PA/00668/23: Repairs and realignment of an existing deteriorated in San Pawl il-Bahar
Slipway, Triq il-Luzzu, Qawra, San Pawl il-Bahar
Repairs and realignment of an existing deteriorated slipway. This intervention will also consist of the resurfacing of the existing slipway with an anti-slip finish and to relocate an existing on site parking space to an new location to further facilitate vehicular access whilst entering or exiting the slipway as per the revised drawings.
- Status
- Granted (This application has been approved by Planning Board / Commission.)
- Location
- Slipway, Triq il-Luzzu, Qawra, San Pawl il-Bahar
- Locality
- San Pawl il-Bahar
- Applicant
- Kevin Farrugia
- Perit
- Perit Frank Muscat
- Application type
- Full development permission
- Zone
- Within Development Zone
- Type of works
- Other
- Received
- 7 December 2022
- Validated
- 22 February 2023
- Published
- 22 February 2023
- Comments close
- 24 March 2023
- Recommendation
- Grant Permission
- Decision
- Grant Permission
- Decision date
- 10 May 2024
- Permit expires
- 22 May 2029
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around Slipway, Triq il-Luzzu, Qawra, San Pawl il-Bahar
81 other applications within 300 m: 61 granted, 1 refused, 3 pending. 98% of decided applications nearby were granted. Tallest granted nearby: 11 floors (PA/02964/23).
On Triq il-Luzzu: 11 other applications, 9 granted and 0 refused; granted buildings are typically 7 floors, the tallest 7. Periti active on this street: architecture 360, Michael Camilleri, Matthew Psaila.
Approval estimate for other applications like this here: about 94% (likely range 64–100%, low reliability, from 4 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/01657/22 San Pawl il-Bahar: Demolition of existing boathouse and construction of Class 4D restaurant at ground floor level and overlying 5 apartments and 1 duplex penthouse.
- PA/05727/24 San Pawl il-Bahar: Increase in site extents further to PA/01657/22 and change of use at ground floor level from Class 4D to Class 1 garages for private cars. Demolition and…
- PA/04550/23 San Pawl il-Bahar: To sanction Class 4D kitchen flue.
- PA/01718/24 San Pawl il-Bahar: Renewal of PA/0059/19 for the proposed development including internal alterations and construction of additional floors.
- PA/07485/23 San Pawl il-Bahar: Proposed alterations to an existing Class 4D outlet approved in RG 764/22, to change the front and rear part of the Class 4D outlet at ground floor level into…
- PA/04917/24 San Pawl il-Bahar: To demolish existing building, excavate for basement parking level and construct 8 floors building consisting a total of 2 maisonettes and 13 apartments.
- PA/02692/26 San Pawl il-Bahar: To convert existing apartment into maisonette, including minor external alterations. To include a parking space within a paved area. To reduce existing waste…
- PA/02784/26 San Pawl il-Bahar: To change the use of 7 approved shops (Class 4B) in PA/3875/21, to Class 1 residential units and Class 4A. Proposal includes minor internal and external…
- PA/06654/25 San Pawl il-Bahar: To make minor internal and external alterations to existing approved shops. Proposal includes the formation of a Class 4A office.
- PA/05400/25 San Pawl il-Bahar: To change the use of an existing Class 4B shop (commercial) into a Class 3C (assembly and leisure) commercial outlet including minor internal alterations.
- PA/01862/25 San Pawl il-Bahar: Proposed change of use from approved garage no.127, as per PA/10797/17 to public service garage.
- PA/00959/23 San Pawl il-Bahar: Change of use of approved Class 4B commercial to Class 1 residential units (12 in total).
- PA/07775/25 San Pawl il-Bahar: To change use of existing, basement level -2, domestic garage to a public service garage (for garaging of 'Y-plate' vehicles).
- PA/05404/25 San Pawl il-Bahar: To change the use of an existing Class 4B commercial approved in PA/10797/17 to a Class 4C commercial outlet including minor internal and external…
- PA/06350/25 San Pawl il-Bahar: Minor external alteration which included repositioning of glass railing at roof level (block D, penthouse 1) having a different layout from PA10797/17.
More by Frank Muscat
- PA/07148/26 Kalkara: To sanction internal and external variations from approved PA/1370/12, and proposed part change of use from Class 4D to Class 4B shop, internal partitions and…
- PA/06554/26 Santa Venera: Proposed internal alterations within an existing private institution to provide 11 self-catering temporary social housing units (Class 2A). Proposal includes…
- PA/05700/26 Qormi: Proposed relocation of approved domestic store/garage to basement level, introduction of a retail outlet store room (Class 4B) serving the adjacent retail…
- PA/03198/26 Santa Venera: To include a store room at the razzett in Romeo Romano Garden.
- PA/02975/26 Rabat (Gozo): Proposal for a temporary ambulance support area comprising shaded ambulance parking, offices, and staff administrative facilities.
- PA/02947/26 Kercem: Proposed excavation and construction of new dwelling which includes, ground and basement level, reservoir and reinstating soil at roof level.
All applications by Frank Muscat
More from Kevin Farrugia
- PA/02049/26 Rabat (Gozo): Change of use from Class 4B to a residential unit.
- PA/05416/25 Attard: Proposed part extension of the existing third floor plan and construction of a washroom at fourth floor to the property covered by RG00396/23.
- PA/02860/25 Zurrieq: Proposed excavation and construction of an underground water reservoir, small pump room and sanctioning of gate.
- PA/02724/25 Ghajnsielem: Excavation of site and construction of garages at basement and ground floor levels, and overlying 12 residential units.
- PA/06590/24 Qala: To demolish existing residential unit and construct ten residential units and eight garages.
- PA/02653/24 Ghajnsielem: Demolition of existing dwelling, excavation and construction of basement garages with overlying 9 residential units.