propertylist

PA/00272/26: demolition of existing terraced houses in San Pawl il-Bahar

14, Nashville Tenessee and 12, Danfrador, Triq it-Turisti, San Pawl il-Bahar

Proposed demolition of existing terraced houses. Proposed excavation of basement garage and reservoir. Proposed construction of; garages at basement and ground floor levels, 3 three-bedroom apartments and 8 two-bedroom apartments on levels 1 to 6, 1 one-bedroom penthouse at level 7 and 1 duplex three-bedroom penthouse on level 6 and 7. Proposed pool at roof level.

Status
Granted (This application has been approved by Planning Board / Commission.)
Location
14, Nashville Tenessee and 12, Danfrador, Triq it-Turisti, San Pawl il-Bahar
Locality
San Pawl il-Bahar
Applicant
Peter Vella
Perit
M&V Architects
Application type
Full development permission
Zone
Within Development Zone
Type of works
Demolition & New Construction (Residential)
Height
1 floor
Received
19 November 2025
Validated
11 March 2026
Published
11 March 2026
Comments close
17 April 2026
Recommendation
Grant Permission
Decision
Grant Permission
Decision date
28 September 2026
Permit expires
7 October 2031

Premium: register with WhatsApp (free) on PropertyList to read what its planning file says: the case officer's recommendation, the reasons, conditions and consultations.

The public planning file has 40 documents: plans, reports, consultations and the decision.

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around 14, Nashville Tenessee and 12, Danfrador, Triq it-Turisti, San Pawl il-Bahar

174 other applications within 300 m: 100 granted, 4 refused, 21 pending. 96% of decided applications nearby were granted. Tallest granted nearby: 7 floors (PA/00596/26).

On Triq it-Turisti: 63 other applications, 36 granted and 2 refused; granted buildings are typically 6 floors, the tallest 7. Periti active on this street: Wayne Scerri, Colin Zammit, Matthew Gauci, Gilbert Bartolo, Mark Caruana.

Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 14 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by M&V Architects

All applications by M&V Architects

More from Peter Vella

All planning applications in San Pawl il-Bahar