propertylist

PA/06990/20: demolish existing terraced house and construction of in San Pawl il-Bahar

34, Triq il-Preistorja, Xemxija, San Pawl il-Bahar

To demolish existing terraced house and construction of basement garage at basement level, 1 maisonette at ground floor level and overlying 5 apartments on six floors. Construction of splash pools at ground floor and receded floor levels.

Status
Granted (This application has been approved by Planning Board / Commission.)
Location
34, Triq il-Preistorja, Xemxija, San Pawl il-Bahar
Locality
San Pawl il-Bahar
Applicant
Mr Ryan Darmanin
Perit
Perit Matthew Briffa
Application type
Full development permission - Summary Process
Zone
Within Development Zone
Type of works
Demolition & New Construction (Residential)
Height
5 floors plus a receded floor
Residential units
6
Received
26 September 2020
Validated
16 December 2020
Published
28 October 2020
Comments close
12 November 2020
Decision
Acceptable
Permit expires
30 December 2028

Premium: register with WhatsApp (free) on PropertyList to read what its planning file says: the case officer's recommendation, the reasons, conditions and consultations.

The public planning file has 63 documents: plans, reports, consultations and the decision.

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around 34, Triq il-Preistorja, Xemxija, San Pawl il-Bahar

68 other applications within 300 m: 46 granted, 1 refused, 4 pending. 98% of decided applications nearby were granted. Tallest granted nearby: 6 floors (PA/03047/24).

On Triq il-Preistorja: 6 other applications, 5 granted and 1 refused; granted buildings are typically 5 floors, the tallest 5. Periti active on this street: Jeffrey Galea, architecture 360.

Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 1 comparable decision nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by F. Pace

All applications by F. Pace

More from Joseph Camilleri

All planning applications in San Pawl il-Bahar