existing roof slabs and internal walls, to be replaced by new walls… Granted, validated 5 July 2023, 3 floors plus a receded floor
- [**PA/04031/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-04031-23/rabat-gozo-change-of-use-from-private-car-garage): Change of use from private car garage to Class 4B retail shop. Proposal includes the installation of a shop sign. Granted, validated 5 July 2023
- [**PA/03879/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-03879-23/rabat-gozo-renew-pa-01989-14): To renew PA/01989/14 - (Alterations and additions to dwelling.) Granted, validated 26 July 2023
- [**PA/03810/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-03810-23/rabat-gozo-renewal-of-pa1151-12-proposed-construction-of): Renewal of PA1151/12 - Proposed construction of public belvedere at road level with underlying football club. Granted, validated 28 July 2023, 2 floors
- [**PA/03785/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-03785-23/rabat-gozo-additions-at-first-and-second-floor-as): Additions at first and second floor as approved in PA/01014/11. Granted, validated 28 June 2023
- [**PA/03775/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-03775-23/rabat-gozo-renewal-of-permit-pa6647-17): Renewal of permit PA6647/17; Renewal of permit PA1698/13: Renewal of permit PA5696/07: To amend permission PA0228/07 by changing terraced house to apartments,… Granted, validated 4 August 2023, 4 floors plus a receded floor
- [**PA/03722/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-03722-23/rabat-gozo-sanction-differences-from-previously-approved-permission-pa): To sanction differences from previously approved permission PA3907/94 consisting of different elevation, different plans at ground floor, first floor and roof… Withdrawn, validated 21 June 2023
- [**PA/03677/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-03677-23/rabat-gozo-renew-permit-pa8461-18-to-sanction-internal): To renew permit PA8461/18 - To sanction internal and external differences from previous permission PA5264/05, to extend third floor unit in front terrace and… Granted, validated 8 August 2023, 3 floors plus a receded floor
- [**PA/03638/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-03638-23/rabat-gozo-construct-dwelling-house-with-swimming-pool): To construct dwelling house with swimming pool. Granted, validated 21 June 2023
- [**PA/03537/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-03537-23/rabat-gozo-sanctioning-of-variations-from-previously-approved-pa1915-1): Sanctioning of variations from previously approved PA1915/14 that include the shifting of external, internal walls and apertures, the creation of garage at… Granted, validated 30 August 2023
- [**PA/03504/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-03504-23/rabat-gozo-renew-pa-2086-18-proposed-class-4b): To renew PA 2086/18 - Proposed Class 4B shop, internal alterations; re-instatement of shop front and fixing of sign. Granted, validated 20 July 2023
- [**PA/03498/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-03498-23/rabat-gozo-renewal-of-permission-pa4790-18-to-construct): Renewal of permission PA4790/18 - To construct terraced house with pool. Refused, validated 25 October 2023
- [**PA/03479/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-03479-23/rabat-gozo-change-of-use-from-approved-class-3a): Change of use from approved Class 3A guesthouse, to Class 1 terrace house dwelling. Granted, validated 14 June 2023
- [**PA/03439/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-03439-23/rabat-gozo-additions-and-alterations-to-penthouse-approved-in): Proposed additions and alterations to penthouse approved in PA3577/05. Granted, validated 4 August 2023
- [**PA/03422/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-03422-23/rabat-gozo-reinstate-collapsed-roofs): To reinstate collapsed roofs, construct additions including at roof level and to carry out internal and external alterations. To construct a pool at roof level. Granted, validated 14 June 2023
- [**PA/03416/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-03416-23/rabat-gozo-sanction-terraced-house-as-built): To sanction terraced house as built; changes consist in variations to facade; internal layout and garden shed at the back. Granted, validated 31 July 2023
- [**PA/03317/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-03317-23/rabat-gozo-relocate-barumbara-by-dismantling-and-re-construction-using): To relocate barumbara by dismantling and re-construction using same material and building methodology to allow the future intention of development of the site… Withdrawn, validated 6 June 2023
- [**PA/03250/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-03250-23/rabat-gozo-demolition-of-existing-dwelling): Demolition of existing dwelling, construction of garage level at ground floor level, with overlying three residential dwellings on three levels. Granted, validated 6 June 2023, 4 floors
- [**PA/03231/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-03231-23/rabat-gozo-sanction-variations-from-pa1100-00-consisting-of-changes): To sanction variations from PA1100/00 consisting of changes to front balcony, painting of facade and correction of site. Granted, validated 9 August 2023
- [**PA/03225/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-03225-23/rabat-gozo-demolish-an-existing-dwelling-house-and-construct): To demolish an existing dwelling house and construct a basement garage, an apartment at ground floor level and a duplex apartment at first and roof level. Granted, validated 6 June 2023, 2 floors plus a receded floor
- [**PA/03167/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-03167-23/rabat-gozo-renewal-of-pa3234-15-to-renew-pa6920-06): Renewal of PA3234/15 - To renew PA6920/06: To sanction variations from previous permission, and to construct additional apartments and penthouse Granted, validated 18 August 2023
- [**PA/03160/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-03160-23/rabat-gozo-renew-pa5001-17-to-extend-basement-domestic-store): To renew PA5001/17- To extend basement domestic store, alteration at ground floor and add pool reservoir and boundary walls. Granted, validated 15 September 2023
- [**PA/03118/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-03118-23/rabat-gozo-make-internal-alterations-in-pre-1967-dwelling): To make internal alterations in pre-1967 dwelling, introduce a pool and reservoir in the backyard and construct a new intermediate floor within the existing… Granted, validated 30 August 2023

[Newer](https://propertylist.mt/planning-applications/rabat-gozo?page=11) Page 12 of 17 [Older](https://propertylist.mt/planning-applications/rabat-gozo?page=13)
