PA/06154/23: alteration to approved permits PA3010/22 and PA2873/19 in San Pawl il-Bahar
22 / 28, Triq Salvatore Borg, San Pawl il-Bahar
Proposed alteration to approved permits PA3010/22 and PA2873/19. Proposed demolition of existing dwellings. Proposed excavation and construction of seven basement garages, two maisonettes and one apartment at ground floor level, nine overlying apartments at first, second and third floor level and two penthouse at receded floor level.
- Status
- Granted (This application has been approved by Planning Board / Commission.)
- Location
- 22 / 28, Triq Salvatore Borg, San Pawl il-Bahar
- Locality
- San Pawl il-Bahar
- Applicant
- Peter Vella
- Perit
- Perit Russell Marmara
- Application type
- Full development permission - Summary Process
- Zone
- Within Development Zone
- Type of works
- Demolition & New Construction (Residential)
- Height
- 4 floors plus a receded floor
- Residential units
- 14
- Received
- 5 September 2023
- Validated
- 14 December 2023
- Published
- 25 October 2023
- Comments close
- 9 November 2023
- Decision
- Acceptable
- Permit expires
- 3 January 2029
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around 22 / 28, Triq Salvatore Borg, San Pawl il-Bahar
218 other applications within 300 m: 121 granted, 9 refused, 28 pending. 93% of decided applications nearby were granted. Tallest granted nearby: 8 floors (PA/01983/25).
On Triq Salvatore Borg: 3 other applications, 2 granted and 0 refused; granted buildings are typically 6 floors, the tallest 6.
Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 9 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/07284/23 San Pawl il-Bahar: To sanction property as built with changes from that approved in PB3374/87 and PA5912/16 following site survey.
- PA/03010/22 San Pawl il-Bahar: To demolish existing dwelling. Proposed excavation and construction of basement garages, maisonette at ground floor level, three overlying apartments at…
- PA/04122/26 San Pawl il-Bahar: Demolition of existing dwelling. Proposed basement private garage and five overlying residential units.
- PA/04637/24 San Pawl il-Bahar: Proposed demolition of existing roof and internal walls of previously approved penthouse in PA4404/15 and proposed extensions to create a duplex apartment.…
- PA/01566/23 San Pawl il-Bahar: Proposed internal alterations including extension of room at roof level and loggia at roof level, and timber pergola. Proposed raising of 1m parapet wall over…
- PA/02422/22 San Pawl il-Bahar: Proposed demolition of roof slab of rooms at second floor, construct rooms at higher level, proposed pool at roof level and canopies. Application also…
- PA/01065/25 San Pawl il-Bahar: To sanction alterations from previous permit PA/1443/05 including the change of use from garage to a Class 4B retail outlet. Application is also intended to…
- PA/03851/26 San Pawl il-Bahar: Proposed alterations and additions to existing dwelling including subdivision in two maisonettes. Proposal includes changes to basement garage, sanctioning of…
- PA/03899/23 San Pawl il-Bahar: Sanctioning of pre-1992 one-bedroom apartment as built (no permit traced).
- PA/07891/24 San Pawl il-Bahar: Extension to a first floor maisonette to create the second and third floors above. The application also includes internal alterations at first floor and…
- PA/05563/26 San Pawl il-Bahar: To sanction layout of apartment as is. Previous permit is PAPB524/87.
- PA/05562/26 San Pawl il-Bahar: To sanction layout of apartment as is. Previous permit is PAPB524/87.
- PA/03345/21 San Pawl il-Bahar: Internal alterations and modifications to party wall
- PA/04501/24 San Pawl il-Bahar: Change of use from garage to a Class 4B beauty salon. Application to include the sanctioning of changes from previous permit covered by PA/1443/05, including…
- PA/05984/23 San Pawl il-Bahar: To sanction minor changes from approved drawings in PA/3931/05.
More by Russell Marmara
- PA/07842/25 Mosta: Proposed excavation and construction of basement garage levels -1, -2, -3, and -4, accessed from Triq Salvu Barbara via an adjacent ramp covered by…
- PA/07712/25 Mgarr: Proposed minor alteration to approved permit PA/5242/23. Proposed excavation and construction of water reservoir and level -5 basement garages. Proposed…
- PA/06799/25 Msida: Proposed minor internal alterations to approved permit PA3581/24. Such alterations include shifting of internal wall. Proposed change of use from Class 1A…
- PA/04282/25 Xewkija: To demolish existing dilapidated farmhouse, proposed reconstruction and additions.
- PA/02632/25 Mgarr: Proposed agricultural store, reservoir, pump room, timber gate and restoration of existing rubble wall.
- PA/02487/25 San Pawl il-Bahar: To demolish existing building and to excavate and construct level -1 basement with 3 garages and 3 other parking spaces, Class 4B shop at ground floor level,…
All applications by Russell Marmara
More from Peter Vella
- PA/00272/26 San Pawl il-Bahar: Proposed demolition of existing terraced houses. Proposed excavation of basement garage and reservoir. Proposed construction of; garages at basement and…
- PA/06701/25 Hamrun: Proposed alterations at ground floor. Proposed demolition of existing first floor and washroom at second floor. Proposed retention and restoration of facade,…
- PA/03177/25 Xaghra: To excavate and to construct a pump room with an underlying water reservoir. To also reconstruct rubble walls.
- PA/07126/24 San Pawl il-Bahar: Retention of facade, demolition of the existing building and the construction of an office (Class 4A) at ground floor level and six overlying dwelling units.
- PA/06683/24 Balzan: 1) To block off staircase from underlying offices to 3rd floor; 2) Change of use from Class 4A to Class 1 and extension of existing receded 3rd floor to full…
- PA/03135/24 San Pawl il-Bahar: Proposed excavation and construction of 1 garage at ground floor level and construction of 5 apartments from ground floor level upwards, including a penthouse…