propertylist

PA/00128/22: Construction of garage and pool with ancillary in Attard

23, Sequoia, Triq is-Sikka, Attard

Construction of garage and pool with ancillary facilities; alterations and extension to internal wall layout/facade and construction of opramorta at roof level to cover services. to sanction increase in gate width and proposed lowering of solid front garden wall.

Status
Status being checked
Location
23, Sequoia, Triq is-Sikka, Attard
Locality
Attard
Applicant
Mr Joseph & Ms Daniela Camilleri
Perit
Perit Andrew Farrugia
Type of works
Sanctioning
Residential units
1

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around 23, Sequoia, Triq is-Sikka, Attard

67 other applications within 300 m: 38 granted, 0 refused, 5 pending. 100% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/05677/24).

On Triq is-Sikka: 2 other applications, 0 granted and 0 refused.

Approval estimate for sanctioning applications like this here: about 95% (likely range 65–100%, low reliability, from 16 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Andrew Farrugia

All applications by Andrew Farrugia

All planning applications in Attard