PA/00333/24: construction of ground floor as 2 in San Pawl il-Bahar
Land at, Triq il-Mosta, San Pawl il-Bahar
Proposed construction of ground floor as 2 (two) Class 4B shops, 6 levels of apartments. Proposed sign.
- Status
- Granted (This application has been approved by Planning Board / Commission.)
- Location
- Land at, Triq il-Mosta, San Pawl il-Bahar
- Locality
- San Pawl il-Bahar
- Applicant
- Matthew Psaila
- Perit
- Perit Joseph Bondin
- Application type
- Full development permission
- Zone
- Within Development Zone
- Type of works
- Signage
- Height
- 7 floors
- Received
- 20 November 2023
- Validated
- 24 January 2024
- Published
- 24 January 2024
- Comments close
- 23 February 2024
- Recommendation
- Grant Permission
- Decision
- Grant Permission
- Decision date
- 26 April 2024
- Permit expires
- 8 May 2029
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around Land at, Triq il-Mosta, San Pawl il-Bahar
200 other applications within 300 m: 114 granted, 11 refused, 27 pending. 91% of decided applications nearby were granted. Tallest granted nearby: 8 floors (PA/05349/23).
On Triq il-Mosta: 19 other applications, 7 granted and 2 refused; granted buildings are typically 6 floors, the tallest 7. Periti active on this street: Henry Attard, Jean Pierre Attard, Gilbert Bartolo.
Approval estimate for signage applications like this here: about 92% (likely range 62–100%, low reliability, from 2 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/01336/26 San Pawl il-Bahar: Minor internal and external alterations and construction of airspace to an existing pre-1967 first floor maisonette to erect 5 in no. one bedroom apartments…
- PA/02958/21 San Pawl il-Bahar: Sanctioning of area for tables and chairs, installation of umbrellas, proposed areas for tables and chairs.
- PA/05990/24 San Pawl il-Bahar: To sanction existing property as built, shop sign and retractable canopy, change of use from Class 4B to part pastizzeria and takeaway.
- PA/04851/23 San Pawl il-Bahar: Demolition of property at first floor. To construct apartments at first, second, third, fourth, fifth and sixth floor (9 units) and penthouse at setback floor…
- PA/03588/25 San Pawl il-Bahar: To demolish site in two phases, excavate for foundations and proposed extension to Class 4D restaurant approved in PA/04429/08. Proposal also includes…
- PA/07414/26 San Pawl il-Bahar: Proposed construction of four overlying floors with 6 apartments per floor and three penthouses at setback floor level.
- PA/02852/23 San Pawl il-Bahar: Proposed internal and external alterations. Proposed extension at fourth floor and construction of another floor.
- PA/06405/23 San Pawl il-Bahar: To propose an extension over an existing two block of apartments. One block is proposed to be extended by 3 floors and a setback floor and the other by 2…
- PA/03243/25 San Pawl il-Bahar: To sanction existing apartment
- PA/07680/23 San Pawl il-Bahar: To sanction existing apartment approved in PA/6221/19.
- PA/00396/21 San Pawl il-Bahar: Sanctioning of differences to PA/01368/19 including minor internal changes, and the extension of common corridor at penthouse level between common parts and…
- PA/06286/24 San Pawl il-Bahar: Change of use Class from 4B retail (general) to Class 4B mini-market/green-grocer.
- PA/04347/23 San Pawl il-Bahar: Change of use from 2 car garage to Class 4B retail outlet and alteration to main aperture on façade.
- PA/03923/23 San Pawl il-Bahar: To sanction railing and to split the 4th floor apartment into 2 apartments and to develop 2 apartments instead of the penthouse at 5th floor level. An…
- PA/08240/24 San Pawl il-Bahar: Change of use from garage to public service garage.
More by Joseph Bondin
- PA/07614/26 St Julians: Proposed changes in layout to approved Class 3B hotel in PA/2151/23, changes include merging of property to existing hotel approved in PA/6725/20. Proposal…
- PA/07580/26 Mosta: Proposed demolition of existing townhouse and change of use from Class 1 residential to construct Class 3A five-storey guesthouse comprising a total of 18…
- PA/07514/26 San Pawl il-Bahar: Proposed change of use at first floor level from Class 4A offices to Class 2C educational institution for foreign students coming over to Malta for…
- PA/07400/26 Ghaxaq: To demolish existing building, to excavate 3 basement levels and construct 5 story apartment building with pools at ground floor and roof level.
- PA/07349/26 Birkirkara: Proposed alterations and correction of site following survey as built for levels which have been approved by planning applications PA/2035/20 and PA/4006/22.…
- PA/07300/26 Qormi: Proposed demolition of existing building, excavation of 3 basement levels for parking and construction of six levels building including showroom Class 4B,…
All applications by Joseph Bondin
More from Matthew Psaila
- PA/02707/26 Floriana: To propose the change of use of an approved PA/04756/21 Class 4A office and Class 3A guesthouse, to a Class 3B hotel including a Class 4D restaurant. The…
- PA/01021/26 Msida: Internal alterations and change of use from 4nr residential units and 1nr Class 4B shop approved at street level in PA199/25 to 3nr Class 4A offices, 2nr…
- PA/06781/25 Swieqi: To sanction differences between approved drawings in PA/07672/22 and existing drawings.
- PA/06352/24 San Pawl il-Bahar: To sanction alterations to approved PA/07593/19.
- PA/04174/24 Gharghur: Proposed extension of washroom towards back of property including minor, internal variations. Proposal includes for sanctioning of variations to façade…
- PA/03018/24 Mosta: To propose minor internal alterations only to existing office space [Class 4A], by creating a kitchenette, a small storeroom, another store room for filing…