Perit F. Pace
3 planning applications since 26 September 2020: 2 granted, 0 refused, 0 pending. Tallest granted: 5 floors. Main localities: Floriana (2), San Pawl il-Bahar (1).
- PA/09185/23 Floriana: Construction of new mixed-use development comprising retail at ground floor and eight apartments above
- PA/07651/21 Floriana: Proposed internal alterations and extension of washroom at roof level. Development includes the demolition of the existing washroom and re-construction of…
- PA/06990/20 San Pawl il-Bahar: To demolish existing terraced house and construction of basement garage at basement level, 1 maisonette at ground floor level and overlying 5 apartments on…